-
Notifications
You must be signed in to change notification settings - Fork 0
Docs Project AI Agent Resource Index 2026 08 14 15 10 39 Ist
Canonical source:
docs/project/AI-AGENT-RESOURCE-INDEX-2026-08-14-15-10-39-IST.md· Snapshot commit:6b8b70b72148
Generated: 2026-08-14 15:10:39 IST (UTC+05:30)
Filename timestamp: 2026-08-14-15-10-39-IST
Source snapshot: 8affbc19d165821cdc8bb5c175f848a485565454
Purpose: give a newly started AI agent one safe, comprehensive entry point for understanding the product, authority model, requirements, design, architecture, delivery plan, prototype evidence, GitHub control surfaces, tooling, and every tracked repository resource.
Important
This is an orientation and navigation artifact, not a new product decision. Direct Product Owner instructions and the authority order below supersede summaries in this file. Live GitHub state can change after the timestamp; re-query it before making a status-sensitive decision.
| Question | Answer |
|---|---|
| What is this? | A proposed private, single-user visual memory archive for VoiceNotes text, Telegram photos, and manual text uploads, organized into calendar-based Journal Days. |
| What exists? | Product, UX, architecture, release, research, governance, traceability, roadmap, workbook, Wiki, and fictional static-prototype artifacts. |
| What does not exist? | No working application, deployed service, live integration, durable persistence, verified authentication, backup/recovery system, or production acceptance. |
| Canonical delivery source | Phase 1 Roadmap Manifest |
| Governing product contract | Product Requirements Document |
| Governing UX contract | UX Specification |
| Current Phase 1 decision authority | Phase 1 Council Decision Record |
| Current technical plan | Phase 1 Implementation Plan |
| Current human delivery view | Phase 1 Release Plan |
| Live control surface | Life Reflection GitHub Project — private; authenticated access required |
| Latest frozen static prototype |
v10 Resilient Application Shell; the Phase 1 council baseline intentionally reviewed v5 |
| Current active work |
SPK-R0-001 Shared-host Coexistence & Rollback Spike is In progress; sanitized live-host proof remains outstanding |
| Repository license | None selected. Public visibility does not grant reuse rights. |
| Measure | Base snapshot | Meaning |
|---|---|---|
| Git-tracked files | 254 | Before adding this index |
| Candidate files including this index | 255 | 90 Markdown plus 165 non-Markdown resources |
| Markdown sources | 89 base / 90 with this index | Canonical source documents mirrored by the generated Wiki |
| Non-Markdown resources | 165 | 117 images, static-prototype code, JSON, workbook, tooling, and repository support files |
| Repository size | Approximately 26.45 MiB | Audited tracked-tree size before this index |
| Requirements | 78 | 71 active and 7 explicitly deferred |
| Release milestones | 12 | P0 and R0–R10 |
| Canonical delivery items | 58 | Repository issues #2–#59 |
| Status | 40 Backlog / 4 Next / 1 In progress / 13 Done | Done is evidence-specific; it is not synonymous with implemented or deployed |
| Prototype roadmap | v6–v35 separate track | Do not merge its PVA statuses with the 58-item Phase 1 delivery roadmap |
- Repository status and evidence boundary: README.md
- Navigation and source precedence: docs/INDEX.md
- Canonical vocabulary: CONTEXT.md
- Governing product requirements: docs/product/PRODUCT-REQUIREMENTS.md
- Governing interaction and accessibility contract: docs/design/UX-SPECIFICATION.md
- Current Phase 1 reconciled decisions: docs/council/PHASE1-COUNCIL-DECISION-RECORD.md
- Frozen council input hashes: docs/council/PHASE1-SOURCE-BASELINE.md
- Applicable release PRD or PID: docs/product/releases/README.md
- Current technical implementation plan: docs/architecture/PHASE1-IMPLEMENTATION-PLAN.md
- Machine-readable delivery truth: docs/project/PHASE1-ROADMAP-MANIFEST.json
- Human-readable delivery plan: docs/project/PHASE1-RELEASE-PLAN.md
- Requirement-by-requirement coverage: docs/project/REQUIREMENTS-TRACEABILITY.md
- Live GitHub synchronization contract: docs/project/PHASE1-GITHUB-PROJECT-SYNC.md
- Contribution, security, and publication guardrails: CONTRIBUTING.md
- Security rules: SECURITY.md
- Public-snapshot boundary: PUBLICATION.md
- Append-only project chronology: RUNNING_LOG.md
For R0/shared-host work, then read the Hetzner spike and runbook. For UI work, then read the prototype completeness tracker and the exact version-specific guide, handoff, council record, and QA record.
| Precedence | Authority | Use |
|---|---|---|
| 1 | Direct Product Owner decisions and corrections | Highest authority. Do not reinterpret or broaden them. |
| 2 | Global PRD | Product behavior, requirement IDs, priorities, acceptance intent, scope, and non-goals. |
| 3 | UX Specification | Interaction, content, responsive, accessibility, and state behavior, subject to the PRD. |
| 4 | Phase 1 Council Decision Record | Current release decomposition and planning reconciliation that does not alter the PRD. |
| 5 | Applicable release PRD/PID, Phase 1 Implementation Plan, and Roadmap Manifest | Discipline-specific delivery, technical, status, date, and traceability authority. |
| 6 | Discovery requirements, domain language, research, and historical G0/G1 artifacts | Provenance and evidence; later confirmed decisions win. |
If two authoritative sources still conflict, stop and record the conflict in the Council Decision Record and affected manifest task. Do not silently choose the easier interpretation.
- Treat planning, prototype representation, implementation, validation, deployment, and production acceptance as different evidence states.
- The 13 Done roadmap items are completed planning or definition artifacts. No engineering, QA, or release-acceptance implementation item is Done.
- Use fictional repository content only. Never add real journals, real photos, identifiers, credentials, private URLs, provider responses, or photo-derived descriptions.
- Real photos, thumbnails, EXIF, Telegram identifiers, and descriptions derived from real photos never enter AI requests.
- The product remains private and single-user. MVP excludes sharing, public links, reminders, AI coaching, and historical VoiceNotes import.
- Journal Dates use fixed Asia/Kolkata time while original source timestamps remain immutable.
- Do not execute host, DNS, Cloudflare, provider, credential, paid-evaluation, deployment, backup, restore, or recovery mutations without explicit authorization.
- V6–v10 prototype artifacts are frozen exact-hash evidence. Start new UI work at v11 unless an explicit decision authorizes invalidating a frozen version.
- RUNNING_LOG.md is append-only.
- Do not expose local absolute paths, temporary task identifiers, GitHub Project node IDs, or credentials in public artifacts.
| Resource | Link | Access and purpose |
|---|---|---|
| Repository | arunpr614/Life-Reflection | Public canonical publication surface |
| Main branch | main | Public; default branch |
| Audited base commit | 8affbc19d165 | Public snapshot used to generate this index |
| Canonical Phase 1 issues | 58 issue query | Public; issues #2–#59 |
| Backlog query | status:backlog | Public; 40 at audit time |
| Next query | status:next | Public; 4 at audit time |
| In-progress query | status:in-progress | Public; 1 at audit time |
| Done query | status:done | Public; 13 evidence-backed planning/definition items at audit time |
| Milestones | P0 and R0–R10 | Public; 12 open milestones |
| Labels | Repository labels | Public; 19 roadmap-managed labels plus defaults/accessibility |
| Pull requests | Pull requests | Public publication history |
| Actions | Prototype syntax workflow | Public; JavaScript parsing only |
| Private Project | Life Reflection Project #1 | Private; owner-authenticated access required |
| Status board | Phase 1 Status | Private board; issue-only filter; grouped by Status |
| Roadmap | Phase 1 Roadmap | Private roadmap; issue-only filter; grouped by Milestone |
| Wiki | Wiki Home | Public generated reading surface; Git sources remain authoritative |
| Wiki documentation index | Documentation Index | Public navigation |
| Wiki page audit | Page Audit | Public one-to-one source mapping and fingerprints |
| Wiki asset catalog | Asset Catalog | Public inventory of non-Markdown resources |
| Security policy | Security policy | Public reporting rules |
| Private vulnerability reporting | Report privately | Requires GitHub authentication |
| Manifest blob | PHASE1-ROADMAP-MANIFEST.json | Human/browser view |
| Manifest raw | Raw manifest | Machine-readable current main |
| Issue map | PHASE1-GITHUB-ISSUES.json | Stable task ID to issue URL/state projection |
| Workbook | Phase 1 Excel plan | Generated seven-sheet review artifact |
The repository and Wiki are public. The GitHub Project and both Project views are private; anonymous requests return 404. At the audited snapshot the Project held 58 canonical issues plus publication pull-request records and zero drafts. Raw item count may grow as new pull requests are auto-added, but both canonical views use is:issue and continue to select the 58 delivery issues.
| Control | Audited state |
|---|---|
| Issues / Projects / Wiki | Enabled |
| Discussions | Disabled |
| Secret scanning | Enabled |
| Secret-scanning push protection | Enabled |
| Private vulnerability reporting | Enabled |
| Dependabot security updates | Disabled |
| Rulesets / main branch protection | None at audit time |
| Homepage / declared license | None |
| Latest audited main workflow | Successful run |
| Group | Labels |
|---|---|
| Scope |
phase1, roadmap
|
| Status |
status:backlog, status:next, status:in-progress, status:done
|
| Priority |
priority:high, priority:medium, priority:low
|
| Type |
type:audit, type:planning, type:spike, type:product-definition, type:design, type:architecture, type:implementation, type:evaluation, type:quality, type:release-acceptance
|
| View | Layout | Filter | Grouping | Expected content |
|---|---|---|---|---|
| Phase 1 Status | Board | repo:arunpr614/Life-Reflection is:issue |
Status columns | Exactly 58 canonical issues |
| Phase 1 Roadmap | Roadmap | repo:arunpr614/Life-Reflection is:issue |
Milestone rows; Start/Target date bars | Exactly 58 canonical issues |
| Field | Canonical meaning |
|---|---|
| Title | Repository issue title prefixed by the stable task ID |
| Status | Backlog, Next, In progress, or Done from the manifest |
| Milestone | P0 or R0–R10 |
| Start date / Target date | Proposed Asia/Kolkata planning window; blank for trigger-gated R10 |
| Priority | High, Medium, or Low |
| PRD / PID | Applicable product contract link |
| Design artifact | Applicable UX/design evidence links |
| Requirement IDs | Exact global PRD requirement identifiers |
| Evidence | Named evidence required to support the task state |
| Owner role | Accountable role, not necessarily a GitHub assignee |
| Task summary | Concise task description |
| Repository issue state | Done items are closed; all other lanes remain open |
Initial-spike draft items PVA-001 through PVA-008 and the template Monthly roadmap, Quarterly roadmap, and Backlog views were explicitly removed. PVA identifiers still appear legitimately in the separate historical prototype-completeness program.
