Managed Release Finalization And Open Decisions

sergio velderrain edited this page Nov 9, 2026 · 1 revision

Managed Release Finalization And Open Decisions

The operator selected a guarantee for the ProjectBuddy managed release workflow only. It includes a future managed path to promote an eligible draft originally created by that workflow, with fresh verification before publication. The operator selected managed-created drafts only; adoption of an externally created draft is not part of this path. Direct publication through a UI, CLI, or API outside that workflow is outside the guarantee; this draft does not claim to prevent it. The current release.yml implements neither the qualification verifier nor a managed draft-promotion path.

The managed creation path retains the existing rejection of a version tag that predates its intent. A promotion may use a tag independently proven to belong to the same managed draft intent, if a tag exists; it must not accept an arbitrary pre-existing tag. Resolve the candidate SHA once and bind both the requested full tag ref and the release to it. Independently resolve any actual tag to its peeled commit, including an annotated tag where applicable; an unsupported, broken, mismatched, or unverifiable reference cannot pass. A concurrent actor creating the same tag remains a relevant interference with the managed path, even though that actor's own out-of-band publication is outside the guarantee.

The official release API states that target_commitish is unused if the tag already exists. Passing a resolved SHA as --target therefore does not close a tag check/create race. The inspected sources do not establish when every draft-creation path creates its tag. Gate draft creation and tag creation independently, without assuming either order. If a tag is absent during draft creation, do not claim a binding that has not been established; before publication, either prove the actual tag target and protect it through publication, or prove an equivalent atomic create-and-publish binding. The latter is not established by the inspected sources. A post-publication readback alone cannot prevent an already incorrect publication.

The release API's get-by-tag endpoint describes published releases; a 404 there does not establish that a draft is absent. Listing drafts requires sufficient access and complete pagination, and pagination alone is not proof of a consistent snapshot while the inventory changes. Unauthorized, incomplete, inconsistent, or otherwise ambiguous inventories are UNKNOWN, not absence. The Git reference API also uses 422 for validation or abuse conditions; do not interpret every 422 as an existing tag. The CLI release documentation describes separate draft, asset-upload, and publication requests when assets are attached, and says immutability protections begin only after publication if enabled. No current repository setting or atomicity across GitHub and a separate evidence authority is established here.

Before any request that can create a draft, create a tag, or publish a release, retain an independently durable, recoverable intent. Its logical inventory includes a unique operation identity; repository identity; full tag ref; resolved candidate commit; operation kind; managed release ID when known; required proof identities and policy revision; and workflow run and attempt provenance. The private schema, authentication, durable authority, and GitHub-side attribution or exclusion mechanisms remain unselected. An intent does not itself prove that the remote side effect occurred or that it was performed by this request.

State or condition Required evidence and permitted progress
PREPARED The exact intent and applicable proof are independently recoverable before dispatch. Missing authority or intent blocks the side effect.
IN_FLIGHT A request may have been accepted. A timeout, canceled client, lost response, or indeterminate authorization result does not establish non-commit or terminality.
DRAFT_RECORDED An independently identified managed release is confirmed as a draft and linked to its original intent and candidate. Verify any existing tag; do not assume that a draft necessarily created one.
PUBLISHED_RECORDED Independently confirm the release ID, published state, actual tag target, and proof link under the selected finalization policy. Readback is necessary but cannot replace prevention of a pre-publication race.
UNKNOWN or conflict Preserve the obligation, report it explicitly, and block dependent mutations and success until the exact outcome and possible late effects are reconciled. A confirmed conflict is FAIL; ambiguity is UNKNOWN.

A matching tag name and SHA do not by themselves prove that an ambiguous request created that tag. Another actor may have created an identical ref. Likewise, a draft with the same tag is not necessarily the intended draft. No blind retry or new attempt may erase an unresolved request; retry only under a proven same-intent idempotency and fencing protocol, and authorize dependent mutations or success only after the outcome and possible late effects are reconciled. Such a protocol must bind the operation identity to the complete intended request and prevent duplicate or substituted effects; GitHub support for it has not been established. A proven successful earlier side effect still needs current proof revalidation before a later publication. Protect intent history and pending obligations against local rollback; a missing journal is not proof that no request was sent.

Two decisions remain open before a successor ADR or implementation:

  1. GitHub administrator trust. Decide which GitHub principals can be trusted not to alter the managed workflow, tags, evidence, and enforcement during finalization. Host root's previously selected trust is a separate boundary. Direct unmanaged publication remains out of scope under either choice; interference with an in-scope managed operation must still be addressed or leave it UNKNOWN.
  2. In-flight revocation ordering. A strict side-effect ordering would block an effect if revocation commits first, but needs a proven mechanism to order the independent authority and GitHub side effect. A committed-authorization cutoff could instead order revocation against a durable permit, but its consequences for a revocation after that cutoff and before actual publication must be explicitly chosen; it must not be silently treated as a post-publication event. Neither a preflight check, an ordinary cooperative lock, nor a post-publication read proves either policy. Address an LUnit proof reaching its existing 90-day limit during finalization as well.

Neither alternative is selected or proven. No production finalization implementation may be claimed safe until the threat model, ordering, permissions, recovery and late-request fencing are specified and their feasibility is verified.

For evidence revoked after a managed publication, the selected response is to record and signal the affected release, block new managed release operations, and require an operator response. Do not automatically withdraw the published release. Preserve a protected release-to-proof history and verify current revocation and incident state before another managed release; unavailable or unverifiable state is UNKNOWN. The monitoring mechanism, detection latency, operator authorization, and conditions for clearing the block remain to be decided. Read-only reconciliation and incident handling remain possible while releases are blocked; no instantaneous detection or automatic unblock is claimed. The incident record is separate from the six-field public qualification summary and must not expose protected evidence or secrets.

The existing release procedure's asset review remains relevant, but this qualification design does not establish asset provenance, asset integrity, release-note integrity, or wiki and downstream-consumer promotion. Those claims require their own scope and evidence.