Life in Days — Product Council UX Design Review

Review date: 14 August 2026
Council role: UI/UX Design
Artifact status: Design-planning evidence
Product status represented: No implementation, integration, deployment, recovery, or launch claim

Executive verdict

The v5 calendar prototype is a credible interaction-direction artifact for the reflective core: Calendar, Journal Day, manual upload, generated-field management, a source-conflict callout, basic lexical search, settings, themes, and compact reflow. It is not a product implementation. Its records are simulated in memory; durable saves, access control, integrations, jobs, backup, restore, export, operational state, and recovery are not evidenced.

The release plan should therefore preserve v5's calm archival language and source-versus-derived hierarchy, while completing each missing state immediately before the release that needs it. No implementation task may be marked Done because a corresponding v5 screen exists. A planning, definition, design, or audit task may be Done when its named artifact evidence exists, but that status never implies implementation, deployment, recovery, release, or launch completion.

The strongest sequencing recommendation is:

  1. prove the private, recoverable synthetic shell in R0;
  2. deliver durable manual journal value in R1;
  3. add authentic photo capture in R2;
  4. make retrieval and dates trustworthy in R3;
  5. complete history and lifecycle safety in R4;
  6. add prospective VoiceNotes only after its synthetic gate in R5;
  7. add optional generated text and artwork in R6 and R7;
  8. harden measured operations in R8;
  9. complete private-launch acceptance in R9;
  10. leave R10 undated until measured storage evidence triggers it.

Audit sources and evidence boundary

Source Reviewed role SHA-256
Global PRD Product scope, 78 stable LID requirements, acceptance rules, non-goals, risks Reviewed source snapshot: 513a5bc62cdccc0112d8876f6b75915782ce9a4c118f9a8207b1ef588f8edf5c. Linked public-safe Phase1 mirror at review time: 9f8ad449a8e3c8f5387a8deb32b1b51b5d8bd0252fd1e1647137e9b981d0aa35.
UX specification Normative interaction, state, content, responsive, accessibility, and privacy contract 1076228160f253cf8d291c8c5884dfecb7bf8883e82b208f181776cf94c68b8e
v5 prototype shell DOM entry point and explicit throwaway-prototype disclosure ced79f43c0e3b8916f029898a6469a8290aa90e9e45c28be7b612c177d4ca17d
v5 prototype behavior Clickable flows, mock state, navigation, keyboard behavior, and simulated outcomes 3e99414a1c3f6cd71047dee6964a26fb502250e1b0061f153f935c397714383d
v5 prototype presentation Visual hierarchy, themes, focus, responsive behavior, and reduced-motion rules 64858881f2189d0e919da66e8d17687e17e06dcb8c2e5a4325f65420195b6cd1

Method: the sources above were read directly; the v5 prototype was exercised at wide and compact viewports using only synthetic fixture data. Screenshots below are evidence of prototype intent, not of implemented, tested, or deployed behavior. The complementary v5 feature audit, requirements traceability, and implementation plan remain planning inputs.

v5 visual evidence walk

Reflective core

v5 calendar landing with simulated populated days

v5 full Journal Day with authentic and generated regions

The Calendar and Journal Day establish the strongest reusable direction: image-first discovery, quiet empty dates, visibly separate authentic and generated regions, a real-photo cover, provenance language, and non-blocking management actions. This supports LID-REF-001, LID-REF-004, LID-SCP-002, LID-SCP-003, LID-TG-007, and LID-AIA-008, subject to durable and accessible implementation.

Retrieval and privacy explanation

v5 lexical search direction

v5 AI and privacy settings direction

The prototype demonstrates a useful search-results hierarchy and clear no-photo-to-AI language. It does not yet satisfy LID-REF-003 because Photo Captions, exact date and tag controls, Include history, field/source snippets, and query privacy are incomplete. Its current query-string behavior conflicts with UX-NAV-03, UX-SEARCH-05, and UX-PRIV-04.

Capture, management, and conflict intent

v5 manual upload review

v5 generated-field management

v5 source revision conflict direction

These screens are credible flow intent for LID-UP-001, LID-AIT-005, and LID-SRC-002. They do not evidence durable upload, duplicate handling, complete accessible differences, Correction editing, audit events, or persistence of the three conflict outcomes.

Responsive intent

v5 compact Calendar

v5 compact overflow navigation

The compact design preserves the seven-column Calendar and moves secondary actions into a More surface. It is a useful basis for LID-REF-006, UX-RESP-01, and UX-RESP-02, but requires measured target size, 200% text zoom, 400% page zoom, orientation, safe-area, and supported-browser evidence.

Additional evidence: selected day, Almanac, and all review captures.

v5 flow and state inventory

Surface or flow What v5 demonstrates Evidence class Missing before product acceptance Requirement trace
Calendar landing Monday-first image-led month, quiet empty cells, Today, month movement, theme control Strong visual and interaction intent Server-backed current month, loading/empty/error/degraded states, exact URL/privacy behavior, durable cover updates LID-REF-001, LID-SCP-002, UX-CAL-01–11
Selected-day margin Selected date, concise metadata, route into day detail Strong visual intent Exact browser Back restoration, reload/deep-link behavior, empty-day upload behavior UX-NAV-01–03, UX-CAL-08–09
Journal Day Real-photo gallery, generated artwork region, generated reflection, authentic source journals, provenance and actions Strong hierarchy intent Photo Captions, complete provenance/history, durable actions, all pending/failure/stale/Trash states LID-REF-004, LID-SCP-003, UX-DAY-01–22
Almanac Monthly book-like browsing alternate v5-only concept It does not satisfy required Timeline behavior; decide whether to retain after Timeline is complete LID-REF-002, UX-TIME-01–06
Search Basic lexical query over some visible fixture fields and grouped results Partial behavior intent Photo Captions, exact date/tag filters, Include history, highlighted field/source snippets, no query in URL/logs/title LID-REF-003, UX-SEARCH-01–09
Settings Journal/integration, AI/privacy, and appearance categories Partial content and IA intent Readiness, credential health, evaluated-only options, budget states, integration activation/reconciliation, factual health LID-AIT-002, LID-OPS-014, UX-SET-01–11
Manual upload Choose/review/date/duplicate-looking step and simulated success Strong happy-path intent Real validation, duplicate decision, interruption, unsaved close, durable commit, reload, error and rollback LID-UP-001–003, UX-UPLOAD-01–06
Generated-field management Edit/review/accept/protect/resume actions Strong intent for core choices Per-field versions, accessible diff, stale source hash, provider failure, durable save, audit history LID-AIT-003–007, UX-REVIEW-01–05
Source conflict Persistent attention state and the required three choices Partial intent Complete accessible diff, new-Correction workspace, unsaved warning, deterministic persisted outcomes and events LID-SRC-001–002, UX-CONFLICT-01–05
Artwork Manual action, sparse-source explanation, generated region, visible separation from photos Partial intent Provider/budget preflight, Visual Brief history, safety/refusal/error, versions, suppression, stale and sweep states LID-AIA-002–011, UX-ART-01–17
Compact reflow Seven-column Calendar, condensed navigation, modal presentation Useful responsive intent Full core-flow audit at 320 px, zoom, landscape, safe area, touch size, screen reader, all supported browsers LID-REF-006, UX-RESP-01–07, UX-A11Y-01–17
Keyboard and motion Skip link, visible focus styling, calendar key handlers, modal focus trap, reduced-motion CSS Code-level design intent only Manual and automated accessibility evidence across every state; no claim of WCAG conformance yet LID-REF-005–006, UX-A11Y-01–17
Persistence and integrations Prominent disclosure that data is simulated and not persistent Explicitly absent All database, media, access, integration, job, backup, restore, export, observability, and deployment behavior LID-OPS-001–018