| Milestone | Release | Window | Items | Status mix | PRD/PID | Outcome |
|---|---|---|---|---|---|---|
| P0 | Council Planning Baseline | 2026-08-14 → 2026-08-16 | 2 | 2 Done | PRODUCT-REQUIREMENTS | A source-grounded, reviewable Product Council package and one canonical delivery manifest. |
| R0 | Shared-Host Private Foundation | 2026-08-17 → 2026-08-28 | 6 | 4 Next, 1 In progress, 1 Done | PRD-R0-SHARED-HOST-PRIVATE-FOUNDATION | A synthetic-only private shell can coexist with current services, recover, upgrade, and roll back. |
| R1 | Manual Journal Archive | 2026-08-31 → 2026-09-18 | 5 | 4 Backlog, 1 Done | PRD-R1-MANUAL-JOURNAL-ARCHIVE | First memory-creating release: explicit-date text upload, Calendar, and Journal Day recall. |
| R2 | Telegram Photo Capture | 2026-09-21 → 2026-10-09 | 6 | 5 Backlog, 1 Done | PRD-R2-TELEGRAM-PHOTO-CAPTURE | Authorized durable photo capture with review-safe dating, gallery, cover, duplicates, and privacy-safe derivatives. |
| R3 | Retrieval and Date Integrity | 2026-10-12 → 2026-10-30 | 5 | 4 Backlog, 1 Done | PRD-R3-RETRIEVAL-DATE-INTEGRITY | Cross-month browsing, deterministic search, Needs Date Review, and atomic source redating. |
| R4 | Source History and Lifecycle Safety | 2026-11-02 → 2026-11-20 | 6 | 5 Backlog, 1 Done | PRD-R4-SOURCE-HISTORY-LIFECYCLE | Corrections, upstream conflicts, History, Trash, suppressions, and complete restorable export. |
| R5 | Prospective VoiceNotes Sync | 2026-11-23 → 2026-12-11 | 6 | 5 Backlog, 1 Done | PRD-R5-PROSPECTIVE-VOICENOTES-SYNC | Spike-proven, prospective-only VoiceNotes retrieval and replay-safe reconciliation. |
| R6 | Generated Text Reflection | 2026-12-14 → 2027-01-08 | 6 | 5 Backlog, 1 Done | PRD-R6-GENERATED-TEXT-REFLECTION | Optional evaluated titles, summaries, tags, and Visual Briefs with protection, provenance, and budget enforcement. |
| R7 | Generated Artwork | 2027-01-11 → 2027-01-29 | 6 | 5 Backlog, 1 Done | PRD-R7-GENERATED-ARTWORK | Optional evaluated symbolic artwork with explicit preflight, versions, suppression, and real-photo cover precedence. |
| R8 | Operational Scale and Resilience | 2027-02-01 → 2027-02-19 | 4 | 3 Backlog, 1 Done | PRD-R8-OPERATIONAL-SCALE-RESILIENCE | The integrated archive degrades safely under dependency, capacity, restart, and job failures. |
| R9 | Private Launch Acceptance and Stabilization | 2027-02-22 → 2027-03-12 | 3 | 2 Backlog, 1 Done | PRD-R9-PRIVATE-LAUNCH-ACCEPTANCE | The complete private archive is owner-accepted for routine personal use and stabilized without new scope. |
| R10 | Conditional Object-store Transition | Trigger-gated; intentionally undated | 3 | 2 Backlog, 1 Done | PID-R10-OBJECT-STORE-TRANSITION | Live encrypted media moves only after approved local-capacity watermarks trigger a reversible transition. |
All dates are planning estimates. Release entry/exit evidence—not the calendar alone—controls progression. R10 stays undated until approved storage watermarks trigger a reversible transition.
This table is navigation, not a replacement for issue bodies or the manifest. Exact dependencies, all requirement IDs, acceptance evidence, rollback/restore impact, and Done semantics live in the manifest and corresponding issue.
| Task / purpose | Issue | Status | Milestone | Schedule | Priority | Owner role | Requirements | PRD/PID | Design / architecture |
|---|---|---|---|---|---|---|---|---|---|
AUD-001 v5 Feature AuditClassify every v5 interaction as strong, partial, missing, or outside implementation evidence. |
#2 | Done | P0 | 2026-08-14 → 2026-08-14 | High | Product Manager + UI/UX Designer | Planning/audit scope | PRODUCT-REQUIREMENTS |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
PC-001 Integrated Council Planning PackageReconcile Product, Design, Architecture, and Project Management decisions into one delivery baseline. |
#3 | Done | P0 | 2026-08-14 → 2026-08-16 | High | Project Manager | Planning/audit scope | PRODUCT-REQUIREMENTS |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
SPK-R0-001 Shared-host Coexistence & Rollback SpikeProve namespaced shared-host fit with synthetic data, explicit capacity assumptions, non-regression, restore, and rollback. |
#4 | In progress | R0 | 2026-08-17 → 2026-08-19 | High | Technical Architect | 11 IDs | PRD-R0-SHARED-HOST-PRIVATE-FOUNDATION |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
PRD-R0-001 Private Foundation PRDDefine the synthetic-only private foundation outcome and prohibit authentic memory ingestion before R0 acceptance. |
#5 | Done | R0 | 2026-08-17 → 2026-08-20 | High | Product Manager | 11 IDs | PRD-R0-SHARED-HOST-PRIVATE-FOUNDATION |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
UX-R0-001 First-use/Access/Health StatesDesign first use, access denial/expiry, System Health, synthetic recovery, failure, and rollback states. |
#6 | Next | R0 | 2026-08-18 → 2026-08-21 | High | UI/UX Designer | 5 IDs | PRD-R0-SHARED-HOST-PRIVATE-FOUNDATION |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
ARCH-R0-001 Private Shell Architecture & Threat BaselineFreeze namespaced processes, loopback ingress, callback isolation, encryption, secrets, logging, backup, and recovery architecture. |
#7 | Next | R0 | 2026-08-17 → 2026-08-21 | High | Technical Architect | 11 IDs | PRD-R0-SHARED-HOST-PRIVATE-FOUNDATION |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
ENG-R0-001 Deploy Synthetic Private ShellBuild and deploy an authenticated synthetic shell with health evidence and no route or data path for real memories. |
#8 | Next | R0 | 2026-08-21 → 2026-08-26 | High | Engineering | 11 IDs | PRD-R0-SHARED-HOST-PRIVATE-FOUNDATION |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
REL-R0-001 Restore/Rollback/Non-regression AcceptanceExecute access, coexistence, encrypted synthetic restore, restart, rollback, and co-resident non-regression gates. |
#9 | Next | R0 | 2026-08-27 → 2026-08-28 | High | Project Manager | 11 IDs | PRD-R0-SHARED-HOST-PRIVATE-FOUNDATION |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
PRD-R1-001 Manual Archive PRDDefine the first memory-creating release with explicit-date text upload and authentic Calendar/Journal Day recall. |
#10 | Done | R1 | 2026-08-31 → 2026-09-02 | High | Product Manager | 11 IDs | PRD-R1-MANUAL-JOURNAL-ARCHIVE |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
UX-R1-001 Calendar/Day/Upload DesignsFinalize Calendar, Journal Day, upload, empty/loading/error, responsive, theme, and accessibility states. |
#11 | Backlog | R1 | 2026-08-31 → 2026-09-04 | High | UI/UX Designer | 8 IDs | PRD-R1-MANUAL-JOURNAL-ARCHIVE |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
ARCH-R1-001 Journal/Source/Encryption SchemaDefine Journal Day, immutable source file, checksum, encryption, index, backup, restore, and migration contracts. |
#12 | Backlog | R1 | 2026-08-31 → 2026-09-04 | High | Technical Architect | 7 IDs | PRD-R1-MANUAL-JOURNAL-ARCHIVE |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
ENG-R1-001 Manual Upload & Reflection CoreImplement durable explicit-date text upload, duplicate override, Calendar, and authentic Journal Day display. |
#13 | Backlog | R1 | 2026-09-03 → 2026-09-15 | High | Engineering | 11 IDs | PRD-R1-MANUAL-JOURNAL-ARCHIVE |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
REL-R1-001 First-memory Restore/Rollback AcceptanceVerify one owner-approved source survives upload, restart, export, backup, restore, and rollback without time/date drift. |
#14 | Backlog | R1 | 2026-09-16 → 2026-09-18 | High | Project Manager | 11 IDs | PRD-R1-MANUAL-JOURNAL-ARCHIVE |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
PRD-R2-001 Telegram Capture PRDDefine authorized media forms, dating/review, durable acknowledgement, gallery, duplicate, caption, and privacy behavior. |
#15 | Done | R2 | 2026-09-21 → 2026-09-23 | High | Product Manager | 15 IDs | PRD-R2-TELEGRAM-PHOTO-CAPTURE |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
UX-R2-001 Telegram/Date Review/Gallery DesignsDesign companion messages, media/date failures, Needs Date Review, gallery, cover, duplicates, and media management. |
#16 | Backlog | R2 | 2026-09-21 → 2026-09-25 | High | UI/UX Designer | 9 IDs | PRD-R2-TELEGRAM-PHOTO-CAPTURE |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
ARCH-R2-001 Media Pipeline & Asset LifecycleDefine callback authorization, bounded staging/decoding, ciphertext/derivative flow, media references, deduplication, and restore. |
#17 | Backlog | R2 | 2026-09-21 → 2026-09-25 | High | Technical Architect | 15 IDs | PRD-R2-TELEGRAM-PHOTO-CAPTURE |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
ENG-R2-001 Telegram Authorization & Durable CaptureImplement secret/sender/chat authorization, media validation, exact dating, review holding, and post-commit acknowledgement. |
#18 | Backlog | R2 | 2026-09-24 → 2026-10-02 | High | Engineering | 10 IDs | PRD-R2-TELEGRAM-PHOTO-CAPTURE |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
ENG-R2-002 Gallery/Cover/Dedup/DerivativesImplement durable gallery order, real-photo cover, global checksum references, captions, byte-preserved Originals, and local metadata-free thumbnails. |
#19 | Backlog | R2 | 2026-09-28 → 2026-10-06 | High | Engineering | 7 IDs | PRD-R2-TELEGRAM-PHOTO-CAPTURE |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
REL-R2-001 Media Privacy/Restore AcceptanceExecute capture, invalid input/date, album, duplicate, cover, Original, AI-exclusion, media restore, and rollback fixtures. |
#20 | Backlog | R2 | 2026-10-07 → 2026-10-09 | High | Project Manager | 15 IDs | PRD-R2-TELEGRAM-PHOTO-CAPTURE |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
PRD-R3-001 Retrieval & Date Integrity PRDDefine cross-month Timeline, exact retrieval, query privacy, Date Review, and atomic redating invariants. |
#21 | Done | R3 | 2026-10-12 → 2026-10-14 | High | Product Manager | 6 IDs | PRD-R3-RETRIEVAL-DATE-INTEGRITY |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
UX-R3-001 Timeline/Search/Date Review DesignsDesign Timeline, search scope/results/history, Date Review, redating preview, interruption, and failure states. |
#22 | Backlog | R3 | 2026-10-12 → 2026-10-16 | High | UI/UX Designer | 4 IDs | PRD-R3-RETRIEVAL-DATE-INTEGRITY |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
ARCH-R3-001 Search Index & Redating TransactionDefine encrypted lexical indexes, query/log privacy, date-review storage, and one-transaction old/new-day redating. |
#23 | Backlog | R3 | 2026-10-12 → 2026-10-16 | High | Technical Architect | 6 IDs | PRD-R3-RETRIEVAL-DATE-INTEGRITY |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
ENG-R3-001 Timeline/Search/Date Review/RedatingImplement cross-month browsing, deterministic lexical/date/tag/caption retrieval, review resolution, and atomic redating. |
#24 | Backlog | R3 | 2026-10-15 → 2026-10-28 | High | Engineering | 6 IDs | PRD-R3-RETRIEVAL-DATE-INTEGRITY |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
REL-R3-001 Query Privacy & Date Atomicity AcceptanceVerify exact results, opt-in history, zero query leakage, two-day atomicity, index recovery, restore, and rollback. |
#25 | Backlog | R3 | 2026-10-29 → 2026-10-30 | High | Project Manager | 6 IDs | PRD-R3-RETRIEVAL-DATE-INTEGRITY |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
PRD-R4-001 Lifecycle PRDDefine Corrections, conflict choices, source binding, History, Trash, suppressions, confirmations, and complete export. |
#26 | Done | R4 | 2026-11-02 → 2026-11-04 | High | Product Manager | 9 IDs | PRD-R4-SOURCE-HISTORY-LIFECYCLE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
UX-R4-001 Diff/History/Trash/Export DesignsDesign accessible diff, Correction, History, Trash, suppression, confirmation, and encrypted-export workflows. |
#27 | Backlog | R4 | 2026-11-02 → 2026-11-06 | High | UI/UX Designer | 7 IDs | PRD-R4-SOURCE-HISTORY-LIFECYCLE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
ARCH-R4-001 Revision/Suppression/Export LifecycleDefine immutable revisions/Corrections, active display binding, Trash/suppression state machine, passphrase handoff, export cleanup, and restore. |
#28 | Backlog | R4 | 2026-11-02 → 2026-11-06 | High | Technical Architect | 9 IDs | PRD-R4-SOURCE-HISTORY-LIFECYCLE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
ENG-R4-001 Corrections/Conflict/HistoryImplement immutable Corrections, retained revisions, exactly three conflict outcomes, exact source-set binding, and inspectable History. |
#29 | Backlog | R4 | 2026-11-05 → 2026-11-13 | High | Engineering | 7 IDs | PRD-R4-SOURCE-HISTORY-LIFECYCLE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
ENG-R4-002 Trash/Suppressions/ExportImplement 30-day Trash, restoration/permanent deletion, suppressions, complete encrypted export, cleanup, and import validation. |
#30 | Backlog | R4 | 2026-11-09 → 2026-11-18 | High | Engineering | 6 IDs | PRD-R4-SOURCE-HISTORY-LIFECYCLE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
REL-R4-001 Lifecycle/Export Restore AcceptanceVerify conflict outcomes, deletion/restoration, day visibility, suppression, export completeness, import/restore, and rollback. |
#31 | Backlog | R4 | 2026-11-19 → 2026-11-20 | High | Project Manager | 9 IDs | PRD-R4-SOURCE-HISTORY-LIFECYCLE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
SPK-R5-001 VoiceNotes Synthetic Contract SpikeProve exact note/revision identity, unattended authorization, authoritative retrieval, tag/date/transcript, wakeups, reconciliation, and failure behavior using synthetic data. |
#32 | Backlog | R5 | 2026-11-23 → 2026-11-25 | High | Technical Architect | 5 IDs | PRD-R5-PROSPECTIVE-VOICENOTES-SYNC |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
PRD-R5-001 VoiceNotes PRDDefine spike-gated prospective eligibility, activation, dating, reconciliation, revisions, suppression, and lifecycle behavior. |
#33 | Done | R5 | 2026-11-23 → 2026-11-27 | High | Product Manager | 10 IDs | PRD-R5-PROSPECTIVE-VOICENOTES-SYNC |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
UX-R5-001 Integration/Reconciliation/Lifecycle DesignsDesign activation, integration health, Date Review, reconciliation, upstream revision/conflict, suppression, and re-import states. |
#34 | Backlog | R5 | 2026-11-24 → 2026-11-27 | High | UI/UX Designer | 7 IDs | PRD-R5-PROSPECTIVE-VOICENOTES-SYNC |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
ARCH-R5-001 VoiceNotes Adapter & Reconciliation ContractFreeze the spike-proven adapter, opaque identities, authorization renewal, fail-closed paging, durable jobs, reconciliation, and restore design. |
#35 | Backlog | R5 | 2026-11-24 → 2026-11-27 | High | Technical Architect | 10 IDs | PRD-R5-PROSPECTIVE-VOICENOTES-SYNC |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
ENG-R5-001 Prospective Import & RevisionsImplement exact post-activation import, creation-time dating/review, replay-safe reconciliation, revisions, upstream status, suppression, and alerts. |
#36 | Backlog | R5 | 2026-11-26 → 2026-12-09 | High | Engineering | 10 IDs | PRD-R5-PROSPECTIVE-VOICENOTES-SYNC |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
REL-R5-001 Replay/Suppression/Restore AcceptanceVerify activation boundaries, missed/duplicate/out-of-order replay, revisions, suppression/re-import, integration failure isolation, restore, and rollback. |
#37 | Backlog | R5 | 2026-12-10 → 2026-12-11 | High | Project Manager | 10 IDs | PRD-R5-PROSPECTIVE-VOICENOTES-SYNC |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
EVAL-R6-001 Text Model EvaluationEvaluate exact text provider/model snapshots against privacy, fidelity, schema, language, latency, and measured-cost hard gates. |
#38 | Backlog | R6 | 2026-12-14 → 2026-12-18 | Medium | Product Manager + Technical Architect | 6 IDs | PRD-R6-GENERATED-TEXT-REFLECTION |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
PRD-R6-001 Generated Text PRDDefine evaluated optional text derivation, typed inputs, quiet/final refresh, protection, provenance, failures, and budgets. |
#39 | Done | R6 | 2026-12-14 → 2026-12-18 | Medium | Product Manager | 11 IDs | PRD-R6-GENERATED-TEXT-REFLECTION |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
UX-R6-001 Text/Provider/Budget StatesDesign title/summary/tag/brief review, field protection, stale suggestions, provenance, provider health, budget, and failure states. |
#40 | Backlog | R6 | 2026-12-16 → 2026-12-22 | Medium | UI/UX Designer | 7 IDs | PRD-R6-GENERATED-TEXT-REFLECTION |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
ARCH-R6-001 Text Adapter/Jobs/Budget/ProvenanceDefine typed allowlist serialization, exact adapter configuration, source-race-safe jobs, independent protection, provenance, usage ledger, and restore. |
#41 | Backlog | R6 | 2026-12-16 → 2026-12-22 | Medium | Technical Architect | 11 IDs | PRD-R6-GENERATED-TEXT-REFLECTION |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
ENG-R6-001 Text Derivation & Protected FieldsImplement evaluated title/summary/tag/Visual Brief derivation, quiet/final refresh, field protection, version choice, provenance, and budget enforcement. |
#42 | Backlog | R6 | 2026-12-21 → 2027-01-06 | Medium | Engineering | 11 IDs | PRD-R6-GENERATED-TEXT-REFLECTION |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
REL-R6-001 Text Privacy/Quality/Restore AcceptanceVerify hard-gate model quality, photo/caption exclusion, source races, protected fields, failures, monthly ceiling, derived restore, and rollback. |
#43 | Backlog | R6 | 2027-01-07 → 2027-01-08 | Medium | Project Manager | 11 IDs | PRD-R6-GENERATED-TEXT-REFLECTION |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
EVAL-R7-001 Artwork Model EvaluationEvaluate exact artwork provider/model configurations against non-photorealism, safety, quality, latency, cost, and automatic-sweep eligibility gates. |
#44 | Backlog | R7 | 2027-01-11 → 2027-01-13 | Medium | Product Manager + Technical Architect | 6 IDs | PRD-R7-GENERATED-ARTWORK |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
PRD-R7-001 Artwork PRDDefine evaluated Visual Brief, manual/sweep generation, safety/failure, labeling, versions, cover precedence, suppression, and configuration. |
#45 | Done | R7 | 2027-01-11 → 2027-01-13 | Medium | Product Manager | 15 IDs | PRD-R7-GENERATED-ARTWORK |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
UX-R7-001 Artwork/Version/Suppression DesignsDesign preflight, meaningful-word, safety/failure, persistent label, versions, stale, suppression, and real-photo-cover states. |
#46 | Backlog | R7 | 2027-01-12 → 2027-01-15 | Medium | UI/UX Designer | 10 IDs | PRD-R7-GENERATED-ARTWORK |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
ARCH-R7-001 Artwork Adapter/Sweep/Budget/ProvenanceDefine exact adapter/configuration, preflight, idempotent sweep, artifact lifecycle, provenance, budget reservation, suppression, and restore. |
#47 | Backlog | R7 | 2027-01-12 → 2027-01-15 | Medium | Technical Architect | 15 IDs | PRD-R7-GENERATED-ARTWORK |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
ENG-R7-001 Manual & Sweep Artwork LifecycleImplement evaluated explicit/sweep generation, versions, labeling, stale state, suppression, cover precedence, failures, and spend control. |
#48 | Backlog | R7 | 2027-01-14 → 2027-01-27 | Medium | Engineering | 15 IDs | PRD-R7-GENERATED-ARTWORK |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
REL-R7-001 Artwork Privacy/Cover/Restore AcceptanceVerify privacy, evaluation gates, preflight, failures, versions, suppression, real-photo cover, budget, artifact restore, and rollback. |
#49 | Backlog | R7 | 2027-01-28 → 2027-01-29 | Medium | Project Manager | 15 IDs | PRD-R7-GENERATED-ARTWORK |
UX-DESIGN-REVIEW UX-SPECIFICATION index-v5 PHASE1-IMPLEMENTATION-PLAN |
PRD-R8-001 Resilience PRDDefine measured capacity, safe degradation, health, alerts, failure isolation, integrated recovery, and hardening outcomes. |
#50 | Done | R8 | 2027-02-01 → 2027-02-03 | High | Product Manager | 5 IDs | PRD-R8-OPERATIONAL-SCALE-RESILIENCE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
ARCH-R8-001 Capacity/Health/Alert/Fault HardeningHarden measured watermarks, process/job supervision, durable health, alert transitions, dependency isolation, and recovery operations. |
