The source requirements are strong, but several operational rules must be made explicit for implementation.

3.1 Non-destructive records

The following records are never physically deleted:

  • Person
  • Collaborator
  • Current Account Entry
  • Mine Well Production
  • Gold Price
  • Price List Items
  • Reference Data

Instead, records are managed with status flags, activity flags, effective dates, or reversal records.

3.2 Modular monolith first

The recommended architecture is a modular monolith, not microservices, because:

  • business rules are tightly coupled,
  • SQLite is the requested database,
  • deployment simplicity matters for remote operations,
  • transaction safety across accounting workflows is easier in one process,
  • future extraction to services remains possible.

3.3 Ledger is the source of truth

Balances are derived from immutable current-account entries and reversals, not from mutable balance fields.

3.4 Dual-currency ledger

The system tracks accounting in two units:

  • BRL (Real)
  • Gold grams

A current-account entry belongs to exactly one currency. Summaries compute balances separately for each currency.

3.5 Salary accrual cadence

Because salary is specified as a monthly salary, but work planning operates in daily work periods, the design assumes:

  • monthly salary is normalized to a daily accrual rate for daily projected earning calculations,
  • the normalization formula is configurable,
  • the default formula is monthly_salary / 30.

3.6 Daily period model

Mine-well production is recorded by:

  • date
  • period
  • well

Each period is a 12-hour shift. The plan/accrual engine uses a formal work_period entity to anchor planning and earnings.

3.7 Commission basis

Commissioned collaborators earn based on:

  • assigned work well,
  • work period,
  • recorded well production,
  • collaborator commission percentage.

If required production is missing, accrual status remains pending until production is recorded.

3.8 Sick-day and license rules

The specification implies substitution-based earnings transfer logic. The implementation will support explicit substitution links so every exception is auditable.

3.9 Work journey lifecycle

A collaborator journey has:

  • start date,
  • default end date = start date + 90 days,
  • extension days,
  • projected end date = default end + extension days,
  • status transitions,
  • closure workflow.

3.10 Role model

Initial recommended roles:

  • Administrator: full access
  • Planner: planning, accrual, production support
  • Mercantile Operator: expense entry, read summaries
  • Finance Viewer: read-only reports and ledgers