UX contract that must survive implementation

  1. The archive is private and single-user. No Share, Publish, Invite, public link, anonymous route, social reaction, profile complexity, coach persona, streak, or reminder may appear. LID-SCP-001, LID-DEF-002, UX-PRIN-04, UX-PRIN-06, UX-NAV-04.
  2. Authentic source truth and generated presentation stay separate. Source type, Original Timestamp, Journal Date, displayed version, revision state, and generated provenance remain distinguishable. LID-SCP-002–003, UX-PRIN-01, UX-GEN-01–03.
  3. A real photo always wins the Calendar Cover. Generated Artwork is cover-eligible only when no live Daily Photo exists and remains visibly labeled as AI artwork everywhere. LID-TG-007, LID-AIA-005, LID-AIA-008, UX-PRIN-02, UX-CAL-04–05.
  4. Dates are trustworthy. Journal Dates use fixed Asia/Kolkata day boundaries and en-IN presentation; Original Timestamps remain immutable; future dates never silently enter the Calendar. LID-SCP-002, UX-GEN-11–14.
  5. Visible success means durable success. Upload, capture, redating, deletion, restore, export, and generated-artifact success appear only after the complete server operation is confirmed. LID-TG-004, UX-GEN-04, UX-GEN-07.
  6. Asynchronous state is named and scoped. Use Waiting, In progress, Complete, Needs attention, Blocked, or Unavailable; keep authentic reading and unrelated navigation available when an optional process fails. LID-OPS-018, UX-GEN-05–06, UX-STATE-01–08.
  7. History is never rewritten for convenience. Corrections, Source Revisions, redating, generated versions, Trash, and suppressions remain auditable and reversible where the product contract permits. LID-SRC-001–004, LID-OPS-009–010, UX-HIST-01–07.
  8. Personal text is never auto-merged. A competing Correction and upstream revision exposes a complete comparison and exactly three substantive outcomes: keep the Correction, display newest upstream revision, or create a new Correction based on both. LID-SRC-002, UX-CONFLICT-01–05.
  9. Search is deterministic and private. It is lexical/date/tag retrieval, not conversational or semantic; queries and personal snippets stay out of URLs, titles, telemetry, referrers, and logs. LID-REF-003, LID-DEF-003, UX-SEARCH-01–09, UX-NAV-03.
  10. AI is optional, explicit, and failure-isolated. Source reading, correction, capture, search, export, backup, and recovery remain useful when providers are absent, blocked, or failed. There is no silent provider fallback. LID-AIT-002, LID-AIT-007, LID-AIA-006, LID-OPS-017–018.
  11. Real photos and photo-derived data never go to AI. Text generation receives only the approved journal-text contract; artwork receives only the minimized read-only Visual Brief. LID-TG-009–010, LID-AIT-006, LID-AIA-002, UX-PRIN-10.
  12. Operational truth is evidence-based. Captured, processed, generated, backed up, restore verified, healthy, and recoverable are distinct facts. No green or reassuring claim may be inferred from a job start or backup upload. LID-OPS-011–014, UX-PRIN-03, UX-HEALTH-02–03.
  13. Blank browser composition remains out of MVP. An empty Calendar cell may only launch the approved file-upload path; it never creates an empty journal editor. LID-UP-004, UX-CAL-09.
  14. Navigation preserves context without leaking content. Browser Back restores month, filters, history state, loaded boundary, and scroll where practical, while page titles and routes remain generic. UX-NAV-01–03.

Accessibility and privacy requirements

Accessibility release gate

  • Meet WCAG 2.2 AA in supported current desktop and mobile browsers; conformance is demonstrated, not inferred from CSS. LID-REF-005–006, UX-A11Y-01–17.
  • Use semantic landmarks, one clear h1, logical headings, a skip link, accessible Calendar grid semantics, and programmatic authentic/generated region labels. UX-A11Y-01–04.
  • Make every action keyboard operable. Pointer drag must have button or menu alternatives. Preserve logical focus through modal, save, pagination, queue resolution, and rerender states. UX-A11Y-05–08.
  • Meet at least 24-by-24 CSS-pixel targets, preferring 44-by-44 for primary compact controls; verify focus and UI boundaries at 3:1, normal text at 4.5:1, and large text at 3:1. UX-A11Y-09–10.
  • Never use color alone for selected, error, conflict, stale, Trash, or AI state. UX-A11Y-11.
  • Keep all core tasks usable at 200% text zoom and 400% page zoom, at 320 CSS pixels, in portrait and landscape, in both themes, and with reduced motion. UX-RESP-01–07, UX-A11Y-12–14.
  • A complete text comparison must remain understandable in document order to a screen-reader user, with additions and removals labeled. UX-A11Y-16.
  • Owner-authored private photo descriptions, when present, remain local/exported metadata and are never generated or sent to AI. LID-REF-006.

Privacy release gate

  • Personal HTML, APIs, media, downloads, search, and export are private and no-store; no design may rely on a browser or offline cache. LID-OPS-008, UX-PRIV-03.
  • Journal text, captions, filenames, photos, provider responses, prompts, credentials, private identifiers, and signed locations stay out of page titles, URLs, notifications, analytics, crash reports, and general logs. LID-OPS-003, LID-OPS-016, UX-PRIV-04.
  • There is no remember-journal-text feature. Unsaved Correction text may exist only in open-page memory with a close/reload warning. UX-PRIV-05.
  • Original and export downloads require explicit action and consequence copy because content leaves the protected surface. UX-PRIV-06.
  • Access denied, expired session, callback rejection, and provider failure use generic copy that does not reveal account, allowlist, secret, route, or content details. LID-SCP-001, LID-TG-001, LID-OPS-001–003, UX-PRIV-07–08.
  • Settings state exactly what crosses each selected AI boundary without claiming end-to-end encryption, zero knowledge, universal zero retention, a specific processing country, high availability, or unmeasured recovery. LID-AIT-006, LID-AIA-002, UX-PRIN-09–10, UX-PRIV-01–02.

Milestone-specific UX slices

The following grouping uses the canonical Product Council schedule. Each slice ends in independently verifiable user value. Dates are planning ranges; evidence gates, not the calendar, control completion.

P0 — Council Planning Baseline

Dates: 14–16 August 2026.
User value: The council can distinguish requirements, design intent, missing design, and implementation evidence before work reaches the roadmap.
Evidence: This review, the v5 audit, source hashes, the 58-task link map, and cross-document traceability.
v5 position: Audited design evidence only. No implementation claim.
Requirement scope: N/A for behavior change; this slice governs traceability for all stable LID requirements.

R0 — Shared-Host Private Foundation

Dates: 17–28 August 2026.
Independently verifiable value: Using synthetic content only, the owner can reach a private shell, understand access/readiness/health states, observe a measured backup and separate restore result, and see a demonstrated rollback without affecting a co-resident workload.
Acceptance focus: access denied and expiry; private no-store shell; calm first-use state; separate integration, backup, and recovery readiness; truthful degraded/offline copy; keyboard and compact access; no real memories admitted.
Requirements: LID-SCP-001, LID-REF-005, LID-REF-006, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-005, LID-OPS-008, LID-OPS-011, LID-OPS-014, LID-OPS-016, LID-OPS-018.
Design evidence: v5 supplies visual language and a generic private-archive cue. Access, first use, System Health, recovery, degraded, failure, and rollback states require new design. See UX first-use, System Health, and privacy.

R1 — Manual Journal Archive

Dates: 31 August–18 September 2026.
Independently verifiable value: The owner can add a supported journal file to an explicit date, receive success only after durable storage, revisit it through Calendar and Journal Day after reload, and restore the original file and source record from backup.
Acceptance focus: global and day-specific upload; file/date/encoding/size validation; duplicate Add Anyway; fixed-timezone date semantics; authentic source labeling; quiet empty archive; Calendar and Journal Day keyboard/compact behavior; load/error/interruption; back and reload continuity.
Requirements: LID-SCP-002, LID-SCP-003, LID-SCP-004, LID-UP-001, LID-UP-002, LID-UP-003, LID-REF-001, LID-REF-004, LID-REF-005, LID-REF-006, LID-OPS-004, LID-OPS-008, LID-OPS-011, LID-OPS-018.
Design evidence: v5 strongly supports Calendar, Journal Day, upload review, and compact direction. Durable, duplicate, reload, failure, empty, first-memory, and restore states require new design. See Calendar evidence, Journal Day evidence, upload evidence, Calendar contract, and upload contract.

R2 — Telegram Photo Capture

Dates: 21 September–9 October 2026.
Independently verifiable value: The configured owner can send a supported photo, receive acknowledgement only after durable encrypted capture, revisit it in a privacy-safe gallery, control its real-photo cover, resolve duplicates, and restore the original and metadata.
Acceptance focus: generic rejection of unauthorized contexts; content-based validation; caption date grammar; durable acknowledgement; invalid/future date preservation; album behavior; same-day and cross-day duplicate choices; caption display/search; gallery reorder/cover; local derivative; no-photo-to-AI proof.
Requirements: LID-SCP-002, LID-SCP-003, LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010, LID-REF-001, LID-REF-004, LID-REF-006, LID-OPS-004, LID-OPS-005, LID-OPS-006, LID-OPS-008, LID-OPS-009, LID-OPS-011, LID-OPS-016, LID-OPS-018.
Design evidence: v5 supports gallery, provenance, cover selection, and original download direction. Bot conversation, media validation, durable acknowledgement, duplicate choices, Photo Caption, media group, and Needs Date Review require new design. See Journal Day evidence, Telegram contract, and Date Review contract.

R3 — Retrieval and Date Integrity

Dates: 12–30 October 2026.
Independently verifiable value: The owner can find a memory predictably across Calendar, Timeline, journal text, generated fields, Photo Captions, dates, tags, and optionally labeled history, then correct an uncertain or wrong Journal Date without losing Original Timestamp or corrupting either day.
Acceptance focus: real Timeline; lexical/date/tag search; Include history off by default; field/source snippets; no query leakage; Needs Date Review; atomic redating preview and failure; cover, visibility, search, and stale-state recalculation.
Requirements: LID-SCP-002, LID-SCP-004, LID-TG-006, LID-TG-009, LID-VN-004, LID-SRC-003, LID-SRC-004, LID-REF-002, LID-REF-003, LID-REF-006, LID-OPS-016.
Design evidence: v5 offers partial lexical search and Change Journal Date entry points. Timeline, exact filters, Include history, Date Review, complete redating preview, failure, and query privacy require new design. Almanac is not Timeline evidence. See search evidence, Timeline contract, Search contract, and Date Review contract.

R4 — Source History and Lifecycle Safety

Dates: 2–20 November 2026.
Independently verifiable value: The owner can correct text without rewriting evidence, resolve a competing upstream revision deliberately, inspect provenance, move and restore content safely, preserve re-import/generation intent, and produce a validated portable archive.
Acceptance focus: complete accessible diff; exactly three conflict outcomes; unsaved Correction warning; history at source/derived/day/global levels; 30-day Trash; permanent-delete consequence copy; Source and Artwork Suppressions; encrypted export by default; expiry, partial failure, and round-trip validation.
Requirements: LID-SCP-004, LID-SRC-001, LID-SRC-002, LID-SRC-003, LID-SRC-004, LID-VN-006, LID-VN-007, LID-REF-003, LID-REF-004, LID-REF-007, LID-AIA-009, LID-OPS-009, LID-OPS-010, LID-OPS-013.
Design evidence: v5 partially supports the conflict callout, three action labels, Correction/reflection management entry points, and generic history/export links. Complete diff, editors, history, Trash, suppressions, export lifecycle, and round-trip states require new design. See conflict evidence, conflict contract, history contract, Trash contract, and export contract.

R5 — Prospective VoiceNotes Sync

Dates: 23 November–11 December 2026.
Independently verifiable value: After a passing synthetic spike and explicit activation, one eligible post-activation note can arrive, reconcile idempotently, preserve revisions, route uncertain dates to review, and remain locally retained through upstream change without importing historical notes.
Acceptance focus: synthetic identity/auth/retrieval/reconciliation gate; exact tag and activation disclosure; no historical import; authoritative retrieval; missing date review; revision and upstream status; suppression; visible failure/recovery; conflict resolution.
Requirements: LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-SRC-001, LID-SRC-002, LID-OPS-002, LID-OPS-015, LID-OPS-018.
Design evidence: v5 provides only settings placement, a Voice Journal label, and a conflict-direction fixture. Activation, consent/readiness, reconcile, upstream status, date uncertainty, failure, and suppression require new design. See settings evidence, conflict evidence, eligible-journal flow, and integration settings.

R6 — Generated Text Reflection

Dates: 14 December 2026–8 January 2027.
Independently verifiable value: With an evaluated and explicitly selected Text Provider, the owner can receive clearly labeled title, summary, tags, and Visual Brief; edit or protect each visible field independently; review later suggestions; and continue using authentic sources through every provider failure.
Acceptance focus: evaluation gate; provider confirmation; quiet-period/final refresh; structured validation; source-hash race; per-field protection; accessible comparison; provenance; privacy serializer; cost/credential/safety/failure states; no fallback; durable restore.
Requirements: LID-SCP-003, LID-REF-004, LID-REF-005, LID-REF-006, LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007, LID-OPS-003, LID-OPS-016, LID-OPS-017, LID-OPS-018.
Design evidence: v5 strongly supports generated-field hierarchy and the manage/protect/review direction. Provider selection, field-level accessible differences, pending/stale/source-race, complete failure taxonomy, measured cost, provenance, and restore require new design. See reflection evidence, derived-field review contract, and AI settings contract.

R7 — Generated Artwork

Dates: 11–29 January 2027.
Independently verifiable value: With an evaluated and selected Artwork Provider, the owner can deliberately create a labeled symbolic image from the read-only Visual Brief, understand preflight cost/safety/source conditions, preserve every version, select an earlier version, and trust that a real photo remains the cover.
Acceptance focus: evaluation gate; meaningful-word thresholds; sparse warning; provider/model/cost confirmation; Visual Brief-only serialization; safety/refusal/error; version history; active selection; stale state; suppression; sweep visibility; real-photo precedence; restore.
Requirements: LID-SCP-003, LID-REF-004, LID-REF-005, LID-REF-006, LID-AIT-003, LID-AIT-006, LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011, LID-OPS-003, LID-OPS-016, LID-OPS-017, LID-OPS-018.
Design evidence: v5 supplies artwork placement, a manual CTA, a sparse-source message, real-photo hierarchy, and labeling direction. Preflight confirmation, Visual Brief history, safety/failure, versions, stale, suppression, sweep, and budget states require new design. See Journal Day evidence, Artwork contract, and System Health.

R8 — Operational Scale and Resilience

Dates: 1–19 February 2027.
Independently verifiable value: The owner can understand measured capture, reconciliation, provider, spend, storage, backup, and restore state; authentic archive tasks remain available through bounded dependency failures; the supported browser/accessibility matrix and recovery routines are evidenced.
Acceptance focus: factual System Health; backup versus restore; capacity watermarks and emergency behavior; sanitized diagnostics; operational alerts only; restart and dependency failure; rollback; browser matrix; keyboard, screen reader, zoom, contrast, themes, reduced motion, and compact/landscape validation.
Requirements: LID-REF-005, LID-REF-006, LID-OPS-005, LID-OPS-006, LID-OPS-011, LID-OPS-014, LID-OPS-015, LID-OPS-016, LID-OPS-017, LID-OPS-018.
Design evidence: v5 has theme, focus, reduced-motion, compact, and placeholder health links only. Complete health, capacity, recovery, degraded, alert, and accessibility evidence is new. See System Health contract, responsive contract, accessibility contract, and failure states.