#51 | Backlog | R8 | 2027-02-01 → 2027-02-05 | High | Technical Architect | 5 IDs | PRD-R8-OPERATIONAL-SCALE-RESILIENCE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
QA-R8-001 Integrated Fault/Security/Browser/Accessibility SuiteExecute integrated capacity, restart, dependency, privacy, security, browser, keyboard, screen-reader, zoom, theme, and restore tests. |
#52 | Backlog | R8 | 2027-02-04 → 2027-02-17 | High | Project Manager + QA | 71 IDs | PRD-R8-OPERATIONAL-SCALE-RESILIENCE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
REL-R8-001 Resilience Release AcceptanceAccept the integrated operating envelope only after faults, alerts, capacity, backup/restore, rollback, and regressions pass. |
#53 | Backlog | R8 | 2027-02-18 → 2027-02-19 | High | Project Manager | 71 IDs | PRD-R8-OPERATIONAL-SCALE-RESILIENCE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
PRD-R9-001 Launch Acceptance PlanDefine the owner UAT, Recovery Ceremony, severity gate, observation window, explicit authority, go/no-go, and rollback plan with no feature growth. |
#54 | Done | R9 | 2027-02-22 → 2027-02-24 | High | Product Manager | 71 IDs | PRD-R9-PRIVATE-LAUNCH-ACCEPTANCE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
QA-R9-001 Owner UAT/Recovery Ceremony/StabilizationExecute complete owner journeys, full representative recovery, defect stabilization, accessibility, privacy, spend, capacity, and failure scenarios. |
#55 | Backlog | R9 | 2027-02-22 → 2027-03-10 | High | Project Manager + QA | 71 IDs | PRD-R9-PRIVATE-LAUNCH-ACCEPTANCE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
REL-R9-001 Private Launch Go/No-go & ObservationRecord explicit owner authority, severity status, Recovery Ceremony, observation evidence, and go/no-go or rollback decision. |
#56 | Backlog | R9 | 2027-03-11 → 2027-03-12 | High | Project Manager | 71 IDs | PRD-R9-PRIVATE-LAUNCH-ACCEPTANCE |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
PID-R10-001 Object-store Transition PIDDefine the date-free capacity trigger, user-visible states, outcomes, non-goals, cutover, recovery, rollback, and owner acceptance boundary. |
#57 | Done | R10 | Trigger-gated | Medium | Product Manager | 6 IDs | PID-R10-OBJECT-STORE-TRANSITION |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
ARCH-R10-001 Migration/Inventory/Backup/Rollback RunbookDefine complete pagination/inventory, encrypted keys, dual-write/copy, reconciliation, remote backup/restore, reversible pointers, observation, and rollback. |
#58 | Backlog | R10 | Trigger-gated | Medium | Technical Architect | 6 IDs | PID-R10-OBJECT-STORE-TRANSITION |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
REL-R10-001 Conditional Transition AcceptanceAfter an approved trigger, execute and verify reversible object-store transition before retiring any local authoritative copy. |
#59 | Backlog | R10 | Trigger-gated | Medium | Project Manager | 6 IDs | PID-R10-OBJECT-STORE-TRANSITION |
UX-DESIGN-REVIEW UX-SPECIFICATION PHASE1-IMPLEMENTATION-PLAN |
| Area | Primary resource | Use it for |
|---|---|---|
| Project orientation | README.md | Current state, primary links, repository map, privacy and evidence boundary |
| Complete navigation | docs/INDEX.md | Existing canonical document index and reading paths |
| Domain language | CONTEXT.md | Journal Day, Journal Date, Source Item, Daily Photo, Original Timestamp, Correction, Derived Artifact |
| Governing product contract | docs/product/PRODUCT-REQUIREMENTS.md | 78 prioritized requirements, acceptance behavior, risks, data handling, and non-goals |
| Release contracts | docs/product/releases/README.md | R0–R9 PRDs and date-free R10 PID |
| Governing UX contract | docs/design/UX-SPECIFICATION.md | Information architecture, screens, flows, states, responsive behavior, accessibility, content |
| Phase 1 council authority | docs/council/PHASE1-COUNCIL-DECISION-RECORD.md | Reconciled release, UX, architecture, and delivery decisions |
| Council source baseline | docs/council/PHASE1-SOURCE-BASELINE.md | Exact frozen inputs and hashes |
| Product review | docs/council/PRODUCT-MANAGER-REVIEW.md | Release decomposition and requirement assignment |
| UX review | docs/council/UX-DESIGN-REVIEW.md | v5 inspection, design gaps, screenshots, veto gates, and task traceability |
| Project review | docs/council/PROJECT-MANAGER-REVIEW.md | Critical path, lane policy, readiness/done rules, RAID, cadence |
| Current implementation plan | docs/architecture/PHASE1-IMPLEMENTATION-PLAN.md | Domain, persistence, security, integrations, shared-host plan, testing, recovery, rollback |
| Shared-host research | docs/research/HETZNER-SHARED-HOST-DEPLOYMENT-SPIKE.md | Coexistence topology, SQLCipher/SQLite gates, PostgreSQL fallback, live preflight |
| Shared-host runbook | docs/architecture/HETZNER-SHARED-HOST-RUNBOOK.md | Sanitized stop conditions and proposed execution/rollback sequence |
| Roadmap research | docs/research/GITHUB-PROJECTS-ROADMAP-RESEARCH.md | GitHub Project/Roadmap capabilities, APIs, limits, and automation |
| Historical roadmap pilot | docs/spikes/LIFE-IN-DAYS-GITHUB-ROADMAP-DESIGN.md | Superseded reversible eight-item pilot design |
| Canonical task source | docs/project/PHASE1-ROADMAP-MANIFEST.json | 58 task identities, status, dates, links, requirements, evidence |
| Human release plan | docs/project/PHASE1-RELEASE-PLAN.md | Generated milestone/task projection |
| Issue map | docs/project/PHASE1-GITHUB-ISSUES.json | Stable task IDs to live issue URLs and states |
| GitHub sync runbook | docs/project/PHASE1-GITHUB-PROJECT-SYNC.md | Dry-run-first synchronization and recovery contract |
| Traceability | docs/project/REQUIREMENTS-TRACEABILITY.md | Requirement navigation across Product, UX, Architecture, Delivery, and verification |
| Review workbook | outputs/phase1/Life-in-Days-Phase1-Release-Plan.xlsx | Seven-sheet generated release-plan workbook |
| Prototype feature audit | docs/audits/PROTOTYPE-V5-FEATURE-AUDIT.md | v5 coverage classification against all 78 requirements |
| Prototype roadmap | docs/project/PROTOTYPE-COMPLETENESS-TRACKER.md | Separate v6–v35 UI representation track |
| Latest prototype guide | prototypes/calendar-ui/README-v10.md | How to run and interpret v10 |
| Latest prototype handoff | docs/prototypes/CALENDAR-UI-PROTOTYPE-v10.md | v10 feature/evidence boundary |
| Latest prototype council | docs/prototypes/v10/COUNCIL-v10.md | Approved v10 synthetic interaction contract |
| Latest prototype QA | design-qa-v10.md | Exact-hash independent v10 QA evidence |
| Discovery decisions | docs/discovery/REQUIREMENTS.md | Detailed interview decisions and historical frontier |
| Discovery research | docs/discovery/RESEARCH.md | Product/integration research and unknowns |
| Text-model evaluation | docs/discovery/AI-TEXT-MODEL-EVALUATION.md | Synthetic evaluation protocol; no model qualification |
| Artwork-model evaluation | docs/discovery/AI-ARTWORK-MODEL-EVALUATION.md | Synthetic evaluation protocol; no model qualification |
| Media storage evaluation | docs/discovery/MEDIA-STORAGE-EVALUATION.md | Cost/privacy/operations comparison; no provisioning evidence |
| Security | SECURITY.md | Private reporting and sensitive-content rules |
| Contribution rules | CONTRIBUTING.md | Synthetic data, frozen prototypes, status language, validation |
| Publication provenance | PUBLICATION.md | Public snapshot scope and exclusions |
| Running log | RUNNING_LOG.md | Append-only historical chronology |
| Milestone | Release | Product contract | Interpretation |
|---|---|---|---|
| P0 | Council Planning Baseline | docs/product/PRODUCT-REQUIREMENTS.md | Global governing PRD |
| R0 | Shared-Host Private Foundation | docs/product/releases/PRD-R0-SHARED-HOST-PRIVATE-FOUNDATION.md | Release planning draft |
| R1 | Manual Journal Archive | docs/product/releases/PRD-R1-MANUAL-JOURNAL-ARCHIVE.md | Release planning draft |
| R2 | Telegram Photo Capture | docs/product/releases/PRD-R2-TELEGRAM-PHOTO-CAPTURE.md | Release planning draft |
| R3 | Retrieval and Date Integrity | docs/product/releases/PRD-R3-RETRIEVAL-DATE-INTEGRITY.md | Release planning draft |
| R4 | Source History and Lifecycle Safety | docs/product/releases/PRD-R4-SOURCE-HISTORY-LIFECYCLE.md | Release planning draft |
| R5 | Prospective VoiceNotes Sync | docs/product/releases/PRD-R5-PROSPECTIVE-VOICENOTES-SYNC.md | Release planning draft |
| R6 | Generated Text Reflection | docs/product/releases/PRD-R6-GENERATED-TEXT-REFLECTION.md | Release planning draft |
| R7 | Generated Artwork | docs/product/releases/PRD-R7-GENERATED-ARTWORK.md | Release planning draft |
| R8 | Operational Scale and Resilience | docs/product/releases/PRD-R8-OPERATIONAL-SCALE-RESILIENCE.md | Release planning draft |
| R9 | Private Launch Acceptance and Stabilization | docs/product/releases/PRD-R9-PRIVATE-LAUNCH-ACCEPTANCE.md | Release planning draft |
| R10 | Conditional Object-store Transition | docs/product/releases/PID-R10-OBJECT-STORE-TRANSITION.md | Conditional, trigger-gated PID |
| Track | Authority and current interpretation |
|---|---|
| Phase 1 council design baseline | Prototype v5 is the intentionally frozen input inspected by the Phase 1 council. Do not silently substitute v10. |
| Latest frozen prototype | v10 Resilient Application Shell; fictional browser-memory interaction evidence only. |
| Next version | v11 Needs Date Review is the next queued prototype slice. |
| PVA identifier meaning | PVA-001–PVA-008 remain valid historical prototype work-package IDs in documents even though their disposable GitHub Project draft copies were deleted. |
| Frozen artifacts | V6–v10 source, guides, councils, handoffs, screenshots, and QA evidence are exact-hash records. Byte changes invalidate their dispositions. |
| Root route | The prototype server root is historical v1. Use the explicit index-v10.html route for the latest frozen version. |
Prototype parsing commands:
cd prototypes/calendar-ui
npm run check:v10
npm run prototypeThen open http://127.0.0.1:4173/index-v10.html?view=calendar&month=2026-08. These commands do not prove accessibility, security, integration, persistence, deployment, or production readiness.
flowchart LR
G["generate_phase1_roadmap_manifest.mjs"] --> M["PHASE1-ROADMAP-MANIFEST.json"]
G --> R["PHASE1-RELEASE-PLAN.md"]
M --> W["build_phase1_release_plan.mjs"]
W --> X["Phase 1 Excel workbook"]
M --> S["sync_phase1_github.mjs"]
S --> I["Repository issues and milestones"]
S --> P["Private GitHub Project fields and views"]
C["Committed Git tree"] --> B["build-wiki.mjs"]
B --> K["Generated GitHub Wiki snapshot"]
| Tool | Default behavior | Important boundary |
|---|---|---|
| tools/generate_phase1_roadmap_manifest.mjs | Regenerates the canonical manifest and Markdown release plan | Change task identity, dates, releases, and mappings through this source; do not edit only a projection |
| tools/build_phase1_release_plan.mjs | Builds the seven-sheet workbook | Canonical public output is outputs/phase1; ignored task-scoped duplicates are local only |
| tools/sync_phase1_github.mjs | Dry-run by default | Apply/project-only/issues-only modes may update only existing bodies/field values and require explicit authority plus exact-main preflight |
| tools/build-wiki.mjs | Builds a full Wiki snapshot into an empty output directory | Does not publish by itself; page content is pinned to a Git commit |
| prototypes/calendar-ui/serve.mjs | Runs a dependency-free local static server | Prototype only; normally port 4173 |
Safe read-only planning preview:
node tools/sync_phase1_github.mjsDo not add --apply, --project-only, or --issues-only unless the requested GitHub mutation is explicitly authorized and a fresh exact-main preflight passes. State, status, metadata, definition, and view mutation flags are intentionally unsupported.
| Resource or condition | Caution |
|---|---|
| docs/project/PROJECT-TRACKER.md | Historical 211-task G0/G1 inventory. Do not use it as the live 58-item Phase 1 status source. |
| docs/project/PROTOTYPE-COMPLETENESS-TRACKER.md | Separate UI representation program, not the implementation roadmap. |
| docs/discovery/SHARED-UNDERSTANDING.md | Historical discovery artifact with old G1 language; current Phase 1 authority is later. |
| docs/discovery/WORKTREE.md | Historical provenance; do not assume its branch/path reflects the current worktree. |
| docs/architecture/IMPLEMENTATION-PLAN.md | Earlier technical baseline; use the Phase 1 Implementation Plan for current work. |
| docs/spikes/LIFE-IN-DAYS-GITHUB-ROADMAP-DESIGN.md | Historical eight-item pilot; the 58-task manifest now governs. |
| tools/build-wiki.mjs | Its generated Home narrative contains historical G1/current-state wording. Use Git-tracked current docs and the Wiki Page Audit for authority. |
| External research and API behavior | Time-sensitive. Refresh against first-party sources before current implementation or spending decisions. |
| GitHub Project raw item count | Can drift when publication PRs auto-add. Canonical issue-only views and manifest count are the delivery invariant. |
| Public repository | No open-source license. Do not infer permission to reuse content. |
| Artifact | SHA-256 |
|---|---|
| docs/project/PHASE1-ROADMAP-MANIFEST.json | 2d4b0e2675d06226601ed3b5c88f079722a86af5a0ef9d517dea724fe284e419 |
| docs/project/PHASE1-GITHUB-ISSUES.json | 1ecde0ccb8d89d5ee4dd46d522a93333e6c0465e80192dfaa274033555546a44 |
| docs/project/PHASE1-RELEASE-PLAN.md | b844e9426bc48910baf5c13905ea79ffa68d88a3e8a6d731ccd25b7c66fa46a7 |
| outputs/phase1/Life-in-Days-Phase1-Release-Plan.xlsx | c3b61a7e7199b9384d10645b5d58981be58700197fcc0d0b88e456315be60382 |
These fingerprints identify the audited base snapshot. Any intentional regeneration can change them; validate cross-artifact parity instead of treating an old hash as permanently canonical.
- Resolve the request against direct owner instructions and the authority order.
- Identify the stable requirement IDs and affected release/task IDs before editing.
- Change the true source artifact, not only a generated projection.
- Preserve unrelated working-tree changes and frozen prototype versions.
- Run relevant syntax, link, manifest, workbook, and whitespace checks in proportion to the change.
- Use the GitHub sync tool in dry-run mode first; apply only with explicit mutation authority.
- After an authorized live sync, reconcile all 58 issue bodies, labels, milestones, Project fields, dates, and saved-view filters.
- Regenerate the Wiki from a committed revision and require Page Audit coverage for every Markdown source.
- Append a factual entry to RUNNING_LOG.md when the work changes the project record.
- State exactly what remains unimplemented, untested, undeployed, or unverified.
The base commit contains 254 tracked files. The list below adds this index itself, producing a 255-file publication candidate. Links are repository-relative so they work locally and on GitHub. Generated/ignored task-scoped output directories are intentionally excluded.
Repository root — 17 files
.github/ — 3 files
docs/ — 1 file
docs/architecture/ — 3 files
docs/audits/ — 14 files
- docs/audits/PROTOTYPE-V5-FEATURE-AUDIT.md
- docs/audits/v5-feature-audit/01-calendar-landing.jpg
- docs/audits/v5-feature-audit/02-selected-day.jpg
- docs/audits/v5-feature-audit/03-full-journal-day.jpg
- docs/audits/v5-feature-audit/04-almanac.jpg
- docs/audits/v5-feature-audit/05-search.jpg
- docs/audits/v5-feature-audit/06-settings-overview.jpg
- docs/audits/v5-feature-audit/07-settings-integrations.jpg
- docs/audits/v5-feature-audit/08-settings-ai-privacy.jpg
- docs/audits/v5-feature-audit/09-upload-journal.jpg
- docs/audits/v5-feature-audit/10-manage-reflection.jpg
- docs/audits/v5-feature-audit/11-system-health-placeholder.jpg
- docs/audits/v5-feature-audit/12-source-conflict.jpg
- docs/audits/v5-feature-audit/13-artwork-generation.jpg
docs/council/ — 23 files
- docs/council/agents/PROJECT-MANAGER.md
- docs/council/agents/SENIOR-PRODUCT-MANAGER.md
- docs/council/agents/TECHNICAL-ARCHITECT.md
- docs/council/agents/UI-UX-DESIGN-LEAD.md
- docs/council/COUNCIL-REVIEW.md
- docs/council/PHASE1-COUNCIL-DECISION-RECORD.md
- docs/council/PHASE1-SOURCE-BASELINE.md
- docs/council/PRODUCT-COUNCIL-CHARTER.md
- docs/council/PRODUCT-COUNCIL.md
- docs/council/PRODUCT-MANAGER-REVIEW.md
- docs/council/PROJECT-MANAGER-REVIEW.md
- docs/council/UX-DESIGN-REVIEW.md
- docs/council/ux-review/01-calendar-landing.png
- docs/council/ux-review/02-selected-day.png
- docs/council/ux-review/03-full-journal-day.png
- docs/council/ux-review/04-almanac.png
- docs/council/ux-review/05-search-results.png
- docs/council/ux-review/06-settings-ai-privacy.png
- docs/council/ux-review/07-upload-journal.png
- docs/council/ux-review/08-manage-reflection.png
- docs/council/ux-review/09-compact-calendar.png
- docs/council/ux-review/10-compact-more.png
- docs/council/ux-review/11-source-conflict.png
docs/design/ — 1 file
docs/discovery/ — 8 files
docs/product/ — 13 files
- docs/product/PRODUCT-REQUIREMENTS.md
- docs/product/releases/PID-R10-OBJECT-STORE-TRANSITION.md
- docs/product/releases/PRD-R0-SHARED-HOST-PRIVATE-FOUNDATION.md
- docs/product/releases/PRD-R1-MANUAL-JOURNAL-ARCHIVE.md
- docs/product/releases/PRD-R2-TELEGRAM-PHOTO-CAPTURE.md
- docs/product/releases/PRD-R3-RETRIEVAL-DATE-INTEGRITY.md
- docs/product/releases/PRD-R4-SOURCE-HISTORY-LIFECYCLE.md
- docs/product/releases/PRD-R5-PROSPECTIVE-VOICENOTES-SYNC.md
- docs/product/releases/PRD-R6-GENERATED-TEXT-REFLECTION.md
- docs/product/releases/PRD-R7-GENERATED-ARTWORK.md
- docs/product/releases/PRD-R8-OPERATIONAL-SCALE-RESILIENCE.md
- docs/product/releases/PRD-R9-PRIVATE-LAUNCH-ACCEPTANCE.md
- docs/product/releases/README.md
docs/project/ — 8 files
- docs/project/AI-AGENT-RESOURCE-INDEX-2026-08-14-15-10-39-IST.md
- docs/project/PHASE1-GITHUB-ISSUES.json
- docs/project/PHASE1-GITHUB-PROJECT-SYNC.md
- docs/project/PHASE1-RELEASE-PLAN.md
- docs/project/PHASE1-ROADMAP-MANIFEST.json
- docs/project/PROJECT-TRACKER.md
- docs/project/PROTOTYPE-COMPLETENESS-TRACKER.md
- docs/project/REQUIREMENTS-TRACEABILITY.md
docs/prototypes/ — 102 files
