The system shall require current applicable qualification proof for each managed release effect.
Draft creation and later publication need separate readiness checks.
Missing, expired, revoked, mismatched, or unverifiable required proof blocks the effect; an eligible managed draft is revalidated before publication.
Planned managed-gate verification; TEST-075, TEST-081, TEST-084.
TEST-075
TEST-081
TEST-084
System-Requirements-Specification
High
TEST-075, TEST-081, TEST-084
Planned managed-gate verification
REQ-075, REQ-081
Planned
There was an error while loading. Please reload this page.