R9 — Private Launch Acceptance and Stabilization

Dates: 22 February–12 March 2027.
Independently verifiable value: The owner completes representative capture, browse, retrieve, correct, lifecycle, export, health, and recovery tasks without assistance; launch proceeds only after measured recovery, privacy, accessibility, and rollback evidence passes.
Acceptance focus: owner walkthrough; supported-browser/accessibility matrix; real first-use and session behavior; Recovery Ceremony; representative restore/decrypt/render; live observation; defect closure; explicit go/no-go and rollback decision; no feature expansion.
Requirements: LID-SCP-001, LID-SCP-002, LID-SCP-003, LID-SCP-004; LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010; LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007; LID-UP-001, LID-UP-002, LID-UP-003; LID-SRC-001, LID-SRC-002, LID-SRC-003, LID-SRC-004; LID-REF-001, LID-REF-002, LID-REF-003, LID-REF-004, LID-REF-005, LID-REF-006, LID-REF-007; LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007; LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011; LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-005, LID-OPS-006, LID-OPS-007, LID-OPS-008, LID-OPS-009, LID-OPS-010, LID-OPS-011, LID-OPS-012, LID-OPS-013, LID-OPS-014, LID-OPS-015, LID-OPS-016, LID-OPS-017, and LID-OPS-018. Evidence ownership remains in requirements traceability.
Design evidence: new acceptance evidence. v5 may supply task orientation but cannot satisfy launch acceptance. See validation plan, UX acceptance summary, and validation protocol.

R10 — Conditional Object-Store Transition

Dates: No dates until the approved measured trigger is met.
Independently verifiable value: During a triggered transition, the owner sees truthful storage and migration state while capture/read/recovery behavior remains explicit; complete inventory, restore, reversible cutover, observation, and rollback evidence exist before completion.
Acceptance focus: no pre-scheduling; measured trigger; progress and blocked/error states; complete inventory; dual-write/copy; hash/count reconciliation; remote-source backup/restore; reversible pointer change; observation; safe local eviction only after proof.
Requirements: LID-OPS-006, LID-OPS-007, LID-OPS-008, LID-OPS-009, LID-OPS-011, LID-OPS-014, LID-OPS-018.
Design evidence: entirely new apart from generic Settings placement. See System Health contract and loading/error contract.

Release task design-link map

The canonical roadmap metadata is PHASE1-ROADMAP-MANIFEST.json. This design trace repeats its 58 task IDs, titles, status lanes, milestone, task dates, descriptions, and exact requirement IDs so reviewers can validate the design relationship without creating a second authority. If fields drift, the manifest wins and this review must be reconciled.

Manifest validation on 14 August 2026: 58 tasks; milestones P0 and R0–R10; status counts 40 Backlog, 4 Next, 1 In progress, and 13 Done. Every Done row is a completed planning/definition artifact; no engineering, QA, release, deployment, recovery, or launch task is Done. R10 execution dates remain blank.

