Skip to content

Docs Council Execution Releases P0 P0 Execution Control Review

Arun Prakash N edited this page Aug 14, 2026 · 6 revisions

Canonical source: docs/council/execution/releases/P0-P0-EXECUTION-CONTROL-REVIEW.md · Snapshot commit: dbd497b496c0

Life in Days Phase 1 — P0 execution-control review

  • Review date: 2026-08-14
  • Roadmap attachment: PC-001; no new task or issue
  • Candidate state: Five-seat accepted for repository publication through reviewed PR; live GitHub/Project/Wiki synchronization pending
  • Deployment state: Unknown — private read authority pending
  • Authentic media: Not accessed or processed

Outcome under review

Revalidate the completed planning baseline without inflating its meaning, establish the five-seat execution council and direct authorization, install a task-specific Product Council gate for all 58 issues, correct material source drift, and harden the delivery control plane before R0 execution advances.

Readiness-wave findings

Seat Verdict before remediation Principal vetoes
Product Go for P0 governance only; no-go for live R0 Missing execution authority/QA seat; contradictory R4 conflict outcome; no live authority
UX Allow host-independent UX-R0-001 preparation only after P0 Missing R0 state/a11y contract; contradictory Health vocabulary; frozen prototypes are not R0 evidence
Architecture Conditional go for local/public controls and synthetic R0 preparation No host authority; no architecture freeze; SQLCipher, recovery, coexistence and rollback unproved

Acceptance-wave findings

Seat Verdict before remediation Principal vetoes
Independent QA Go for P0 remediation; hold R0 implementation/live entry No QA charter/RACI; R4 drift; evidence prose/status hard-coding; unsafe sync; stale Wiki; no live authority
Project Manager Conditional proceed for local/public governance Source/authority drift; Project containment; control-surface gaps; owner-only dependencies

All five seats independently confirmed:

  • 78 unique requirements, 71 active and seven deferred;
  • 58 tasks, including 55 P0/R0–R9 and three R10;
  • statuses 40 Backlog, 4 Next, 1 In progress, and 13 planning-only Done;
  • no unexpected R10 dates;
  • current code is planning/static prototype, not a working or deployed application; and
  • the live deployment lane is Unknown — private read authority pending.

First acceptance attempt and remediation

The first exact candidate (f48b320e1a5f413e4602b577806cc66ca2bb27c6) received Product and independent-QA Go, an Architecture conditional Go, and a Design Hold; a final Project Manager seat was therefore not treated as acceptance. Design identified four publication blockers: residual R4 conflict-suggestion persistence, stale Timeline/rail/badge guidance, incomplete Health Status Card labels, and a machine gate that did not bind named Design approval, structured coverage, or all five individual seat verdicts.

The second candidate corrects those sources and adopts a non-self-referential approval registry. Every artifact review and seat attestation binds the same stable candidate revision and computed dossier digest; the validator proves that the published revision exists on fetched origin/main and contains the registered artifact bytes before any task can become Ready. Design applicability carries task-bound journey, state, and accessibility scenario coverage, while Architecture/Design not-applicable requires a task-specific rationale and named specialist concurrence. Private/release execution additionally requires a public-safe opaque authority evidence reference. These controls remain unexercised for execution because all 58 dossiers are intentionally draft/Hold.

Fresh acceptance on exact candidate

All five seats and independent QA reviewed exact candidate commit 1391bea9abcc899aefcad446324d7c0a2b0199c2 read-only. Their Go applies only to publishing the P0 control package; it is not a task-level dossier approval.

Seat Final P0 publication verdict Exact disposition
Product Manager Go Requirements, all 58 task Product artifacts, issue projection, R4, Health, Almanac and owner gates are publication-ready; no task implementation authorized
UI/UX Designer Go All four Design vetoes cleared; all Design artifacts remain Draft/Hold and no accessibility/runtime evidence is inferred
Technical Architect Go Approval model, generator, validator, workbook, Wiki and safe publication order are adequate for an all-Hold control package
Independent QA Go CI-equivalent controls, preservation, 598,245-byte dry run, workbook, Wiki, prefix and public-safety checks pass
Project Manager Go 58 issues/items, six artifacts per task, dates/dependencies/statuses, delivery controls, rollback order and tracker parity pass

No owner input is required for public P0 publication or synchronization of the existing 58 delivery issues. P0-OA-001 remains required before any private-system read; P0-OA-002 remains required before a future non-delivery issue or workflow mutation. Later consent, credentials, provider/spend, recovery, UAT, R9 and R10 acts remain due only at their named human gates.