- docs/prototypes/CALENDAR-UI-PROTOTYPE-v2.md
- docs/prototypes/CALENDAR-UI-PROTOTYPE-v3.md
- docs/prototypes/CALENDAR-UI-PROTOTYPE-v4.md
- docs/prototypes/CALENDAR-UI-PROTOTYPE-v5.md
- docs/prototypes/CALENDAR-UI-PROTOTYPE-v6.md
- docs/prototypes/CALENDAR-UI-PROTOTYPE-v7.md
- docs/prototypes/CALENDAR-UI-PROTOTYPE-v8.md
- docs/prototypes/CALENDAR-UI-PROTOTYPE-v9.md
- docs/prototypes/CALENDAR-UI-PROTOTYPE-v10.md
- docs/prototypes/CALENDAR-UI-PROTOTYPE.md
- docs/prototypes/v2/archive-desk-v2.png
- docs/prototypes/v2/living-mosaic-v2.png
- docs/prototypes/v2/manage-reflection-v2.png
- docs/prototypes/v2/margin-companion-v2-design-qa-comparison.png
- docs/prototypes/v2/monthly-almanac-v2.png
- docs/prototypes/v2/option-2-margin-companion-v2-reference.png
- docs/prototypes/v2/reflection-mobile-v2.png
- docs/prototypes/v2/reflection-update-v2.png
- docs/prototypes/v3/artwork-warning-v3.png
- docs/prototypes/v3/generated-artwork-v3.png
- docs/prototypes/v3/living-mosaic-day-v3.png
- docs/prototypes/v3/living-mosaic-landing-v3.png
- docs/prototypes/v3/living-mosaic-mobile-v3.png
- docs/prototypes/v3/manage-reflection-v3.png
- docs/prototypes/v3/monthly-almanac-collapsed-v3.png
- docs/prototypes/v3/monthly-almanac-expanded-v3.png
- docs/prototypes/v3/monthly-almanac-mobile-drawer-v3.png
- docs/prototypes/v3/monthly-almanac-mobile-v3.png
- docs/prototypes/v3/reflection-update-v3.png
- docs/prototypes/v3/search-results-v3.png
- docs/prototypes/v3/unified-calendar-almanac-v3-design-qa-comparison.png
- docs/prototypes/v3/upload-journal-v3.png
- docs/prototypes/v4/living-mosaic-detail-mobile-v4.png
- docs/prototypes/v4/living-mosaic-detail-tablet-v4.png
- docs/prototypes/v4/living-mosaic-landing-v4-design-qa-comparison.png
- docs/prototypes/v4/living-mosaic-landing-v4.png
- docs/prototypes/v4/living-mosaic-museum-margin-v4-design-qa-comparison.png
- docs/prototypes/v4/living-mosaic-museum-margin-v4.png
- docs/prototypes/v5/journal-day-privacy-note-v5.png
- docs/prototypes/v5/privacy-density-comparison-v5.png
- docs/prototypes/v5/privacy-reference-v4-normalized.png
- docs/prototypes/v5/privacy-result-v5-normalized.png
- docs/prototypes/v5/settings-ai-privacy-v5.png
- docs/prototypes/v5/settings-appearance-mobile-v5.png
- docs/prototypes/v5/settings-integrations-v5.png
- docs/prototypes/v5/settings-more-mobile-v5.png
- docs/prototypes/v5/settings-overview-v5.png
- docs/prototypes/v6/COUNCIL-v6.md
- docs/prototypes/v6/search-landing-desktop-full-v6.jpg
- docs/prototypes/v6/search-landing-desktop-v6.jpg
- docs/prototypes/v6/search-landing-mobile-390-full-v6.jpg
- docs/prototypes/v6/search-landing-mobile-390-v6.jpg
- docs/prototypes/v6/search-results-rain-desktop-v6.jpg
- docs/prototypes/v7/calendar-empty-month-dark-320-v7.png
- docs/prototypes/v7/calendar-landing-dark-390-v7.png
- docs/prototypes/v7/calendar-landing-light-1280-v7.png
- docs/prototypes/v7/calendar-selected-artwork-dark-1280-v7.png
- docs/prototypes/v7/calendar-selected-drawer-dark-960-v7.png
- docs/prototypes/v7/calendar-selected-today-dark-1280-v7.png
- docs/prototypes/v7/COUNCIL-v7.md
- docs/prototypes/v7/month-chooser-dark-320-v7.png
- docs/prototypes/v7/month-chooser-dark-1280-v7.png
- docs/prototypes/v8/01-almanac-landing-dark-v8.png
- docs/prototypes/v8/01-almanac-landing-light-v8.png
- docs/prototypes/v8/02-almanac-cross-month-dark-v8.png
- docs/prototypes/v8/02-almanac-cross-month-light-current-v8.png
- docs/prototypes/v8/03-almanac-jump-dark-v8.png
- docs/prototypes/v8/04-almanac-mobile-dark-v8.png
- docs/prototypes/v8/05-almanac-mobile-index-dark-v8.png
- docs/prototypes/v8/06-almanac-cross-month-light-v8.png
- docs/prototypes/v8/07-almanac-full-day-light-v8.png
- docs/prototypes/v8/COUNCIL-v8.md
- docs/prototypes/v9/01-first-use-desktop-light-v9.jpg
- docs/prototypes/v9/02-first-use-desktop-dark-v9.jpg
- docs/prototypes/v9/03-configured-unverified-v9.jpg
- docs/prototypes/v9/04-ai-unavailable-v9.jpg
- docs/prototypes/v9/05-backup-requirements-v9.jpg
- docs/prototypes/v9/06-recovery-ceremony-v9.jpg
- docs/prototypes/v9/07-first-use-960-v9.jpg
- docs/prototypes/v9/08-first-use-390-v9.jpg
- docs/prototypes/v9/09-first-use-320-v9.jpg
- docs/prototypes/v9/10-readiness-320-v9.jpg
- docs/prototypes/v9/11-populated-regression-v9.jpg
- docs/prototypes/v9/COUNCIL-v9.md
- docs/prototypes/v10/01-1440x900-populated-calendar-connection-light.png
- docs/prototypes/v10/02-1440x900-populated-calendar-connection-dark.png
- docs/prototypes/v10/03-1280x720-total-loading-skeleton-light.png
- docs/prototypes/v10/04-1280x720-total-loading-skeleton-dark.png
- docs/prototypes/v10/05-960x900-month-error-august-settled.png
- docs/prototypes/v10/06-700x900-settled-content-server-failure.png
- docs/prototypes/v10/07-390x844-session-ended-gate.png
- docs/prototypes/v10/08-390x844-reauth-boundary.png
- docs/prototypes/v10/08b-390x844-post-return-first-use-calendar.png
- docs/prototypes/v10/09-320x568-connection-unsaved-correction.png
- docs/prototypes/v10/09b-320x568-unsaved-correction-editor-top.png
- docs/prototypes/v10/10-320x568-unsaved-correction-leave-confirm.png
- docs/prototypes/v10/11-320x568-media-failure-museum-margin.png
- docs/prototypes/v10/12-568x320-correction-save-failure.png
- docs/prototypes/v10/13-700x900-media-retry-pending.png
- docs/prototypes/v10/14-700x900-media-retry-success.png
- docs/prototypes/v10/15-700x900-media-retry-failure.png
- docs/prototypes/v10/COUNCIL-v10.md
docs/research/ — 2 files
docs/spikes/ — 1 file
outputs/ — 1 file
prototypes/calendar-ui/ — 54 files
- prototypes/calendar-ui/app-v2.js
- prototypes/calendar-ui/app-v3.js
- prototypes/calendar-ui/app-v4.js
- prototypes/calendar-ui/app-v5.js
- prototypes/calendar-ui/app-v6.js
- prototypes/calendar-ui/app-v7.js
- prototypes/calendar-ui/app-v8.js
- prototypes/calendar-ui/app-v9.js
- prototypes/calendar-ui/app-v10.js
- prototypes/calendar-ui/app.js
- prototypes/calendar-ui/assets/art-golden-path.svg
- prototypes/calendar-ui/assets/art-night-bloom.svg
- prototypes/calendar-ui/assets/art-rain-ribbons.svg
- prototypes/calendar-ui/assets/photo-balcony-cups.svg
- prototypes/calendar-ui/assets/photo-market-flowers.svg
- prototypes/calendar-ui/assets/photo-rain-window.svg
- prototypes/calendar-ui/index-v2.html
- prototypes/calendar-ui/index-v3.html
- prototypes/calendar-ui/index-v4.html
- prototypes/calendar-ui/index-v5.html
- prototypes/calendar-ui/index-v6.html
- prototypes/calendar-ui/index-v7.html
- prototypes/calendar-ui/index-v8.html
- prototypes/calendar-ui/index-v9.html
- prototypes/calendar-ui/index-v10.html
- prototypes/calendar-ui/index.html
- prototypes/calendar-ui/package.json
- prototypes/calendar-ui/README-v2.md
- prototypes/calendar-ui/README-v3.md
- prototypes/calendar-ui/README-v4.md
- prototypes/calendar-ui/README-v5.md
- prototypes/calendar-ui/README-v6.md
- prototypes/calendar-ui/README-v7.md
- prototypes/calendar-ui/README-v8.md
- prototypes/calendar-ui/README-v9.md
- prototypes/calendar-ui/README-v10.md
- prototypes/calendar-ui/README.md
- prototypes/calendar-ui/serve.mjs
- prototypes/calendar-ui/styles-v2.css
- prototypes/calendar-ui/styles-v3.css
- prototypes/calendar-ui/styles-v4.css
- prototypes/calendar-ui/styles-v5.css
- prototypes/calendar-ui/styles-v6.css
- prototypes/calendar-ui/styles-v7.css
- prototypes/calendar-ui/styles-v8-almanac.css
- prototypes/calendar-ui/styles-v8.css
- prototypes/calendar-ui/styles-v9-almanac.css
- prototypes/calendar-ui/styles-v9-readiness.css
- prototypes/calendar-ui/styles-v9.css
- prototypes/calendar-ui/styles-v10-almanac.css
- prototypes/calendar-ui/styles-v10-readiness.css
- prototypes/calendar-ui/styles-v10-resilience.css
- prototypes/calendar-ui/styles-v10.css
- prototypes/calendar-ui/styles.css
tools/ — 4 files
This file is a timestamped snapshot. For current state:
- Read the current
mainversions of the manifest, release plan, issue map, and Council Decision Record. - Re-query GitHub Issues, milestones, Project views, and workflow results.