Task and canonical title Status Milestone Start Target Canonical description Requirement IDs Required design links Evidence classification and remaining design
AUD-001 — v5 Feature Audit Done P0 2026-08-14 2026-08-14 Classify every v5 interaction as strong, partial, missing, or outside implementation evidence. N/A — planning evidence; no behavior change v5 feature audit, v5 inventory v5 evidence reviewed; Done means audit evidence only.
PC-001 — Integrated Council Planning Package Done P0 2026-08-14 2026-08-16 Reconcile Product, Design, Architecture, and Project Management decisions into one delivery baseline. N/A — planning evidence; no behavior change this UX review, UX contract New council synthesis; no implementation Done claim.
SPK-R0-001 — Shared-host Coexistence & Rollback Spike In progress R0 2026-08-17 2026-08-19 Prove namespaced shared-host fit with synthetic data, explicit capacity assumptions, non-regression, restore, and rollback. LID-SCP-001, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-008, LID-OPS-011, LID-OPS-012, LID-OPS-014, LID-OPS-016, LID-OPS-018 R0 slice, first-use contract, health contract New design states; v5 visual language only.
PRD-R0-001 — Private Foundation PRD Done R0 2026-08-17 2026-08-20 Define the synthetic-only private foundation outcome and prohibit authentic memory ingestion before R0 acceptance. LID-SCP-001, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-008, LID-OPS-011, LID-OPS-012, LID-OPS-014, LID-OPS-016, LID-OPS-018 R0 slice, privacy contract New release definition; no v5 functional evidence.
UX-R0-001 — First-use/Access/Health States Next R0 2026-08-18 2026-08-21 Design first use, access denial/expiry, System Health, synthetic recovery, failure, and rollback states. LID-SCP-001, LID-OPS-001, LID-OPS-012, LID-OPS-014, LID-OPS-018 R0 slice, health contract, failure contract New design required; v5 supplies shell aesthetics only.
ARCH-R0-001 — Private Shell Architecture & Threat Baseline Next R0 2026-08-17 2026-08-21 Freeze namespaced processes, loopback ingress, callback isolation, encryption, secrets, logging, backup, and recovery architecture. LID-SCP-001, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-008, LID-OPS-011, LID-OPS-012, LID-OPS-014, LID-OPS-016, LID-OPS-018 R0 slice, durable state contract New architecture constrained by UX truth vocabulary.
ENG-R0-001 — Deploy Synthetic Private Shell Next R0 2026-08-21 2026-08-26 Build and deploy an authenticated synthetic shell with health evidence and no route or data path for real memories. LID-SCP-001, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-008, LID-OPS-011, LID-OPS-012, LID-OPS-014, LID-OPS-016, LID-OPS-018 R0 slice, accessibility/privacy gate New implementation; v5 is styling reference only.
REL-R0-001 — Restore/Rollback/Non-regression Acceptance Next R0 2026-08-27 2026-08-28 Execute access, coexistence, encrypted synthetic restore, restart, rollback, and co-resident non-regression gates. LID-SCP-001, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-008, LID-OPS-011, LID-OPS-012, LID-OPS-014, LID-OPS-016, LID-OPS-018 R0 slice, validation protocol New evidence required; prototype cannot satisfy release Done.
PRD-R1-001 — Manual Archive PRD Done R1 2026-08-31 2026-09-02 Define the first memory-creating release with explicit-date text upload and authentic Calendar/Journal Day recall. LID-SCP-002, LID-SCP-003, LID-UP-001, LID-UP-002, LID-UP-003, LID-REF-001, LID-REF-004, LID-REF-005, LID-REF-006, LID-OPS-011, LID-OPS-018 R1 slice, Calendar contract, upload contract v5-backed intent plus new durable/error requirements.
UX-R1-001 — Calendar/Day/Upload Designs Backlog R1 2026-08-31 2026-09-04 Finalize Calendar, Journal Day, upload, empty/loading/error, responsive, theme, and accessibility states. LID-SCP-002, LID-SCP-003, LID-UP-001, LID-UP-003, LID-REF-001, LID-REF-004, LID-REF-005, LID-REF-006 R1 slice, Calendar evidence, upload evidence Strong v5 happy path; new first-use, duplicate, durable, failure, reload states.
ARCH-R1-001 — Journal/Source/Encryption Schema Backlog R1 2026-08-31 2026-09-04 Define Journal Day, immutable source file, checksum, encryption, index, backup, restore, and migration contracts. LID-SCP-002, LID-SCP-003, LID-UP-001, LID-UP-002, LID-UP-003, LID-OPS-011, LID-OPS-018 R1 slice, durable state contract New architecture; must preserve v5 source hierarchy.
ENG-R1-001 — Manual Upload & Reflection Core Backlog R1 2026-09-03 2026-09-15 Implement durable explicit-date text upload, duplicate override, Calendar, and authentic Journal Day display. LID-SCP-002, LID-SCP-003, LID-UP-001, LID-UP-002, LID-UP-003, LID-REF-001, LID-REF-004, LID-REF-005, LID-REF-006, LID-OPS-011, LID-OPS-018 R1 slice, Journal Day evidence, responsive evidence v5-backed interaction; server and all negative states new.
REL-R1-001 — First-memory Restore/Rollback Acceptance Backlog R1 2026-09-16 2026-09-18 Verify one owner-approved source survives upload, restart, export, backup, restore, and rollback without time/date drift. LID-SCP-002, LID-SCP-003, LID-UP-001, LID-UP-002, LID-UP-003, LID-REF-001, LID-REF-004, LID-REF-005, LID-REF-006, LID-OPS-011, LID-OPS-018 R1 slice, validation protocol New durable/restore evidence required.
PRD-R2-001 — Telegram Capture PRD Done R2 2026-09-21 2026-09-23 Define authorized media forms, dating/review, durable acknowledgement, gallery, duplicate, caption, and privacy behavior. LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010, LID-OPS-005, LID-OPS-009, LID-OPS-011, LID-OPS-015, LID-OPS-018 R2 slice, Telegram contract Gallery intent exists; companion capture contract is new.
UX-R2-001 — Telegram/Date Review/Gallery Designs Backlog R2 2026-09-21 2026-09-25 Design companion messages, media/date failures, Needs Date Review, gallery, cover, duplicates, and media management. LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-OPS-015 R2 slice, gallery evidence, Date Review contract Partial v5 gallery evidence; most capture states new.
ARCH-R2-001 — Media Pipeline & Asset Lifecycle Backlog R2 2026-09-21 2026-09-25 Define callback authorization, bounded staging/decoding, ciphertext/derivative flow, media references, deduplication, and restore. LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010, LID-OPS-005, LID-OPS-009, LID-OPS-011, LID-OPS-015, LID-OPS-018 R2 slice, privacy gate New architecture; v5 does not evidence media handling.
ENG-R2-001 — Telegram Authorization & Durable Capture Backlog R2 2026-09-24 2026-10-02 Implement secret/sender/chat authorization, media validation, exact dating, review holding, and post-commit acknowledgement. LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-OPS-005, LID-OPS-011, LID-OPS-015, LID-OPS-018 R2 slice, Telegram contract New capture implementation and companion UX.
ENG-R2-002 — Gallery/Cover/Dedup/Derivatives Backlog R2 2026-09-28 2026-10-06 Implement durable gallery order, real-photo cover, global checksum references, captions, byte-preserved Originals, and local metadata-free thumbnails. LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010, LID-OPS-009, LID-OPS-011, LID-OPS-018 R2 slice, Journal Day evidence, UX contract v5-backed gallery direction; duplicate/caption/error states new.
REL-R2-001 — Media Privacy/Restore Acceptance Backlog R2 2026-10-07 2026-10-09 Execute capture, invalid input/date, album, duplicate, cover, Original, AI-exclusion, media restore, and rollback fixtures. LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010, LID-OPS-005, LID-OPS-009, LID-OPS-011, LID-OPS-015, LID-OPS-018 R2 slice, validation protocol New privacy, restore, and release evidence required.
PRD-R3-001 — Retrieval & Date Integrity PRD Done R3 2026-10-12 2026-10-14 Define cross-month Timeline, exact retrieval, query privacy, Date Review, and atomic redating invariants. LID-SRC-003, LID-REF-002, LID-REF-003, LID-REF-006, LID-OPS-011, LID-OPS-018 R3 slice, Search contract v5 search direction partial; integrity contract new.
UX-R3-001 — Timeline/Search/Date Review Designs Backlog R3 2026-10-12 2026-10-16 Design Timeline, search scope/results/history, Date Review, redating preview, interruption, and failure states. LID-SRC-003, LID-REF-002, LID-REF-003, LID-REF-006 R3 slice, search evidence, Date Review contract Partial v5 search; Timeline and date flows new.
ARCH-R3-001 — Search Index & Redating Transaction Backlog R3 2026-10-12 2026-10-16 Define encrypted lexical indexes, query/log privacy, date-review storage, and one-transaction old/new-day redating. LID-SRC-003, LID-REF-002, LID-REF-003, LID-REF-006, LID-OPS-011, LID-OPS-018 R3 slice, search/privacy contract New architecture constrained by visible truth and privacy states.
ENG-R3-001 — Timeline/Search/Date Review/Redating Backlog R3 2026-10-15 2026-10-28 Implement cross-month browsing, deterministic lexical/date/tag/caption retrieval, review resolution, and atomic redating. LID-SRC-003, LID-REF-002, LID-REF-003, LID-REF-006, LID-OPS-011, LID-OPS-018 R3 slice, Timeline contract, Search contract Basic v5 search only; most implementation and states new.
REL-R3-001 — Query Privacy & Date Atomicity Acceptance Backlog R3 2026-10-29 2026-10-30 Verify exact results, opt-in history, zero query leakage, two-day atomicity, index recovery, restore, and rollback. LID-SRC-003, LID-REF-002, LID-REF-003, LID-REF-006, LID-OPS-011, LID-OPS-018 R3 slice, validation protocol New integrity and release evidence required.
PRD-R4-001 — Lifecycle PRD Done R4 2026-11-02 2026-11-04 Define Corrections, conflict choices, source binding, History, Trash, suppressions, confirmations, and complete export. LID-SCP-004, LID-SRC-001, LID-SRC-002, LID-SRC-004, LID-REF-007, LID-OPS-010, LID-OPS-011, LID-OPS-013, LID-OPS-018 R4 slice, lifecycle contracts v5 partial conflict intent; full lifecycle new.
UX-R4-001 — Diff/History/Trash/Export Designs Backlog R4 2026-11-02 2026-11-06 Design accessible diff, Correction, History, Trash, suppression, confirmation, and encrypted-export workflows. LID-SCP-004, LID-SRC-001, LID-SRC-002, LID-SRC-004, LID-REF-007, LID-OPS-010, LID-OPS-013 R4 slice, conflict evidence, Trash contract Partial v5 actions; complete workflows new.
ARCH-R4-001 — Revision/Suppression/Export Lifecycle Backlog R4 2026-11-02 2026-11-06 Define immutable revisions/Corrections, active display binding, Trash/suppression state machine, passphrase handoff, export cleanup, and restore. LID-SCP-004, LID-SRC-001, LID-SRC-002, LID-SRC-004, LID-REF-007, LID-OPS-010, LID-OPS-011, LID-OPS-013, LID-OPS-018 R4 slice, history contract, export contract New architecture; must uphold exactly-three conflict outcomes.
ENG-R4-001 — Corrections/Conflict/History Backlog R4 2026-11-05 2026-11-13 Implement immutable Corrections, retained revisions, exactly three conflict outcomes, exact source-set binding, and inspectable History. LID-SCP-004, LID-SRC-001, LID-SRC-002, LID-SRC-004, LID-REF-007, LID-OPS-011, LID-OPS-018 R4 slice, conflict evidence, accessibility gate v5 action labels only; durable/editor/diff behavior new.
ENG-R4-002 — Trash/Suppressions/Export Backlog R4 2026-11-09 2026-11-18 Implement 30-day Trash, restoration/permanent deletion, suppressions, complete encrypted export, cleanup, and import validation. LID-SCP-004, LID-REF-007, LID-OPS-010, LID-OPS-011, LID-OPS-013, LID-OPS-018 R4 slice, Trash contract, export contract New design and implementation; v5 has placeholder links only.
REL-R4-001 — Lifecycle/Export Restore Acceptance Backlog R4 2026-11-19 2026-11-20 Verify conflict outcomes, deletion/restoration, day visibility, suppression, export completeness, import/restore, and rollback. LID-SCP-004, LID-SRC-001, LID-SRC-002, LID-SRC-004, LID-REF-007, LID-OPS-010, LID-OPS-011, LID-OPS-013, LID-OPS-018 R4 slice, validation protocol New lifecycle/restore evidence required.
SPK-R5-001 — VoiceNotes Synthetic Contract Spike Backlog R5 2026-11-23 2026-11-25 Prove exact note/revision identity, unattended authorization, authoritative retrieval, tag/date/transcript, wakeups, reconciliation, and failure behavior using synthetic data. LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005 R5 slice, unresolved gates New synthetic evidence; v5 is not integration proof.
PRD-R5-001 — VoiceNotes PRD Done R5 2026-11-23 2026-11-27 Define spike-gated prospective eligibility, activation, dating, reconciliation, revisions, suppression, and lifecycle behavior. LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-OPS-011, LID-OPS-015, LID-OPS-018 R5 slice, eligible-journal flow New bounded PRD; settings direction only in v5.
