Council Role Project Manager
Arun Prakash edited this page Aug 14, 2026
·
10 revisions
Canonical source:
docs/council/agents/PROJECT-MANAGER.md· Snapshot commit:8affbc19d165
Translate the approved product and technical scope into an evidence-based delivery system with explicit dependencies, gates, owners, and completion criteria.
- Product requirements, UX specification, implementation plan, and council decisions
- Discovery artifacts and documented external dependencies
- Cross-review findings and implementation evidence
docs/project/PROJECT-TRACKER.md- Milestones, deliverables, epics, tasks, dependencies, status, risks, issues, decisions, assumptions, and readiness checklists
- Keep discovery completion separate from implementation progress.
- Make G1 shared-understanding confirmation the first execution-blocking gate after the G0 planning baseline.
- Represent spikes, evaluations, ADRs, credentials, infrastructure, tests, restore drills, and launch checks as real work.
- Give every task a stable ID, one accountable role, dependencies, evidence, and current status.
- Maintain a critical path without inventing calendar dates or effort commitments.
- Ensure every PRD requirement and UX state has build and verification coverage.
May sequence work and require readiness evidence. May not mark work complete without evidence, weaken acceptance criteria, spend money, provision services, or authorize deployment.
- Are blockers distinguishable from ordinary pending work?
- Does each milestone produce a reviewable deliverable?
- Are security, privacy, accessibility, backup, recovery, and operations included before launch rather than after it?
- Are all external actions authorization-gated?
- Is deferred scope visible without contaminating the MVP critical path?
- No invented dates, velocity, staffing capacity, or completion percentages.
- No status inflation from document creation to implementation readiness.
- No implicit credentials or access assumptions.
- No deployment or launch state without direct evidence.
Generated from arunpr614/Life-Reflection@6b8b70b72148 · Canonical content lives in Git · Fictional prototype data only
- Life in Days — Hetzner shared-host runbook
- Life in Days — Phase1 implementation plan
- PID R10 — Conditional Object-Store Transition
- PRD R0 — Shared-Host Private Foundation
- PRD R1 — Manual Journal Archive
- PRD R2 — Telegram Photo Capture
- PRD R3 — Retrieval and Date Integrity
- PRD R4 — Source History and Lifecycle Safety
- PRD R5 — Prospective VoiceNotes Sync
- PRD R6 — Generated Text Reflection
- PRD R7 — Generated Artwork
- PRD R8 — Operational Scale and Resilience
- PRD R9 — Private Launch Acceptance and Stabilization
- Life in Days release documents
- Life in Days Phase 1 — AI agent resource index
- Codex Goal prompt — Phase 1 P0 requirements to private production
- P0 Codex Gold Goal prompt — complete P0 and R0 only
- Phase 1 GitHub Project V2 sync
- Life in Days — Phase 1 Release Plan
- Life in Days — detailed implementation plan
- Life in Days Global PRD
- Life in Days — project tracker
- Life in Days — prototype completeness tracker
- Life in Days — requirements traceability
- Life in Days — UX specification
- Life in Days — AI Artwork Model Evaluation
- Life in Days — AI Text Model Evaluation
- Initial product brief
- Life in Days: Private Media Storage Evaluation
- Requirements under discovery
- Product and integration research
- Project Git provenance
- Life in Days — proposed shared understanding
- Life in Days — Product Council planning-baseline review
- Life in Days Phase 1 — Independent QA Lead charter
- Agent charter — Project Manager
- Agent charter — Senior Product Manager
- Agent charter — Technical Architect
- Agent charter — UI/UX Design Lead
- Life in Days Phase 1 — P0 Owner Action Ledger
- Life in Days Phase 1 — P0 execution context digest
- Life in Days Phase 1 — P0 execution authorization addendum
- Life in Days Phase 1 — P0 execution council charter
- Life in Days Phase 1 — P0 execution decision ledger
- Life in Days Phase 1 — P0 task Definition of Ready
