Skip to content

research(aif-handoff-bridge): Sub-wave D — Synthesis + cross-variant verdict (DEFER-all-with-updated-triggers) - #281

Merged
artyhoo merged 1 commit into
stagingfrom
research/aif-handoff-bridge-synthesis
May 29, 2026
Merged

research(aif-handoff-bridge): Sub-wave D — Synthesis + cross-variant verdict (DEFER-all-with-updated-triggers)#281
artyhoo merged 1 commit into
stagingfrom
research/aif-handoff-bridge-synthesis

Conversation

@artyhoo

@artyhoo artyhoo commented May 29, 2026

Copy link
Copy Markdown
Owner

Summary

Cross-variant synthesis Sub-wave D consolidating the four variant evaluations from Sub-waves A/B/B'/C (merged PRs #267/#268/#275/#276). Per-variant verdicts re-derived independently per T15 — verdicts produced by this synthesis are CONSISTENT with predecessor patches (validation, not re-litigation).

  • Variant A (MCP-consumer, explicit invoke) = REFERENCE (28% match; 3 ADOPT-blockers persist)
  • Variant B (native fs-watcher) = REJECT (~5% match; upstream feature absent; DECISION=C HARD violated)
  • Variant B' (hybrid CC-hook + existing MCP) = REFERENCE conditional ADOPT VOCABULARY (~35% match; inherits A's blockers; upgrades if A greenlit + DN-1 adopted)
  • Variant C (minimal bridge / Implementer-only) = REJECT (~22% match; BEFORE/AFTER 25% literal / 0% cognitive ≪ §8 STOP 30% threshold)

Cross-variant recommendation per kickoff §6.5: DEFER all variants with updated SSOT «Trigger to revisit» fields.

The synthesis includes:

Test plan

§1.7 Forward-check applied

See 2026-05-29-aif-handoff-bridge-synthesis.md §7 — covers build-first-reuse-default.md §1 verdict ladder, no-paid-llm-in-ci.md §1 (zero API-billed calls), reviewer-discipline.md §2 (DN-1/DN-2 consumed as input, no strategy pick), phase-research-coverage.md §1.7 + §1.12 (recommendation discipline + falsifier), ai-laziness-traps.md §3 (T1/T3/T7/T11/T12/T13/T15/T16/T17/T19/T20 all enforced), doc-authority-hierarchy.md §3, dual-implementation-discipline.md §2 (markdown-only carve-out), DECISION=C invariant, CLAUDE.md PR strategy + Artifact Ownership Contract.

§1.7 Backward-check applied

See 2026-05-29-aif-handoff-bridge-synthesis.md §8 — covers SSOT row touchpoints (additive-note-only, no verdict changes to #27/#28/#30/#44/#67/#80), no predecessor Sub-wave verdict superseded, no rule/skill/agent/install.sh/kickoff modified, scope strictly within Sub-wave D, DN-1/DN-2 consumed as input (not re-litigated), T15 self-application confirmed, memory not written.

Prior-art: prior-art-evaluations.md#27, #28, #30, #44, #67, #80 (existing aif-handoff entries, additive-note-only — no verdict changes); SSOT row #85 PROPOSED, not landed.

…verdict (DEFER-all-with-updated-triggers)

Cross-variant synthesis consolidating Sub-waves A/B/B'/C (merged PRs #267/#268/#275/#276). Per-variant verdicts re-derived independently per T15: A=REFERENCE (28%), B=REJECT (~5%), B'=REFERENCE conditional ADOPT VOCABULARY (~35%), C=REJECT (~22%). Cross-variant recommendation per kickoff §6.5: DEFER all variants with updated SSOT «Trigger to revisit» fields.

Includes 20-cell comparison table (4 variants × 5 criteria, file:line citation per cell), 4-row T16 problem-class match table, DN-1 (B-constrained) + DN-2 (B' is operative B-path) reflections, hook-discipline (Decision 10) analysis (no equipoise → recommend on clearly-better evidence; DECISION-NEEDED NOT warranted), consolidated SSOT additive notes for #27/#28/#30/#44/#67/#80, proposed new SSOT row #85 (next-after-#84 verified).

Prior-art: prior-art-evaluations.md#27, #28, #30, #44, #67, #80 (existing aif-handoff entries, additive-note-only — no verdict changes); SSOT row #85 PROPOSED, not landed.
@artyhoo
artyhoo merged commit 5c43d6b into staging May 29, 2026
22 checks passed
artyhoo added a commit that referenced this pull request May 29, 2026
…DONE (#283)

Per umbrella's post-GO directive (Phase -1 Stage 3 close-review GO 2026-05-29 on
PR #281 SW-D synthesis), update wave-sequencing-plan.md §0 to reflect umbrella
closure:

- Row update: stale 🟡 «Sub-wave A + B R-phase done / synthesis pending» →
  ✅ DONE 2026-05-29 with verdict DEFER ALL. Full per-variant scoring
  (A REFERENCE 28% / B REJECT ~5% / B' REFERENCE 35% conditional / C REJECT 22%)
  + 3 ADOPT-blockers shared across A/B'/C + 6 evidence PRs (#267/#268/#269/
  #275/#276/#281) + SSOT additive notes status (proposed, not landed).
- Renamed row to canonical umbrella name (`aif-handoff-as-runtime-bridge`).
- «What actually remains» — remove the umbrella entry; add to deferred-decisions
  parenthetical at bottom of the line.
- Plan revision history — add this PR.

No verdict changes to any other §0 row. No edits outside §0. Broader 40+ UNTRACKED
PRs in §0 (recordkeeping debt per state.md Decision 2) stay deferred — out of
scope for this umbrella's closure per CLAUDE.md PR strategy.

Prior-art: skipped — recordkeeping update for completed umbrella, no capability
commit, no new dependency, no new file ≥50 LOC. Per CLAUDE.md capability-commit
definition, this is a docs-edit grade change.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant