Skip to content

Docs Council Execution P0 Phase1 Context Digest

Arun Prakash N edited this page Aug 15, 2026 · 6 revisions

Canonical source: docs/council/execution/P0-PHASE1-CONTEXT-DIGEST.md · Snapshot commit: 0694e7ad548d

Life in Days Phase 1 — P0 execution context digest

  • Observed: 2026-08-14 19:51 IST
  • Purpose: Cold-start evidence digest for the five-role execution council
  • Snapshot status: Historical pre-publication snapshot; for current repository/GitHub/Project/Wiki state use the P0 execution-control review and GitHub Project sync runbook
  • Evidence boundary: Local/public read-only inspection only; no private deployment resource or authentic media was accessed
  • Roadmap attachment: PC-001 execution-control revalidation; no new roadmap task

Confirmed state at observation time

  • The repository contains governing documents, deterministic roadmap/Wiki/workbook tooling, and frozen fictional static prototypes. Direct inventory found no production application tree, database migration set, deployable application container/IaC, production test suite, recovery implementation, or application-risk CI.
  • Frozen v6–v10 evidence is limited to exact static prototype bytes and fictional browser behavior. v11 is queued with every gate unstarted. Frozen evidence remains read-only.
  • Manifest truth is 12 milestones, 58 tasks, and 78 requirements. The active delivery boundary is 55 P0/R0–R9 tasks covering 71 active P0 requirements. R10 contributes three conditional tasks. Seven requirements are deferred: LID-UP-004 and LID-DEF-001006.
  • Current task state is 40 Backlog, 4 Next, 1 In progress, and 13 Done. The 13 Done items are planning artifacts only: two P0 planning tasks, ten R0–R9 PRDs, and the R10 PID. No implementation or release task is Done.
  • The current local control candidate adds six P0-prefixed task-bound artifacts for every canonical task: 348 draft files, 58 Incomplete/Hold dossier records, zero Ready tasks, and zero tasks with executionAllowed=true. These are council inputs, not bulk approval.
  • SPK-R0-001 is In progress because its research/runbook exists, but its live-host, collision, capacity, backup/restore, rollback, and co-resident evidence does not.
  • The public repository has 58 canonical issues: 45 open and 13 closed. The private Project has those 58 issue items plus five pull-request records. Its canonical statuses match 40/4/1/13.
  • Both delivery views use the broad filter repo:arunpr614/Life-Reflection is:issue. Seven enabled Project workflows include auto-add, sub-issue, status, close, and pull-request reactions. Their full rule configurations are not exposed by the reviewed API, so workflow mutation is held.
  • The Wiki is public and generated from Git-tracked sources. The local candidate now derives state from committed inputs, preserves cumulative history and live-only pages, and fails closed on generator-owned removals; publication remains held until deterministic validation and council acceptance pass.

Git and publication provenance

Item Observed state
Branch codex/wayfinder-phase1-adoption-report
Local HEAD b40e0f0307dc82423e67c1f00f0683e1607e43a8
Remote main 2f69111d7fca44d91368b18956cf97ac57255910
Preserved unpublished commits ad0eeb6, aa5583a, b40e0f0
Open pull requests at startup 0
Worktree at startup Clean; three commits ahead of origin/main
Wiki master 0e0b7276a9b0d907bdc0050ad4bbf6f14eab0ecf
Live deployment Unknown — private read authority pending

The public repository, issues, and Wiki may be read and updated under the activated Goal. A private Project may be updated only through the dry-run-first, reversible process. A private host, provider, tunnel/DNS resource, backup repository, or production target may not even be read until a private deployment-authority record covers the exact action.

Product and UX corrections in the local candidate

  1. R4 is corrected to the exact allowed outcomes Keep the Correction, Display newest upstream revision, and Create a new Correction based on both; no auto-merge or fourth substantive result. Fresh council re-review remains required.
  2. System Health is reconciled to durable states unknown, never run, success, delayed, failed, and blocked, with user labels Unknown, Never verified, Healthy, Attention — delayed, Failed, and Blocked. Not configured is a separate prerequisite/configuration state. Fresh council re-review remains required.
  3. Monthly Almanac is the sole user-facing chronological destination, the Calendar/Almanac switcher sits near Search, and Calendar uses no persistent source/AI/attention overlay chip; exact disclosure remains accessible and visible in selected detail. Fresh council re-review remains required.
  4. Historical four-seat/G1 records are provenance. The activated Goal authorizes execution under a five-seat council and delegates routine R0–R8 gates when all evidence passes, while preserving named human-only acts.

Accepted versus conditional architecture

Classification Current position
Accepted design direction Modular TypeScript application; separate web/callback/worker responsibilities; immutable artifact; loopback/private service boundaries; dedicated namespaced Compose project; application-controlled encryption; encrypted media; durable database-backed work; independent Restic recovery; no provider failure may block healthy local source browsing/correction.
Conditional on R0 evidence Existing-host admission; exact resource limits; port/tunnel collision safety; SQLCipher/SQLite with FTS5/WAL/backup/migration/crash behavior; PostgreSQL fallback; Cloudflare human/callback rules; backup target; deployment/rollback; co-resident non-regression.
Forbidden inference No implementation, test, host qualification, deployment, restore, accessibility conformance, or production readiness follows from the plan or prototype.

Owner and credential gates

The public-safe dependency inventory is maintained in P0 Owner Action Ledger. The currently critical input is the private deployment-authority record. Account/MFA work, secrets, material provider/terms/spend decisions, authentic-content consent, authentic-photo UAT, recovery-key custody, human Recovery Ceremony steps, final R9 launch, and irreversible R10 stages remain non-delegable.

Safe parallel work

  • Complete and independently review the P0 execution-control remediation under PC-001.
  • Correct R4 and System Health contract drift.
  • Harden generator evidence ownership, five-signal issue verification, targeted view containment, issue-state preservation, Wiki repeatability, and public-safety checks.
  • Prepare the task-specific R0 Product, UX, Architecture, QA, Delivery, and Council artifacts after the P0 package passes.
  • Only after its own dossier passes, prepare fictional, host-independent UX-R0-001 evidence or synthetic SPK-R0-001 fixtures and commands without connecting to a private target.

ENG-R0-001, REL-R0-001, host-specific architecture freeze, private-system reads, deployment, authentic content, and production claims remain held.

Next executable package

The exact next package is P0 execution-control remediation attached to PC-001. It passes entry conditions because it is local/public, reversible, uses no authentic data, requires no private target, and is directly authorized. After its independent pass, the R0 task-readiness wave comes first. No R0 substantive task begins until its six artifacts and five-seat council decision are approved at an exact reviewed revision.

Life in Days

Home

Product, experience, architecture, and delivery

Discovery and research

Governance and council

Prototype handoffs

Prototype run guides

Prototype councils

QA and audits

Repository and project record

Evidence and maintenance

Clone this wiki locally