- Life in Days Phase 1 — P0 execution-control review
- P0/R0 Stage 0 control-repair candidate review dossier
- P0/R0 Stage 0 delivery checklist
- P0/R0 Stage 0 rollback and recovery plan
- P0/R0 Stage 0 state contract
- P0/R0 Stage 0 test plan
- PC-001 readiness-control hardening — planning review
- Life in Days — Phase 1 Product Council Decision Record
- Life in Days Phase 1 — source baseline
- Life in Days Phase 1 — Product Council charter
- Life in Days — Product Manager Council Review
- Life in Days — Project Manager Council Review
- Life in Days — Product Council UX Design Review
- Life in Days Product Council
- Life in Days — calendar UI prototype
- Life in Days — calendar UI prototype v2
- Life in Days — unified Calendar and Almanac prototype v3
- Life in Days — Museum Margin Calendar prototype v4
- Life in Days — private Settings and compact privacy prototype v5
- Life in Days — private Search prototype v6
- Life in Days — Calendar contract prototype v7
- Life in Days — Cross-month Almanac prototype v8
- Life in Days — First-use Readiness prototype v9
- Life in Days — Resilient Application Shell prototype v10
- Life in Days calendar UI prototype
- Life in Days calendar UI prototype v2
- Life in Days unified calendar prototype v3
- Life in Days Museum Margin prototype v4
- Life in Days Settings prototype v5
- Life in Days — private Search prototype v6
- Life in Days prototype v7 — Calendar contract completion
- Life in Days prototype v8 — Cross-month Almanac
- Life in Days prototype v9 — First-use Readiness
- Life in Days prototype v10 — Resilient Application Shell
- v6 Product Council contract — Private Search State
- Life in Days prototype v7 — Product Council contract
- Life in Days prototype v8 — Product Council contract
- Life in Days prototype v9 — Product Council contract
- Life in Days prototype v10 — Product Council contract
- Life in Days v2 — design QA
- Life in Days unified prototype v3 — design QA
- Life in Days v4 — design QA
- Life in Days v5 design QA
- Life in Days v5 design QA
- Life in Days v6 — independent design and interaction QA
- Life in Days v7 — independent design and interaction QA
- Life in Days prototype v8 — independent design QA
- Life in Days prototype v9 — independent design QA
- Life in Days prototype v10 — independent design QA
- Life in Days prototype v5 — PRD feature audit
- AI agent operating contract — keep Phase 1 alive
- Contributing to Life in Days
- GitHub Projects Roadmap — current capability research
- Life in Days — Hetzner shared-host deployment spike
- Wayfinder for Life in Days Phase 1 — adoption and GitHub integration report
- Life in Days — GitHub Projects Roadmap design spike
- ARCH-R0-001 — Product Council task readiness
- ARCH-R0-001 — task delivery checklist
- ARCH-R0-001 — task design specification
- ARCH-R0-001 — task product requirements
- ARCH-R0-001 — task QA plan
- ARCH-R0-001 — task technical plan
- ARCH-R1-001 — Product Council task readiness
- ARCH-R1-001 — task delivery checklist
- ARCH-R1-001 — task design specification
- ARCH-R1-001 — task product requirements
- ARCH-R1-001 — task QA plan
- ARCH-R1-001 — task technical plan
- ARCH-R2-001 — Product Council task readiness
- ARCH-R2-001 — task delivery checklist
- ARCH-R2-001 — task design specification
- ARCH-R2-001 — task product requirements
- ARCH-R2-001 — task QA plan
- ARCH-R2-001 — task technical plan
- ARCH-R3-001 — Product Council task readiness
- ARCH-R3-001 — task delivery checklist
- ARCH-R3-001 — task design specification
- ARCH-R3-001 — task product requirements
- ARCH-R3-001 — task QA plan
- ARCH-R3-001 — task technical plan
- ARCH-R4-001 — Product Council task readiness
- ARCH-R4-001 — task delivery checklist
- ARCH-R4-001 — task design specification
- ARCH-R4-001 — task product requirements
- ARCH-R4-001 — task QA plan
- ARCH-R4-001 — task technical plan
- ARCH-R5-001 — Product Council task readiness
- ARCH-R5-001 — task delivery checklist
- ARCH-R5-001 — task design specification
- ARCH-R5-001 — task product requirements
- ARCH-R5-001 — task QA plan