- Consult the Wiki Page Audit for the currently published source commit and mapping count.
- Create a new timestamped index rather than silently rewriting the historical timestamp in this filename.
End of index.
Generated from arunpr614/Life-Reflection@6b8b70b72148 · Canonical content lives in Git · Fictional prototype data only
- Life in Days — Hetzner shared-host runbook
- Life in Days — Phase1 implementation plan
- PID R10 — Conditional Object-Store Transition
- PRD R0 — Shared-Host Private Foundation
- PRD R1 — Manual Journal Archive
- PRD R2 — Telegram Photo Capture
- PRD R3 — Retrieval and Date Integrity
- PRD R4 — Source History and Lifecycle Safety
- PRD R5 — Prospective VoiceNotes Sync
- PRD R6 — Generated Text Reflection
- PRD R7 — Generated Artwork
- PRD R8 — Operational Scale and Resilience
- PRD R9 — Private Launch Acceptance and Stabilization
- Life in Days release documents
- Life in Days Phase 1 — AI agent resource index
- Codex Goal prompt — Phase 1 P0 requirements to private production
- P0 Codex Gold Goal prompt — complete P0 and R0 only
- Phase 1 GitHub Project V2 sync
- Life in Days — Phase 1 Release Plan
- Life in Days — detailed implementation plan
- Life in Days Global PRD
- Life in Days — project tracker
- Life in Days — prototype completeness tracker
- Life in Days — requirements traceability
- Life in Days — UX specification
- Life in Days — AI Artwork Model Evaluation
- Life in Days — AI Text Model Evaluation
- Initial product brief
- Life in Days: Private Media Storage Evaluation
- Requirements under discovery
- Product and integration research
- Project Git provenance
- Life in Days — proposed shared understanding
- Life in Days — Product Council planning-baseline review
- Life in Days Phase 1 — Independent QA Lead charter
- Agent charter — Project Manager
- Agent charter — Senior Product Manager
- Agent charter — Technical Architect
- Agent charter — UI/UX Design Lead
- Life in Days Phase 1 — P0 Owner Action Ledger
- Life in Days Phase 1 — P0 execution context digest
- Life in Days Phase 1 — P0 execution authorization addendum
- Life in Days Phase 1 — P0 execution council charter
- Life in Days Phase 1 — P0 execution decision ledger
- Life in Days Phase 1 — P0 task Definition of Ready
- Life in Days Phase 1 — P0 execution-control review
- P0/R0 Stage 0 control-repair candidate review dossier
- P0/R0 Stage 0 delivery checklist
- P0/R0 Stage 0 rollback and recovery plan
- P0/R0 Stage 0 state contract
- P0/R0 Stage 0 test plan
- PC-001 readiness-control hardening — planning review
- Life in Days — Phase 1 Product Council Decision Record
- Life in Days Phase 1 — source baseline
- Life in Days Phase 1 — Product Council charter
- Life in Days — Product Manager Council Review
- Life in Days — Project Manager Council Review
- Life in Days — Product Council UX Design Review
- Life in Days Product Council
- Life in Days — calendar UI prototype
- Life in Days — calendar UI prototype v2
- Life in Days — unified Calendar and Almanac prototype v3
- Life in Days — Museum Margin Calendar prototype v4
- Life in Days — private Settings and compact privacy prototype v5
- Life in Days — private Search prototype v6
- Life in Days — Calendar contract prototype v7
- Life in Days — Cross-month Almanac prototype v8
- Life in Days — First-use Readiness prototype v9
- Life in Days — Resilient Application Shell prototype v10
- Life in Days calendar UI prototype
- Life in Days calendar UI prototype v2
- Life in Days unified calendar prototype v3
- Life in Days Museum Margin prototype v4
- Life in Days Settings prototype v5
- Life in Days — private Search prototype v6
- Life in Days prototype v7 — Calendar contract completion
- Life in Days prototype v8 — Cross-month Almanac
- Life in Days prototype v9 — First-use Readiness
- Life in Days prototype v10 — Resilient Application Shell
- v6 Product Council contract — Private Search State
- Life in Days prototype v7 — Product Council contract
- Life in Days prototype v8 — Product Council contract
- Life in Days prototype v9 — Product Council contract
- Life in Days prototype v10 — Product Council contract
- Life in Days v2 — design QA
- Life in Days unified prototype v3 — design QA
- Life in Days v4 — design QA
- Life in Days v5 design QA
- Life in Days v5 design QA
- Life in Days v6 — independent design and interaction QA
- Life in Days v7 — independent design and interaction QA
- Life in Days prototype v8 — independent design QA
- Life in Days prototype v9 — independent design QA
- Life in Days prototype v10 — independent design QA
- Life in Days prototype v5 — PRD feature audit
- AI agent operating contract — keep Phase 1 alive
- Contributing to Life in Days
- GitHub Projects Roadmap — current capability research
- Life in Days — Hetzner shared-host deployment spike
- Wayfinder for Life in Days Phase 1 — adoption and GitHub integration report
- Life in Days — GitHub Projects Roadmap design spike
- ARCH-R0-001 — Product Council task readiness
- ARCH-R0-001 — task delivery checklist
- ARCH-R0-001 — task design specification
- ARCH-R0-001 — task product requirements
- ARCH-R0-001 — task QA plan
- ARCH-R0-001 — task technical plan
- ARCH-R1-001 — Product Council task readiness
- ARCH-R1-001 — task delivery checklist
- ARCH-R1-001 — task design specification
- ARCH-R1-001 — task product requirements
- ARCH-R1-001 — task QA plan
- ARCH-R1-001 — task technical plan
- ARCH-R2-001 — Product Council task readiness
- ARCH-R2-001 — task delivery checklist
- ARCH-R2-001 — task design specification
- ARCH-R2-001 — task product requirements
- ARCH-R2-001 — task QA plan
- ARCH-R2-001 — task technical plan
- ARCH-R3-001 — Product Council task readiness
- ARCH-R3-001 — task delivery checklist
- ARCH-R3-001 — task design specification
- ARCH-R3-001 — task product requirements
- ARCH-R3-001 — task QA plan
- ARCH-R3-001 — task technical plan
- ARCH-R4-001 — Product Council task readiness
- ARCH-R4-001 — task delivery checklist
- ARCH-R4-001 — task design specification
- ARCH-R4-001 — task product requirements
- ARCH-R4-001 — task QA plan
- ARCH-R4-001 — task technical plan
- ARCH-R5-001 — Product Council task readiness
- ARCH-R5-001 — task delivery checklist
- ARCH-R5-001 — task design specification
- ARCH-R5-001 — task product requirements
- ARCH-R5-001 — task QA plan
- ARCH-R5-001 — task technical plan
- ARCH-R6-001 — Product Council task readiness
- ARCH-R6-001 — task delivery checklist
- ARCH-R6-001 — task design specification
- ARCH-R6-001 — task product requirements
- ARCH-R6-001 — task QA plan
- ARCH-R6-001 — task technical plan
- ARCH-R7-001 — Product Council task readiness
- ARCH-R7-001 — task delivery checklist
- ARCH-R7-001 — task design specification
- ARCH-R7-001 — task product requirements
- ARCH-R7-001 — task QA plan
- ARCH-R7-001 — task technical plan
- ARCH-R8-001 — Product Council task readiness
- ARCH-R8-001 — task delivery checklist
- ARCH-R8-001 — task design specification
- ARCH-R8-001 — task product requirements
- ARCH-R8-001 — task QA plan
- ARCH-R8-001 — task technical plan
- ARCH-R10-001 — Product Council task readiness
- ARCH-R10-001 — task delivery checklist
- ARCH-R10-001 — task design specification
- ARCH-R10-001 — task product requirements
- ARCH-R10-001 — task QA plan
- ARCH-R10-001 — task technical plan
- AUD-001 — Product Council task readiness
- AUD-001 — task delivery checklist
- AUD-001 — task design specification
- AUD-001 — task product requirements
- AUD-001 — task QA plan
- AUD-001 — task technical plan
- ENG-R0-001 — Product Council task readiness
- ENG-R0-001 — task delivery checklist
- ENG-R0-001 — task design specification
- ENG-R0-001 — task product requirements
- ENG-R0-001 — task QA plan
- ENG-R0-001 — task technical plan
- ENG-R1-001 — Product Council task readiness
- ENG-R1-001 — task delivery checklist
- ENG-R1-001 — task design specification
- ENG-R1-001 — task product requirements
- ENG-R1-001 — task QA plan
- ENG-R1-001 — task technical plan
- ENG-R2-001 — Product Council task readiness
- ENG-R2-001 — task delivery checklist
- ENG-R2-001 — task design specification
- ENG-R2-001 — task product requirements
- ENG-R2-001 — task QA plan
- ENG-R2-001 — task technical plan
- ENG-R2-002 — Product Council task readiness
- ENG-R2-002 — task delivery checklist
- ENG-R2-002 — task design specification
- ENG-R2-002 — task product requirements
- ENG-R2-002 — task QA plan
- ENG-R2-002 — task technical plan
- ENG-R3-001 — Product Council task readiness
- ENG-R3-001 — task delivery checklist
- ENG-R3-001 — task design specification
- ENG-R3-001 — task product requirements
- ENG-R3-001 — task QA plan
- ENG-R3-001 — task technical plan
- ENG-R4-001 — Product Council task readiness
- ENG-R4-001 — task delivery checklist
- ENG-R4-001 — task design specification
- ENG-R4-001 — task product requirements
- ENG-R4-001 — task QA plan
- ENG-R4-001 — task technical plan
- ENG-R4-002 — Product Council task readiness
- ENG-R4-002 — task delivery checklist
- ENG-R4-002 — task design specification
- ENG-R4-002 — task product requirements
- ENG-R4-002 — task QA plan
- ENG-R4-002 — task technical plan
- ENG-R5-001 — Product Council task readiness
- ENG-R5-001 — task delivery checklist
- ENG-R5-001 — task design specification
- ENG-R5-001 — task product requirements
