docs: recover scientific frontier and score production mechanisms - #267
docs: recover scientific frontier and score production mechanisms#267LightChainr wants to merge 272 commits into
Conversation
|
Minimal CI repair pushed in |
…riority-refresh-20260829
…riority-refresh-20260829
…riority-refresh-20260829
|
Lifecycle drift note after
Therefore the N325/N425 common stream remains high value, but |
Frozen q2 local-D4 lifecycle resultThe preregistered paired-orientation, two-radius mean local landing-D4 selector has completed on Huawei ARM64. N65 and N130 each used 1,000,000 paired replicas, 100 batches, eight threads, disjoint seed/counter domains, and byte-identical runner binaries.
Artifacts, 40x40 delete-one covariance, provenance and hashes: commit eea85c4. The >100 MB sparse per-replica streams remain at the recorded Huawei paths with SHA256; all scoring sufficient statistics are committed. No new PR was opened. |
|
Three-generation post-reveal is complete on branch Phase-first result:
Decision: the 20k-pilot phase coincidence did not reproduce. This rejects bare primitive-line mean J_D4 as the proposed scalar q2 H4 carrier; it does not reject the established global H4 response or a new external/local observer coupling. Post-reveal diagnostic (not a rescue): P4 mean J_S4 magnitudes grow by 1.277 and 1.289, close to thermal 2^(3/8), with alternating phase. If this source remains interesting, the next discriminant must freeze a two-step/matrix transfer and add an independent second coordinate; the q4 coincidence cannot be upgraded to a q2 pass. The first Zy setup failure is retained and excluded in provenance. Only |
…riority-refresh-20260829
|
Target 3 now has a strict semantic gate and a frozen missing-cell design at commit 420d2a9 on branch analysis/p267-target3-context-rectangle-20260829. Result: PR277 U/r2-r6 and P253 A_plus/A_minus share neither source nor readout. The former are global threshold-rank Bernoulli derivatives under cover generation; the latter are fixed-p root-toggle conditional landing-H4 amplitudes under radius transfer. Normalization and batch contracts differ too. Therefore zero existing cross-context pairs are numerically eligible, and no rescaled or renamed pseudo-rectangle is reported. The actual 2x2 is:
N425 is selected with the complete annulus covariance, but its minimum adjacent lambda Mahalanobis squared is only 0.04332, so this is a design freeze rather than a mechanism result. The held-out score compares three fixed shared-generator diagonals lambda={0,1/2,1} against nine fixed context-pair rows, with a composite-null parametric bootstrap and full dependency handling. The reuse boundary is concrete. The P253 cyclic runner validates all primitive parents at R2; it rejects the nonprimitive Smith-(2,N/2) children. The only missing implementation is a general-period geometry adapter using the existing integer-period backend while preserving P253 event semantics and statistics verbatim. Production remains unauthorized until that adapter, tiny exact equivalence and synthetic scorer recovery pass. Artifacts: analysis/p267_gaussian_annulus_missing_cells_20260829.yaml, machine result/report, note, checksums, script and 5 tests. No PR was opened or merged. |
|
Additional lifecycle update for the navigation map: Issue #122 now has a real production full-shape analysis at The four finite-N comparisons reject exact standardized shape equality, but norm-2 and norm-5 cover changes from the same parent are nearly rank-one (cosines |
…riority-refresh-20260829
Target 2 model-development pilot: named non-A_top complex C3 rowA 100k common-field pilot now measures the full primitive-homology automorphic harmonic