- ARCH-R5-001 — task technical plan
- ARCH-R6-001 — Product Council task readiness
- ARCH-R6-001 — task delivery checklist
- ARCH-R6-001 — task design specification
- ARCH-R6-001 — task product requirements
- ARCH-R6-001 — task QA plan
- ARCH-R6-001 — task technical plan
- ARCH-R7-001 — Product Council task readiness
- ARCH-R7-001 — task delivery checklist
- ARCH-R7-001 — task design specification
- ARCH-R7-001 — task product requirements
- ARCH-R7-001 — task QA plan
- ARCH-R7-001 — task technical plan
- ARCH-R8-001 — Product Council task readiness
- ARCH-R8-001 — task delivery checklist
- ARCH-R8-001 — task design specification
- ARCH-R8-001 — task product requirements
- ARCH-R8-001 — task QA plan
- ARCH-R8-001 — task technical plan
- ARCH-R10-001 — Product Council task readiness
- ARCH-R10-001 — task delivery checklist
- ARCH-R10-001 — task design specification
- ARCH-R10-001 — task product requirements
- ARCH-R10-001 — task QA plan
- ARCH-R10-001 — task technical plan
- AUD-001 — Product Council task readiness
- AUD-001 — task delivery checklist
- AUD-001 — task design specification
- AUD-001 — task product requirements
- AUD-001 — task QA plan
- AUD-001 — task technical plan
- ENG-R0-001 — Product Council task readiness
- ENG-R0-001 — task delivery checklist
- ENG-R0-001 — task design specification
- ENG-R0-001 — task product requirements
- ENG-R0-001 — task QA plan
- ENG-R0-001 — task technical plan
- ENG-R1-001 — Product Council task readiness
- ENG-R1-001 — task delivery checklist
- ENG-R1-001 — task design specification
- ENG-R1-001 — task product requirements
- ENG-R1-001 — task QA plan
- ENG-R1-001 — task technical plan
- ENG-R2-001 — Product Council task readiness
- ENG-R2-001 — task delivery checklist
- ENG-R2-001 — task design specification
- ENG-R2-001 — task product requirements
- ENG-R2-001 — task QA plan
- ENG-R2-001 — task technical plan
- ENG-R2-002 — Product Council task readiness
- ENG-R2-002 — task delivery checklist
- ENG-R2-002 — task design specification
- ENG-R2-002 — task product requirements
- ENG-R2-002 — task QA plan
- ENG-R2-002 — task technical plan
- ENG-R3-001 — Product Council task readiness
- ENG-R3-001 — task delivery checklist
- ENG-R3-001 — task design specification
- ENG-R3-001 — task product requirements
- ENG-R3-001 — task QA plan
- ENG-R3-001 — task technical plan
- ENG-R4-001 — Product Council task readiness
- ENG-R4-001 — task delivery checklist
- ENG-R4-001 — task design specification
- ENG-R4-001 — task product requirements
- ENG-R4-001 — task QA plan
- ENG-R4-001 — task technical plan
- ENG-R4-002 — Product Council task readiness
- ENG-R4-002 — task delivery checklist
- ENG-R4-002 — task design specification
- ENG-R4-002 — task product requirements
- ENG-R4-002 — task QA plan
- ENG-R4-002 — task technical plan
- ENG-R5-001 — Product Council task readiness
- ENG-R5-001 — task delivery checklist
- ENG-R5-001 — task design specification
- ENG-R5-001 — task product requirements
- ENG-R5-001 — task QA plan
- ENG-R5-001 — task technical plan
- ENG-R6-001 — Product Council task readiness
- ENG-R6-001 — task delivery checklist
- ENG-R6-001 — task design specification
- ENG-R6-001 — task product requirements
- ENG-R6-001 — task QA plan
- ENG-R6-001 — task technical plan
- ENG-R7-001 — Product Council task readiness
- ENG-R7-001 — task delivery checklist
- ENG-R7-001 — task design specification
- ENG-R7-001 — task product requirements
- ENG-R7-001 — task QA plan
- ENG-R7-001 — task technical plan
- EVAL-R6-001 — Product Council task readiness
- EVAL-R6-001 — task delivery checklist
- EVAL-R6-001 — task design specification
- EVAL-R6-001 — task product requirements
- EVAL-R6-001 — task QA plan
- EVAL-R6-001 — task technical plan
- EVAL-R7-001 — Product Council task readiness
- EVAL-R7-001 — task delivery checklist
- EVAL-R7-001 — task design specification
- EVAL-R7-001 — task product requirements
- EVAL-R7-001 — task QA plan
- EVAL-R7-001 — task technical plan
- PC-001 — readiness-control hardening Council record
- PC-001 — readiness-control hardening delivery plan