UX-R5-001 — Integration/Reconciliation/Lifecycle Designs Backlog R5 2026-11-24 2026-11-27 Design activation, integration health, Date Review, reconciliation, upstream revision/conflict, suppression, and re-import states. LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-OPS-015 R5 slice, settings evidence, conflict evidence Partial v5 settings/conflict; integration states new.
ARCH-R5-001 — VoiceNotes Adapter & Reconciliation Contract Backlog R5 2026-11-24 2026-11-27 Freeze the spike-proven adapter, opaque identities, authorization renewal, fail-closed paging, durable jobs, reconciliation, and restore design. LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-OPS-011, LID-OPS-015, LID-OPS-018 R5 slice, state contract New architecture; spike findings may change it.
ENG-R5-001 — Prospective Import & Revisions Backlog R5 2026-11-26 2026-12-09 Implement exact post-activation import, creation-time dating/review, replay-safe reconciliation, revisions, upstream status, suppression, and alerts. LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-OPS-011, LID-OPS-015, LID-OPS-018 R5 slice, integration settings, health contract New integration behavior; v5 source labels are visual intent only.
REL-R5-001 — Replay/Suppression/Restore Acceptance Backlog R5 2026-12-10 2026-12-11 Verify activation boundaries, missed/duplicate/out-of-order replay, revisions, suppression/re-import, integration failure isolation, restore, and rollback. LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-OPS-011, LID-OPS-015, LID-OPS-018 R5 slice, validation protocol New integration and recovery evidence required.
EVAL-R6-001 — Text Model Evaluation Backlog R6 2026-12-14 2026-12-18 Evaluate exact text provider/model snapshots against privacy, fidelity, schema, language, latency, and measured-cost hard gates. LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-006, LID-AIT-007, LID-OPS-017 R6 slice, AI settings contract New evaluation evidence; v5 model labels are not approval.
PRD-R6-001 — Generated Text PRD Done R6 2026-12-14 2026-12-18 Define evaluated optional text derivation, typed inputs, quiet/final refresh, protection, provenance, failures, and budgets. LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007, LID-REF-006, LID-OPS-011, LID-OPS-017, LID-OPS-018 R6 slice, derived-field contract v5-backed reflection intent plus new model/failure contract.
UX-R6-001 — Text/Provider/Budget States Backlog R6 2026-12-16 2026-12-22 Design title/summary/tag/brief review, field protection, stale suggestions, provenance, provider health, budget, and failure states. LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-007, LID-REF-006, LID-OPS-017 R6 slice, reflection evidence, AI settings evidence Strong v5 core intent; complete state system new.
ARCH-R6-001 — Text Adapter/Jobs/Budget/Provenance Backlog R6 2026-12-16 2026-12-22 Define typed allowlist serialization, exact adapter configuration, source-race-safe jobs, independent protection, provenance, usage ledger, and restore. LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007, LID-REF-006, LID-OPS-011, LID-OPS-017, LID-OPS-018 R6 slice, privacy gate New architecture; no provider request is evidenced by v5.
ENG-R6-001 — Text Derivation & Protected Fields Backlog R6 2026-12-21 2027-01-06 Implement evaluated title/summary/tag/Visual Brief derivation, quiet/final refresh, field protection, version choice, provenance, and budget enforcement. LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007, LID-REF-006, LID-OPS-011, LID-OPS-017, LID-OPS-018 R6 slice, derived-field contract v5-backed interactions; service, persistence, and negative states new.
REL-R6-001 — Text Privacy/Quality/Restore Acceptance Backlog R6 2027-01-07 2027-01-08 Verify hard-gate model quality, photo/caption exclusion, source races, protected fields, failures, monthly ceiling, derived restore, and rollback. LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007, LID-REF-006, LID-OPS-011, LID-OPS-017, LID-OPS-018 R6 slice, validation protocol New privacy and release evidence required.
EVAL-R7-001 — Artwork Model Evaluation Backlog R7 2027-01-11 2027-01-13 Evaluate exact artwork provider/model configurations against non-photorealism, safety, quality, latency, cost, and automatic-sweep eligibility gates. LID-AIA-001, LID-AIA-003, LID-AIA-005, LID-AIA-006, LID-AIA-011, LID-OPS-017 R7 slice, Artwork contract New evaluation evidence; v5 art is synthetic fixture only.
PRD-R7-001 — Artwork PRD Done R7 2027-01-11 2027-01-13 Define evaluated Visual Brief, manual/sweep generation, safety/failure, labeling, versions, cover precedence, suppression, and configuration. LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011, LID-REF-006, LID-OPS-011, LID-OPS-017, LID-OPS-018 R7 slice, Artwork contract Partial v5 direction plus new version/safety/budget contract.
UX-R7-001 — Artwork/Version/Suppression Designs Backlog R7 2027-01-12 2027-01-15 Design preflight, meaningful-word, safety/failure, persistent label, versions, stale, suppression, and real-photo-cover states. LID-AIA-002, LID-AIA-003, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-REF-006, LID-OPS-017 R7 slice, Journal Day evidence, Artwork contract Partial v5 CTA/placement; complete flow new.
ARCH-R7-001 — Artwork Adapter/Sweep/Budget/Provenance Backlog R7 2027-01-12 2027-01-15 Define exact adapter/configuration, preflight, idempotent sweep, artifact lifecycle, provenance, budget reservation, suppression, and restore. LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011, LID-REF-006, LID-OPS-011, LID-OPS-017, LID-OPS-018 R7 slice, privacy gate New architecture; v5 is not request/storage evidence.
ENG-R7-001 — Manual & Sweep Artwork Lifecycle Backlog R7 2027-01-14 2027-01-27 Implement evaluated explicit/sweep generation, versions, labeling, stale state, suppression, cover precedence, failures, and spend control. LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011, LID-REF-006, LID-OPS-011, LID-OPS-017, LID-OPS-018 R7 slice, Artwork contract Partial v5 UI intent; all durable/provider behavior new.
REL-R7-001 — Artwork Privacy/Cover/Restore Acceptance Backlog R7 2027-01-28 2027-01-29 Verify privacy, evaluation gates, preflight, failures, versions, suppression, real-photo cover, budget, artifact restore, and rollback. LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011, LID-REF-006, LID-OPS-011, LID-OPS-017, LID-OPS-018 R7 slice, validation protocol New privacy, restore, and release evidence required.
PRD-R8-001 — Resilience PRD Done R8 2027-02-01 2027-02-03 Define measured capacity, safe degradation, health, alerts, failure isolation, integrated recovery, and hardening outcomes. LID-OPS-006, LID-OPS-011, LID-OPS-014, LID-OPS-018, LID-REF-006 R8 slice, health contract New release definition; v5 has placeholders only.
ARCH-R8-001 — Capacity/Health/Alert/Fault Hardening Backlog R8 2027-02-01 2027-02-05 Harden measured watermarks, process/job supervision, durable health, alert transitions, dependency isolation, and recovery operations. LID-OPS-006, LID-OPS-011, LID-OPS-014, LID-OPS-018, LID-REF-006 R8 slice, failure contract New architecture and state projections.
QA-R8-001 — Integrated Fault/Security/Browser/Accessibility Suite Backlog R8 2027-02-04 2027-02-17 Execute integrated capacity, restart, dependency, privacy, security, browser, keyboard, screen-reader, zoom, theme, and restore tests. LID-SCP-001, LID-SCP-002, LID-SCP-003, LID-SCP-004, LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010, LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-UP-001, LID-UP-002, LID-UP-003, LID-SRC-001, LID-SRC-002, LID-SRC-003, LID-SRC-004, LID-REF-001, LID-REF-002, LID-REF-003, LID-REF-004, LID-REF-005, LID-REF-006, LID-REF-007, LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007, LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-005, LID-OPS-006, LID-OPS-007, LID-OPS-008, LID-OPS-009, LID-OPS-010, LID-OPS-011, LID-OPS-012, LID-OPS-013, LID-OPS-014, LID-OPS-015, LID-OPS-016, LID-OPS-017, LID-OPS-018 R8 slice, accessibility gate, validation protocol New measured QA evidence; screenshots alone do not pass.
REL-R8-001 — Resilience Release Acceptance Backlog R8 2027-02-18 2027-02-19 Accept the integrated operating envelope only after faults, alerts, capacity, backup/restore, rollback, and regressions pass. LID-SCP-001, LID-SCP-002, LID-SCP-003, LID-SCP-004, LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010, LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-UP-001, LID-UP-002, LID-UP-003, LID-SRC-001, LID-SRC-002, LID-SRC-003, LID-SRC-004, LID-REF-001, LID-REF-002, LID-REF-003, LID-REF-004, LID-REF-005, LID-REF-006, LID-REF-007, LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007, LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-005, LID-OPS-006, LID-OPS-007, LID-OPS-008, LID-OPS-009, LID-OPS-010, LID-OPS-011, LID-OPS-012, LID-OPS-013, LID-OPS-014, LID-OPS-015, LID-OPS-016, LID-OPS-017, LID-OPS-018 R8 slice, validation protocol New operational and release evidence required.
PRD-R9-001 — Launch Acceptance Plan Done R9 2027-02-22 2027-02-24 Define the owner UAT, Recovery Ceremony, severity gate, observation window, explicit authority, go/no-go, and rollback plan with no feature growth. LID-SCP-001, LID-SCP-002, LID-SCP-003, LID-SCP-004, LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010, LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-UP-001, LID-UP-002, LID-UP-003, LID-SRC-001, LID-SRC-002, LID-SRC-003, LID-SRC-004, LID-REF-001, LID-REF-002, LID-REF-003, LID-REF-004, LID-REF-005, LID-REF-006, LID-REF-007, LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007, LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-005, LID-OPS-006, LID-OPS-007, LID-OPS-008, LID-OPS-009, LID-OPS-010, LID-OPS-011, LID-OPS-012, LID-OPS-013, LID-OPS-014, LID-OPS-015, LID-OPS-016, LID-OPS-017, LID-OPS-018 R9 slice, UX acceptance summary New acceptance plan; v5 is orientation only.
QA-R9-001 — Owner UAT/Recovery Ceremony/Stabilization Backlog R9 2027-02-22 2027-03-10 Execute complete owner journeys, full representative recovery, defect stabilization, accessibility, privacy, spend, capacity, and failure scenarios. LID-SCP-001, LID-SCP-002, LID-SCP-003, LID-SCP-004, LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010, LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-UP-001, LID-UP-002, LID-UP-003, LID-SRC-001, LID-SRC-002, LID-SRC-003, LID-SRC-004, LID-REF-001, LID-REF-002, LID-REF-003, LID-REF-004, LID-REF-005, LID-REF-006, LID-REF-007, LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007, LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-005, LID-OPS-006, LID-OPS-007, LID-OPS-008, LID-OPS-009, LID-OPS-010, LID-OPS-011, LID-OPS-012, LID-OPS-013, LID-OPS-014, LID-OPS-015, LID-OPS-016, LID-OPS-017, LID-OPS-018 R9 slice, validation protocol, validation plan New launch evidence; prototype evidence cannot pass.
REL-R9-001 — Private Launch Go/No-go & Observation Backlog R9 2027-03-11 2027-03-12 Record explicit owner authority, severity status, Recovery Ceremony, observation evidence, and go/no-go or rollback decision. LID-SCP-001, LID-SCP-002, LID-SCP-003, LID-SCP-004, LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010, LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-UP-001, LID-UP-002, LID-UP-003, LID-SRC-001, LID-SRC-002, LID-SRC-003, LID-SRC-004, LID-REF-001, LID-REF-002, LID-REF-003, LID-REF-004, LID-REF-005, LID-REF-006, LID-REF-007, LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007, LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-005, LID-OPS-006, LID-OPS-007, LID-OPS-008, LID-OPS-009, LID-OPS-010, LID-OPS-011, LID-OPS-012, LID-OPS-013, LID-OPS-014, LID-OPS-015, LID-OPS-016, LID-OPS-017, LID-OPS-018 R9 slice, veto constraints New owner/council evidence required.
PID-R10-001 — Object-store Transition PID Done R10 Define the date-free capacity trigger, user-visible states, outcomes, non-goals, cutover, recovery, rollback, and owner acceptance boundary. LID-OPS-006, LID-OPS-007, LID-OPS-008, LID-OPS-011, LID-OPS-014, LID-OPS-018 R10 slice, health contract Entirely new conditional design; must remain unscheduled.
ARCH-R10-001 — Migration/Inventory/Backup/Rollback Runbook Backlog R10 Define complete pagination/inventory, encrypted keys, dual-write/copy, reconciliation, remote backup/restore, reversible pointers, observation, and rollback. LID-OPS-006, LID-OPS-007, LID-OPS-008, LID-OPS-011, LID-OPS-014, LID-OPS-018 R10 slice, loading/error contract New architecture and migration-state design.
REL-R10-001 — Conditional Transition Acceptance Backlog R10 After an approved trigger, execute and verify reversible object-store transition before retiring any local authoritative copy. LID-OPS-006, LID-OPS-007, LID-OPS-008, LID-OPS-011, LID-OPS-014, LID-OPS-018 R10 slice, validation protocol New migration evidence required; no prototype or planning-only Done claim.