- ENG-R5-001 — task QA plan
- ENG-R5-001 — task technical plan
- ENG-R6-001 — Product Council task readiness
- ENG-R6-001 — task delivery checklist
- ENG-R6-001 — task design specification
- ENG-R6-001 — task product requirements
- ENG-R6-001 — task QA plan
- ENG-R6-001 — task technical plan
- ENG-R7-001 — Product Council task readiness
- ENG-R7-001 — task delivery checklist
- ENG-R7-001 — task design specification
- ENG-R7-001 — task product requirements
- ENG-R7-001 — task QA plan
- ENG-R7-001 — task technical plan
- EVAL-R6-001 — Product Council task readiness
- EVAL-R6-001 — task delivery checklist
- EVAL-R6-001 — task design specification
- EVAL-R6-001 — task product requirements
- EVAL-R6-001 — task QA plan
- EVAL-R6-001 — task technical plan
- EVAL-R7-001 — Product Council task readiness
- EVAL-R7-001 — task delivery checklist
- EVAL-R7-001 — task design specification
- EVAL-R7-001 — task product requirements
- EVAL-R7-001 — task QA plan
- EVAL-R7-001 — task technical plan
- PC-001 — readiness-control hardening Council record
- PC-001 — readiness-control hardening delivery plan
- PC-001 — readiness-control evidence design specification
- PC-001 — readiness-control hardening product requirements
- PC-001 — readiness-control hardening QA plan
- PC-001 — readiness-control hardening technical plan
- PID-R10-001 — Product Council task readiness
- PID-R10-001 — task delivery checklist
- PID-R10-001 — task design specification
- PID-R10-001 — task product requirements
- PID-R10-001 — task QA plan
- PID-R10-001 — task technical plan
- PRD-R0-001 — Product Council task readiness
- PRD-R0-001 — task delivery checklist
- PRD-R0-001 — task design specification
- PRD-R0-001 — task product requirements
- PRD-R0-001 — task QA plan
- PRD-R0-001 — task technical plan
- PRD-R1-001 — Product Council task readiness
- PRD-R1-001 — task delivery checklist
- PRD-R1-001 — task design specification
- PRD-R1-001 — task product requirements
- PRD-R1-001 — task QA plan
- PRD-R1-001 — task technical plan
- PRD-R2-001 — Product Council task readiness
- PRD-R2-001 — task delivery checklist
- PRD-R2-001 — task design specification
- PRD-R2-001 — task product requirements
- PRD-R2-001 — task QA plan
- PRD-R2-001 — task technical plan
- PRD-R3-001 — Product Council task readiness
- PRD-R3-001 — task delivery checklist
- PRD-R3-001 — task design specification
- PRD-R3-001 — task product requirements
- PRD-R3-001 — task QA plan
- PRD-R3-001 — task technical plan
- PRD-R4-001 — Product Council task readiness
- PRD-R4-001 — task delivery checklist
- PRD-R4-001 — task design specification
- PRD-R4-001 — task product requirements
- PRD-R4-001 — task QA plan
- PRD-R4-001 — task technical plan
- PRD-R5-001 — Product Council task readiness
- PRD-R5-001 — task delivery checklist
- PRD-R5-001 — task design specification
- PRD-R5-001 — task product requirements
- PRD-R5-001 — task QA plan
- PRD-R5-001 — task technical plan
- PRD-R6-001 — Product Council task readiness
- PRD-R6-001 — task delivery checklist
- PRD-R6-001 — task design specification
- PRD-R6-001 — task product requirements
- PRD-R6-001 — task QA plan
- PRD-R6-001 — task technical plan
- PRD-R7-001 — Product Council task readiness
- PRD-R7-001 — task delivery checklist
- PRD-R7-001 — task design specification
- PRD-R7-001 — task product requirements
- PRD-R7-001 — task QA plan
- PRD-R7-001 — task technical plan
- PRD-R8-001 — Product Council task readiness
- PRD-R8-001 — task delivery checklist
- PRD-R8-001 — task design specification
- PRD-R8-001 — task product requirements
- PRD-R8-001 — task QA plan
- PRD-R8-001 — task technical plan
- PRD-R9-001 — Product Council task readiness
- PRD-R9-001 — task delivery checklist
- PRD-R9-001 — task design specification
- PRD-R9-001 — task product requirements
- PRD-R9-001 — task QA plan
- PRD-R9-001 — task technical plan
- QA-R8-001 — Product Council task readiness
- QA-R8-001 — task delivery checklist
- QA-R8-001 — task design specification
- QA-R8-001 — task product requirements
- QA-R8-001 — task QA plan
- QA-R8-001 — task technical plan
- QA-R9-001 — Product Council task readiness
- QA-R9-001 — task delivery checklist
- QA-R9-001 — task design specification
- QA-R9-001 — task product requirements
- QA-R9-001 — task QA plan
- QA-R9-001 — task technical plan
- REL-R0-001 — Product Council task readiness
- REL-R0-001 — task delivery checklist
- REL-R0-001 — task design specification
- REL-R0-001 — task product requirements
- REL-R0-001 — task QA plan
- REL-R0-001 — task technical plan
- REL-R1-001 — Product Council task readiness
- REL-R1-001 — task delivery checklist
- REL-R1-001 — task design specification
- REL-R1-001 — task product requirements
- REL-R1-001 — task QA plan
- REL-R1-001 — task technical plan
- REL-R2-001 — Product Council task readiness
- REL-R2-001 — task delivery checklist
- REL-R2-001 — task design specification
- REL-R2-001 — task product requirements
- REL-R2-001 — task QA plan
- REL-R2-001 — task technical plan
- REL-R3-001 — Product Council task readiness
- REL-R3-001 — task delivery checklist
- REL-R3-001 — task design specification
- REL-R3-001 — task product requirements
- REL-R3-001 — task QA plan
- REL-R3-001 — task technical plan
- REL-R4-001 — Product Council task readiness
- REL-R4-001 — task delivery checklist
- REL-R4-001 — task design specification
- REL-R4-001 — task product requirements
- REL-R4-001 — task QA plan
- REL-R4-001 — task technical plan
- REL-R5-001 — Product Council task readiness
- REL-R5-001 — task delivery checklist
- REL-R5-001 — task design specification
- REL-R5-001 — task product requirements
- REL-R5-001 — task QA plan
- REL-R5-001 — task technical plan
- REL-R6-001 — Product Council task readiness
- REL-R6-001 — task delivery checklist
- REL-R6-001 — task design specification
- REL-R6-001 — task product requirements
- REL-R6-001 — task QA plan
- REL-R6-001 — task technical plan
- REL-R7-001 — Product Council task readiness
- REL-R7-001 — task delivery checklist
- REL-R7-001 — task design specification
- REL-R7-001 — task product requirements
- REL-R7-001 — task QA plan
- REL-R7-001 — task technical plan
- REL-R8-001 — Product Council task readiness
- REL-R8-001 — task delivery checklist
- REL-R8-001 — task design specification
- REL-R8-001 — task product requirements
- REL-R8-001 — task QA plan
- REL-R8-001 — task technical plan
- REL-R9-001 — Product Council task readiness
- REL-R9-001 — task delivery checklist
- REL-R9-001 — task design specification
- REL-R9-001 — task product requirements
- REL-R9-001 — task QA plan
- REL-R9-001 — task technical plan
- REL-R10-001 — Product Council task readiness
- REL-R10-001 — task delivery checklist
- REL-R10-001 — task design specification
- REL-R10-001 — task product requirements
- REL-R10-001 — task QA plan
- REL-R10-001 — task technical plan
- SPK-R0-001 — Product Council task readiness
- SPK-R0-001 — task delivery checklist
- SPK-R0-001 — task design specification
- SPK-R0-001 — task product requirements
- SPK-R0-001 — task QA plan
- SPK-R0-001 — task technical plan
- SPK-R5-001 — Product Council task readiness
- SPK-R5-001 — task delivery checklist
- SPK-R5-001 — task design specification
- SPK-R5-001 — task product requirements
- SPK-R5-001 — task QA plan
- SPK-R5-001 — task technical plan
- UX-R0-001 — Product Council task readiness
- UX-R0-001 — task delivery checklist
- UX-R0-001 — task design specification
- UX-R0-001 — task product requirements
- UX-R0-001 — task QA plan
- UX-R0-001 — task technical plan
- UX-R1-001 — Product Council task readiness
- UX-R1-001 — task delivery checklist
- UX-R1-001 — task design specification
- UX-R1-001 — task product requirements
- UX-R1-001 — task QA plan
- UX-R1-001 — task technical plan
- UX-R2-001 — Product Council task readiness
- UX-R2-001 — task delivery checklist
- UX-R2-001 — task design specification
- UX-R2-001 — task product requirements
- UX-R2-001 — task QA plan
- UX-R2-001 — task technical plan
- UX-R3-001 — Product Council task readiness
- UX-R3-001 — task delivery checklist
- UX-R3-001 — task design specification
- UX-R3-001 — task product requirements
- UX-R3-001 — task QA plan
- UX-R3-001 — task technical plan
- UX-R4-001 — Product Council task readiness
- UX-R4-001 — task delivery checklist
- UX-R4-001 — task design specification
- UX-R4-001 — task product requirements
- UX-R4-001 — task QA plan
- UX-R4-001 — task technical plan
- UX-R5-001 — Product Council task readiness
- UX-R5-001 — task delivery checklist
- UX-R5-001 — task design specification
- UX-R5-001 — task product requirements
- UX-R5-001 — task QA plan
- UX-R5-001 — task technical plan
- UX-R6-001 — Product Council task readiness
- UX-R6-001 — task delivery checklist
- UX-R6-001 — task design specification
- UX-R6-001 — task product requirements
- UX-R6-001 — task QA plan
- UX-R6-001 — task technical plan
- UX-R7-001 — Product Council task readiness
- UX-R7-001 — task delivery checklist
- UX-R7-001 — task design specification
- UX-R7-001 — task product requirements
- UX-R7-001 — task QA plan
- UX-R7-001 — task technical plan
- Life in Days — document index
- Life in Days
- Life in Days - Running Log
- Publication provenance
- Pull-Request-Template
- Life in Days
- Security and privacy reporting