- PC-001 — readiness-control evidence design specification
- PC-001 — readiness-control hardening product requirements
- PC-001 — readiness-control hardening QA plan
- PC-001 — readiness-control hardening technical plan
- PID-R10-001 — Product Council task readiness
- PID-R10-001 — task delivery checklist
- PID-R10-001 — task design specification
- PID-R10-001 — task product requirements
- PID-R10-001 — task QA plan
- PID-R10-001 — task technical plan
- PRD-R0-001 — Product Council task readiness
- PRD-R0-001 — task delivery checklist
- PRD-R0-001 — task design specification
- PRD-R0-001 — task product requirements
- PRD-R0-001 — task QA plan
- PRD-R0-001 — task technical plan
- PRD-R1-001 — Product Council task readiness
- PRD-R1-001 — task delivery checklist
- PRD-R1-001 — task design specification
- PRD-R1-001 — task product requirements
- PRD-R1-001 — task QA plan
- PRD-R1-001 — task technical plan
- PRD-R2-001 — Product Council task readiness
- PRD-R2-001 — task delivery checklist
- PRD-R2-001 — task design specification
- PRD-R2-001 — task product requirements
- PRD-R2-001 — task QA plan
- PRD-R2-001 — task technical plan
- PRD-R3-001 — Product Council task readiness
- PRD-R3-001 — task delivery checklist
- PRD-R3-001 — task design specification
- PRD-R3-001 — task product requirements
- PRD-R3-001 — task QA plan
- PRD-R3-001 — task technical plan
- PRD-R4-001 — Product Council task readiness
- PRD-R4-001 — task delivery checklist
- PRD-R4-001 — task design specification
- PRD-R4-001 — task product requirements
- PRD-R4-001 — task QA plan
- PRD-R4-001 — task technical plan
- PRD-R5-001 — Product Council task readiness
- PRD-R5-001 — task delivery checklist
- PRD-R5-001 — task design specification
- PRD-R5-001 — task product requirements
- PRD-R5-001 — task QA plan
- PRD-R5-001 — task technical plan
- PRD-R6-001 — Product Council task readiness
- PRD-R6-001 — task delivery checklist
- PRD-R6-001 — task design specification
- PRD-R6-001 — task product requirements
- PRD-R6-001 — task QA plan
- PRD-R6-001 — task technical plan
- PRD-R7-001 — Product Council task readiness
- PRD-R7-001 — task delivery checklist
- PRD-R7-001 — task design specification
- PRD-R7-001 — task product requirements
- PRD-R7-001 — task QA plan
- PRD-R7-001 — task technical plan
- PRD-R8-001 — Product Council task readiness
- PRD-R8-001 — task delivery checklist
- PRD-R8-001 — task design specification
- PRD-R8-001 — task product requirements
- PRD-R8-001 — task QA plan
- PRD-R8-001 — task technical plan
- PRD-R9-001 — Product Council task readiness
- PRD-R9-001 — task delivery checklist
- PRD-R9-001 — task design specification
- PRD-R9-001 — task product requirements
- PRD-R9-001 — task QA plan
- PRD-R9-001 — task technical plan
- QA-R8-001 — Product Council task readiness
- QA-R8-001 — task delivery checklist
- QA-R8-001 — task design specification
- QA-R8-001 — task product requirements
- QA-R8-001 — task QA plan
- QA-R8-001 — task technical plan
- QA-R9-001 — Product Council task readiness
- QA-R9-001 — task delivery checklist
- QA-R9-001 — task design specification
- QA-R9-001 — task product requirements
- QA-R9-001 — task QA plan
- QA-R9-001 — task technical plan
- REL-R0-001 — Product Council task readiness
- REL-R0-001 — task delivery checklist
- REL-R0-001 — task design specification
- REL-R0-001 — task product requirements
- REL-R0-001 — task QA plan
- REL-R0-001 — task technical plan
- REL-R1-001 — Product Council task readiness
- REL-R1-001 — task delivery checklist
- REL-R1-001 — task design specification
- REL-R1-001 — task product requirements
- REL-R1-001 — task QA plan
- REL-R1-001 — task technical plan
- REL-R2-001 — Product Council task readiness
- REL-R2-001 — task delivery checklist
- REL-R2-001 — task design specification
- REL-R2-001 — task product requirements
- REL-R2-001 — task QA plan
- REL-R2-001 — task technical plan
- REL-R3-001 — Product Council task readiness
- REL-R3-001 — task delivery checklist
- REL-R3-001 — task design specification
- REL-R3-001 — task product requirements
- REL-R3-001 — task QA plan