Gaps between v5 and the full contract

Gap Why it matters Required release Disposition
Access, expiry, denial, and first-use readiness absent Personal content cannot be exposed before the private boundary and honest readiness state exist R0 New design and synthetic validation; release blocker
System Health is a placeholder Backup, restore, capacity, provider, job, and degraded truth would otherwise be invisible or misleading R0 baseline; complete R8 New design; factual evidence model required
Prototype outcomes are in-memory Toasts and changed fixture state can look durable when nothing survives reload R1 onward Replace every durable action with server-confirmed state and interruption handling
Timeline absent; Almanac is not equivalent Required chronological retrieval and focus-stable pagination are unproven R3 New Timeline design; Almanac may remain optional only after Timeline
Search scope and privacy incomplete Missing captions/filters/history and personal query in URL violate retrieval/privacy contracts R3 Redesign query state and results; v5 route behavior must not ship
Needs Date Review absent Invalid, future, or untrusted dates need safe holding rather than silent fallback or loss R2/R3 New queue, preview, resolution, error, and recovery design
Redating is only an entry point Cover, visibility, search, stale state, and two-day transaction effects are not explained R3 New preview, confirmation, progress, success, and atomic-failure states
Conflict diff/editor incomplete Three labels without complete accessible comparison and deterministic save can still rewrite meaning R4 New complete diff, editor, unsaved warning, event, and outcome design
History, Trash, suppressions, and export are placeholders Recovery and deletion intent cannot be trusted without complete lifecycle UX R4 New lifecycle and export designs; round-trip evidence
Bot companion and duplicate states absent Capture acknowledgements/rejections are part of the trust contract and must not overclaim durability R2 New private-safe message catalog and web handoff
Integration activation/reconciliation incomplete Prospective-only scope, uncertain dates, missed events, and upstream status are not visible R5 New readiness, status, conflict, failure, and suppression design after spike
Generated-text negative states incomplete Protection and provenance can fail silently under source race, invalid schema, budget, or provider outage R6 Extend v5 management into full state model
Artwork lifecycle incomplete A CTA alone cannot express privacy preflight, safety, versions, stale state, suppression, sweep, or cost R7 New complete artwork flow
Accessibility is plausible but unverified CSS and keyboard handlers do not establish WCAG or supported-browser conformance Every release; harden R8/R9 Measured manual and automated evidence
Backup, restore, rollback, and migration state absent Operational claims could exceed evidence and expose memories to avoidable loss R0, every data release, R8–R10 New factual status and ceremony designs