Interpretation: the first typed complex row is not a clean weight-4/r1 character at this precision and instead nominates a small multi-character or finite-Pell mixture. This is model development, not renewed H4/H8/H12 voting. Full 6x6 common-field covariance, transformed C3 covariance, exact 65,536-mask oracle and provenance are in 8ed805f. An independent 2M/child production discriminator is being preregistered before acquisition. |
|
Navigation drift update from current Commit |
P337/#537 route update from Draft PR #545The bounded landing-minor falsifier listed here as the next action is now complete. Decision:
which is Validation in #545: 11 exact tests, independent BFS source reconstruction and potential-UF rank reconstruction on all 65,536 L4 states; no sampling or N25 extension. Routing consequence: do not continue the pure-thermal rank-one cancellation route or assume that all ordinary three-packet landing terms vanish before proving a four-packet remainder. The next canonical object is the signed normalized aggregate residual with kernel, readout and pooled-root terms kept in the same covariance bundle. The explicit witnesses are not an asymptotic lower bound, so #537 remains open for its critical/near-critical rate. |
|
2026-09-01 external-review integration update (commit 003391a):
Only the four focused analysis scripts, YAML/JSON parsing, and git diff --check were run. No new Monte Carlo, GPU/cloud/server work, issue lock/close, merge, rebase, or force-push. This PR remains Draft. |
|
Closure update pushed at cb07694. The overview and machine ledger now absorb the held-out N145 H0 gate, the exact Gaussian unit-rotation real-line theorem, and N145_FULL_T_UNRESOLVED. The previous primitive-H8 interpretation is explicitly superseded as an angle alias. For original-U mechanism identification, current assets are now classified UNIDENTIFIABLE_WITH_CURRENT_ASSETS because vacuum/Ward and thermal-Q4/Jordan do not yet define their same-source restricted-trace thermal columns. The only reopening input is two complete theory columns; no new angle, size, descriptor, certificate or free exponent substitutes for them. PR remains Draft; no lifecycle changes or new production. |
Large-scale decision portfolio after Draft PR #546Commit Delivered:
Decision: The highest new conditional large design is a stabilizer-free generic-modulus full homology-vector transport, which leaves the exact Gaussian unit alias. The most concrete structured control is #156/#159 recast as an actual-modulus Pell/Eisenstein vector Taylor jet, with a smaller power pilot and square-bond control before N418/N780. The N650/N850 Gaussian commuting square remains cost-stopped; transfer-matrix and rigorous-block routes remain behind measured reproduction or power gates; #227 is narrowed to a within-irrep curve-level pilot. No server, GPU, Monte Carlo, top-up, Issue lifecycle change, merge, rebase or force-push was performed. PR #267 remains Draft. |
科学信息恢复+#275 原始观测量与可识别预测路由
继续保持 Draft。本 PR 不合并
main,不关闭、锁定或批量改名 Issue,不把优先级变成许可系统,也不 rebase/force-push。已完成的机制链
固定
Kreg=K2+K0与完整 original-U moving-root/slope functional 的 N100/N400 macro-window pilot 已按合同停止:两个 simultaneous intervals 均含零、点估计异号,N400 生产投影超过 2M 上限。D17/D21未评估;不 top-up、不换 window、不拟合自由指数。64 个旧 counter 的 pivotal preflight 也按合同停止。共同物理扇区与 edge/contact 链已经前移:
c958b30b在同一 N25 exact population 中保存 joint 12-port identity;118/1,390 sectors、106/106 pooled rectangles 与 30/30 complete two-geometry rectangles exact nonzero。same-sector determinants 仅占 coarse determinant0.2101274%,所以 coarse amplitude 以 cross-sector mixing 为主。22f01e33的 kernel-changing graph 有6,846classes、740,950fibres,signed mass-4.9488399165e-6,判决TWO_INDEPENDENT_DEFECT_GAIN_REJECTED。在固定 NN-thermal selected set 内 no-contact mask 恰为空;automatic two-independent-defect/six-arm 路线被排除。df4a64f6保留 stage×contact,exact N25 matrix 为[-2.88380e-6,-2.93729e-6; -5.32257e-6,+6.19482e-6],det=-3.3498535471e-11。幸存对象是contact fusion × topological completionrank two,而不是 scalar contact loading。Held-out N65 transmission 与 full-T share 已完成
Commit
f46c38c3使用冻结的 20M N65 block、四 shards、100 batches、独立 P45 baseline 与 no top-up,得到:[-1.57857e-7,-9.22766e-8; -3.09130e-7,+3.69680e-7];-- -+;Delta_cs=-8.6882161e-14,SE1.4139777e-14,95% CI[-1.1459612e-13,-5.9168198e-14];CONTACT_FUSION_COMPLETION_TRANSMITS。这些 cells 是 pooled-root Schur
T_tnumerator allocations;尚未逐格除以M_t或乘A_N,不能改名为完整 cellwiseJ/U或机制份额。Branch-only
95a695c7保存完整 P45/new-MC covariance,并做明确标注的 adaptive shape check:single-amplitude N25→N65 模型chi2=10.3371/3、p=.01591。它与f46c38c3使用相同 seed 与 byte-identical shards,是一次 production 的依赖重分析,不是第二票。同一 branch 的
bab37f21把 determinant 写成 noncommuting completion commutator,并给出 post-revealN^-3/N^-29/8fingerprint;这是机制候选,不是 field identification。Current branch headf9ba1ff6用相同 N65 sufficient statistics 重建 complete response:J65=-.00162250989+/-.00018553008;J65/J25=.29396323+/-.03361398;T25的5.892%降到 fullT65的2.551%;.0155%的|J65|。所以 typed carrier 确实传输,但不饱和 original response;carrier closure 不再是默认解释。所有 N65 结果属于同一 dependency group。
PR #509 仍是 OPEN Draft,live head
ac5f5fe7;PR #544/#545 保持仓库团队既有的 closed-unmerged 生命周期。本 PR 不复活、合并或改写这些对象。当前 P0:#275 已完成第一轮 production forward-identifiability score
仓库团队已把 #275 调为 OPEN P0,把 #537 保留为 OPEN P1 theory。本 PR 只观察并记录该优先级变化。
本分支已经完成 raw-observable/normalizer dictionary,并把现有 norm-4
K1/K2production 的完整选定12 x 12aligned covariance 用于第一次机制判别;没有生成新 Monte Carlo:
kappa=.5:chi2=11.792466/4,p=.018963,排除这个具体参数化;chi2=6.432527/4,p=.169092,尚未排除;kappa:最优2.114984508,即delta=-1.080647096,是相对增长模,不支持“更 irrelevant bulk singlet”的读法;0<kappa<1没有内部最优,infimum 落在kappa -> 1-的 Jordan collision boundary;kappa -> 1包含完整 Jordan image,字面结论是PARTIALLY_IDENTIFIABLE、uniform_identifiability=false。Jordan compatibility 不是 Jordan operator identification。因此下一交付不再寻找更多描述性坐标,而只补一个
restricted_trace_modulus_or_phase_transport:同一Bsource、originalq/E、pooled-root physical normalizer 下的 rank-0/rank-2 restricted-trace传输关系。优先理论推导 independent-singlet 与 Jordan-top 的 modulus/
character vectors,再评分已有 rho-child 或 P43/P57 assets;只有理论不能
给出该关系时,才考虑同一
Bcolumn 的 phase-calibrated second rotation。并行 C3 rank audit 也已经给出精确边界:单一物理角度、任意 complex
amplitude 时 H4/H8 的 real design images 都是
R^2,所以即使现有Etop_r1显著非零也严格不可识别。只有先冻结跨角 gain law,第二旋转才有信息;signed-real contract 推荐
delta=pi/24(7.5 度),而pi/12(15 度)exact alias。任意独立 complex gain 下,任何第二角度仍不可识别。
一个 unnormalized numerator character zero 不能自动穿过 twist-dependent normalization。声称 common vacuum/Ward differential operator 的候选,必须证明它在 rank0/rank2 restricted traces 上按同一规则作用;否则必须给出明确 defect/contact/normalization 项。Q4/Jordan 候选也必须给 restricted-sector prediction,而不是借用同-spin field label。
并行 P1 / P2
zledger、N85 normalized-tensor comparison 与 fresh N130F=C+Rpartition 都是 conditional support;只在 [P0 theory] Original Matching-One observable: homology-marked trace, normalization, and identifiable predictions #275 冻结原始 observable/normalizer 与相反预测后再启动,不进入当前 production queue。仓库与执行边界
README、STATUS、RESEARCH-MAP、ROADMAP、NEXT-TARGETS、DECISION-EXPERIMENTS、TEAM-COORDINATION 及 machine-readable ledger/registry 统一记录 lifecycle、observer/sector、dependency、full-T share 与新的 #275 prediction contract。
branch_only/open_pr不提升为main_integrated。本轮没有合并、Issue lifecycle 变更、历史重写或其他服务器操作。只做一次最终 YAML/引用/whitespace 一致性检查;冲突主工作树未触碰,PR #267 继续保持 OPEN Draft。