- REL-R3-001 — task technical plan
- REL-R4-001 — Product Council task readiness
- REL-R4-001 — task delivery checklist
- REL-R4-001 — task design specification
- REL-R4-001 — task product requirements
- REL-R4-001 — task QA plan
- REL-R4-001 — task technical plan
- REL-R5-001 — Product Council task readiness
- REL-R5-001 — task delivery checklist
- REL-R5-001 — task design specification
- REL-R5-001 — task product requirements
- REL-R5-001 — task QA plan
- REL-R5-001 — task technical plan
- REL-R6-001 — Product Council task readiness
- REL-R6-001 — task delivery checklist
- REL-R6-001 — task design specification
- REL-R6-001 — task product requirements
- REL-R6-001 — task QA plan
- REL-R6-001 — task technical plan
- REL-R7-001 — Product Council task readiness
- REL-R7-001 — task delivery checklist
- REL-R7-001 — task design specification
- REL-R7-001 — task product requirements
- REL-R7-001 — task QA plan
- REL-R7-001 — task technical plan
- REL-R8-001 — Product Council task readiness
- REL-R8-001 — task delivery checklist
- REL-R8-001 — task design specification
- REL-R8-001 — task product requirements
- REL-R8-001 — task QA plan
- REL-R8-001 — task technical plan
- REL-R9-001 — Product Council task readiness
- REL-R9-001 — task delivery checklist
- REL-R9-001 — task design specification
- REL-R9-001 — task product requirements
- REL-R9-001 — task QA plan
- REL-R9-001 — task technical plan
- REL-R10-001 — Product Council task readiness
- REL-R10-001 — task delivery checklist
- REL-R10-001 — task design specification
- REL-R10-001 — task product requirements
- REL-R10-001 — task QA plan
- REL-R10-001 — task technical plan
- SPK-R0-001 — Product Council task readiness
- SPK-R0-001 — task delivery checklist
- SPK-R0-001 — task design specification
- SPK-R0-001 — task product requirements
- SPK-R0-001 — task QA plan
- SPK-R0-001 — task technical plan
- SPK-R5-001 — Product Council task readiness
- SPK-R5-001 — task delivery checklist
- SPK-R5-001 — task design specification
- SPK-R5-001 — task product requirements
- SPK-R5-001 — task QA plan
- SPK-R5-001 — task technical plan
- UX-R0-001 — Product Council task readiness
- UX-R0-001 — task delivery checklist
- UX-R0-001 — task design specification
- UX-R0-001 — task product requirements
- UX-R0-001 — task QA plan
- UX-R0-001 — task technical plan
- UX-R1-001 — Product Council task readiness
- UX-R1-001 — task delivery checklist
- UX-R1-001 — task design specification
- UX-R1-001 — task product requirements
- UX-R1-001 — task QA plan
- UX-R1-001 — task technical plan
- UX-R2-001 — Product Council task readiness
- UX-R2-001 — task delivery checklist
- UX-R2-001 — task design specification
- UX-R2-001 — task product requirements
- UX-R2-001 — task QA plan
- UX-R2-001 — task technical plan
- UX-R3-001 — Product Council task readiness
- UX-R3-001 — task delivery checklist
- UX-R3-001 — task design specification
- UX-R3-001 — task product requirements
- UX-R3-001 — task QA plan
- UX-R3-001 — task technical plan
- UX-R4-001 — Product Council task readiness
- UX-R4-001 — task delivery checklist
- UX-R4-001 — task design specification
- UX-R4-001 — task product requirements
- UX-R4-001 — task QA plan
- UX-R4-001 — task technical plan
- UX-R5-001 — Product Council task readiness
- UX-R5-001 — task delivery checklist
- UX-R5-001 — task design specification
- UX-R5-001 — task product requirements
- UX-R5-001 — task QA plan
- UX-R5-001 — task technical plan
- UX-R6-001 — Product Council task readiness
- UX-R6-001 — task delivery checklist
- UX-R6-001 — task design specification
- UX-R6-001 — task product requirements
- UX-R6-001 — task QA plan
- UX-R6-001 — task technical plan
- UX-R7-001 — Product Council task readiness
- UX-R7-001 — task delivery checklist
- UX-R7-001 — task design specification
- UX-R7-001 — task product requirements
- UX-R7-001 — task QA plan
- UX-R7-001 — task technical plan
- Life in Days — document index
- Life in Days
- Life in Days - Running Log
- Publication provenance
- Pull-Request-Template
- Life in Days
- Security and privacy reporting