UX acceptance and validation protocol

Per-slice protocol

  1. Traceability review before design sign-off. Enumerate exact LID and UX IDs, user-visible states, failure classes, privacy boundary, persistent data shapes, rollback, restore impact, and deferred scope. A release-specific PRD/PID and UX artifact must agree.
  2. Scenario model. Produce public-safe synthetic fixtures for first use, happy path, empty, duplicate, invalid, interrupted, blocked, failed, stale, historical, Trash, restored, and degraded states applicable to the slice. No personal journal or photo is used in design or test artifacts.
  3. Interaction review. Verify entry, exit, cancel, Back, refresh, deep link, focus return, concurrent action scope, unsaved warning, durable success, and recovery path. Record every user-observable state, not just screens.
  4. Accessibility review. Run keyboard-only completion; visible focus; semantic/accessible-name inspection; restrained live-region behavior; screen-reader walkthrough; contrast measurement; target-size measurement; 320-pixel reflow; 200% text zoom; 400% page zoom; portrait/landscape; reduced motion; light/dark.
  5. Privacy review. Inspect page title, URL, referrer behavior, rendered notifications, network request schema, client storage, logs, analytics/dependency inventory, media locations, downloads, and screenshots for prohibited content. Verify no photo or photo-derived field can enter AI requests.
  6. Durability and interruption review. Exercise refresh, Back, duplicate submission, request retry, server restart, dependency failure, partial failure, stale completion, and rollback. A success message is accepted only after the named durable state exists.
  7. Recovery review. Restore every new data shape introduced by the slice, including source originals, metadata, versions, selections, lifecycle intent, and audit state. Backup upload and restore proof are recorded separately.
  8. Owner-value walkthrough. The owner completes the release's independently verifiable outcome without coaching. Confusion, trust failures, and inaccessible tasks receive defect/change IDs; they are not dismissed as prototype limitations.

Required evidence record

Each validation record includes release and task ID, artifact/build revision, synthetic fixture identifier and hash, date/time, browser and viewport, theme/motion/assistive-technology condition, step result, privacy inspection result, durable/restore evidence links, known limitations, defect IDs, reviewer, and owner disposition. Records contain no personal content, credentials, private account details, raw provider responses, or service secrets.

UX acceptance criteria common to every release

  • The release's owner-value sentence is completed end to end with synthetic data, and with real owner data only after the release explicitly permits it.
  • Every applicable contract item and exact requirement is Passed, Blocked, or Deferred with an approved reason; nothing is silently omitted.
  • Authentic and generated states remain programmatically and visually distinguishable.
  • No durable action reports success early and no failure destroys or hides an authentic source.
  • All affected core tasks pass the accessibility and privacy gates above.
  • Loading, empty, blocked, error, interruption, retry, and recovery are explicit and action-scoped.
  • Source, date, revision, lifecycle, provider, cost, backup, and restore claims match durable evidence.
  • Release rollback and restore preserve the prior usable state and every required source/lifecycle record.
  • A design/prototype link may satisfy design readiness; only implemented test, restore, deployment/observation, and owner evidence may satisfy an implementation or release Done state.

Explicit design-debt deferrals

These deferrals are allowed only if they do not weaken the contracts above.

Deferred design work Earliest revisit Boundary that remains now
Refine Almanac as a secondary book-like view After R3 It is not a substitute for required Timeline; Calendar, Timeline, Search, and Journal Day take priority
Empty-cell shortcut into dated upload After R1 core upload Empty cells remain quiet and never create blank browser journals
Decorative transition and micro-motion polish R8 or later Reduced-motion and immediate understandable state change ship first
Additional theme flourish, custom type, or illustration decoration R8 or later System fonts, measured contrast, readable provenance, and privacy-safe asset delivery remain
Historical VoiceNotes import New post-MVP decision Prospective exact-tag activation remains fixed; no hidden enumeration/import
Blank browser composition and PDF/Word/OCR journal intake New post-MVP decision Only approved text-file upload is offered
Semantic/conversational search and journal Q&A New privacy/AI decision R3 search remains deterministic lexical/date/tag and sends no query/corpus to AI
Year mosaic, media wall, map, location, On This Day, native app, and offline sync New post-MVP decision No location collection or offline personal-content cache is introduced
Coaching, prompts, diagnosis, streaks, reminders, weekly reports, or social behavior New product/privacy decision The archive stays observational, private, and non-coercive
Arbitrary provider/model entry and premium automatic sweep Not an MVP option Only evaluated typed configurations appear; no silent fallback

The following are not design debt and cannot be deferred past their named release: access/session states, durable success/error/interruption, Timeline, query privacy, Date Review, redating preview, accessible conflict diff, History, Trash, suppressions, export lifecycle, integration activation/reconciliation, AI failure/provenance, artwork privacy/version/safety, System Health truth, accessibility evidence, Recovery Ceremony, or migration rollback.

Veto-level sequencing constraints

  1. R0 before real content. R1 is blocked until the synthetic private shell, no-store behavior, backup/restore distinction, co-resident non-regression, and rollback have evidence. Real memories must not be used to prove R0.
  2. Durable source before reflective polish. Calendar and Journal Day may not present capture success until source bytes/records, Journal Date, Original Timestamp, and provenance commit as one accepted operation.
  3. Photo privacy before R2 capture. Authorization, bounded decode, durable encrypted capture, local derivative, and structural photo-to-AI denial must exist before successful bot acknowledgement.
  4. Date correction is atomic. Needs Date Review and redating must update day visibility, cover, search, stale state, and both affected days together; no partial success or receipt-time fallback.
  5. Lifecycle safety before prospective sync. R4 Correction/history/Trash/suppression behavior must exist before R5 reconciliation can introduce upstream revision and resurrection risk.
  6. Synthetic integration gate before R5 enablement. A material failure in identity, authorization, authoritative retrieval, activation, or reconciliation reopens the affected decision; it is not patched with invented behavior.
  7. Evaluated provider and privacy serializer before R6. No model label in v5 authorizes selection. Protected fields never overwrite; provider failure cannot block authentic reading.
  8. Visual-Brief-only boundary before R7. Artwork may not receive raw journals, photos, captions, identifiers, or photo-derived data. Real photos always retain cover precedence.
  9. Measured operations before launch. R9 is blocked until supported-browser/accessibility, privacy, security, per-shape restore, recovery-key ceremony, owner usability, observation, and rollback evidence pass.
  10. R10 remains undated. No task receives start or target dates until approved measured watermarks trigger the transition. Cutover is blocked on complete inventory, restore proof, reversible migration, observation, and rollback.
  11. Prototype evidence never closes implementation. A v5-backed row may become design-ready; it cannot become engineering, release, deployment, recovery, or launch Done without the named non-prototype evidence.

Council recommendation

Approve the R0–R10 sequence and the 58-task design-link map as the UX planning baseline. Use v5 as the visual and interaction reference for R1, partial R2/R3/R4, R6, and partial R7. Create new release-specific designs for R0, most of R2–R5, the negative and provenance states in R6/R7, all operational states in R8, acceptance evidence in R9, and every migration state in R10.

The UI/UX Designer should close each release's named gaps before its implementation task becomes Next. The Product and Architecture reviewers should veto any task whose design implies a success, privacy, durability, recovery, or readiness claim stronger than its evidence.

Life in Days

Home

Product, experience, architecture, and delivery

Discovery and research

Governance and council

Prototype handoffs

Prototype run guides

Prototype councils

QA and audits

Repository and project record

Evidence and maintenance

Clone this wiki locally