Candidate acceptance checklist

Gate Required evidence Current state
Five-seat governance QA charter, charter/RACI, authorization, decision ledger, Owner Ledger Pass; exact-candidate five-seat publication verdict recorded above
Per-task Definition of Ready Six P0-prefixed task artifacts, central register, issue/Project projection, exact hash/published-revision/dossier-digest checks, named artifact reviews, five seat verdicts, structured Design coverage, council veto Control structure passes; 348 artifacts intentionally remain draft and all 58 task records remain Incomplete/Hold
Source correction R4 exact three outcomes; Health state/label reconciliation Complete; validator pass
Authority truth Historical records preserved; routine R0–R8 delegation and human-only acts explicit Complete in local public-safe records; private lane remains unknown
Manifest integrity 78/71/7 and 58/55/3; valid graph; R10 blank Pass; 40 Backlog / 4 Next / 1 In progress / 13 planning-only Done
QA ownership Independent QA named for R0–R7 release evidence and R8/R9 integrated tasks Complete in charter, RACI, dossiers, and Roadmap projection
GitHub safety Five-signal verification; no issue reopen churn; targeted phase1 view hardening; workflows held if unreadable Local dry-run pass: 598,245-byte parse, 58 complete bodies, six task artifacts, six artifact-review bindings, five seat records, structured Design assurance and 17 fields per task; no live mutation yet
Workbook Seven sheets, all rows/formulas/URLs/R10 blanks/renders/hashes pass when projection changes Pass; 20 rendered regions, zero formula errors, matching SHA-256 bf243b130813c775f6c18519b16146531d8365c4c1d9a03a52ddccc562938d21
Wiki Commit-derived state; repeatable; cumulative history; no silent live-only/owned deletion Pass against live Wiki snapshot: two byte-identical 455-page outputs from 1391bea9abcc899aefcad446324d7c0a2b0199c2; preserved-live-page and expected-refusal controls retained
Public safety Prefix validation, secret/path/private-ID scan, semantic review Pass: all 362 new files use P0 basenames; all 58 exact public issue projections reviewed; protected scan clean
Running log Startup/council/correction append; prior-byte prefix unchanged Pass; latest append preserves the prior 39,566-byte SHA-256 prefix
Independent re-review All affected specialist vetoes cleared or explicitly held outside P0 scope Pass; five seats and independent QA returned P0-publication Go on the exact candidate

Release disposition

Current: Go to publish this P0 control package through the existing feature branch, reviewed PR, successful checks, and merge to main. Live issue/Project/Wiki synchronization remains a distinct staged publication step and cannot be claimed until two quiescent parity checks and Wiki verification pass. Separately, every task remains Hold until its own task dossier passes; package acceptance cannot bulk-approve the 58 draft dossiers. R0 implementation, private-system work, deployment, authentic content, and production claims remain prohibited.

The anticipated next canonical work after a P0 pass is the R0 task-specific readiness wave: Product, UX, Architecture, QA, Delivery, and council review for the exact R0 tasks. Fictional, host-independent UX-R0-001 or safe synthetic SPK-R0-001 work may begin only after the owning task records executionAllowed=true. Neither host-specific architecture nor implementation/release acceptance may pass before executed R0 evidence exists.

Evidence boundary

This local candidate changes documentation, generated task dossiers/register/manifest projections, synchronization controls, and both workbook copies. It does not change live GitHub issues, Project fields/views/workflows, Wiki pages, application code/runtime, infrastructure, private systems, authentic content/media, deployment, or production state.

Life in Days

Home

Product, experience, architecture, and delivery

Discovery and research

Governance and council

Prototype handoffs

Prototype run guides

Prototype councils

QA and audits

Repository and project record

Evidence and maintenance

Clone this wiki locally