Notifications
You must be signed in to change notification settings - Fork 0
Docs Product Releases PRD R0 Shared Host Private Foundation
Canonical source:
docs/product/releases/PRD-R0-SHARED-HOST-PRIVATE-FOUNDATION.md· Snapshot commit:2f69111d7fca
| Field | Value |
|---|---|
| Release | R0 — Shared-Host Private Foundation |
| Document type | Product requirements document |
| Status | Planning draft; not an approval or release record |
| Accountable role | Product owner |
| Proposed start | 2026-08-17 |
| Proposed target | 2026-08-28 |
| Date confidence | Planning estimate only. Evidence gates, not dates, control entry and exit. |
| Evidence boundary | This document defines intended behavior. It does not establish implementation, testing, deployment, production use, or acceptance. |
- Governing product requirements
- Product Manager review
- Phase 1 release plan
- Phase 1 implementation plan
- Shared-host deployment spike
- UX specification
- Prototype v5 feature audit
- Prototype v5
The deployment spike and prototype are planning evidence only. Neither proves a live environment, a secure configuration, or a working product.
Life in Days needs a private, recoverable operating foundation before authentic memories are permitted. The first risk is not feature desirability; it is whether a one-user archive can coexist with other services, enforce one human boundary, protect synthetic data, expose honest health, and return to its prior state after an unsuccessful change.
R0 intends to make a synthetic-only private shell usable by the owner for access, denial, health, recovery, restart, upgrade, and rollback walkthroughs. It must contain no authentic memory and no route that can create one. R1, not R0, is the first memory-creating release.
Included requirement IDs (11): LID-SCP-001, LID-OPS-001, LID-OPS-002, LID-OPS-003, LID-OPS-004, LID-OPS-008, LID-OPS-011, LID-OPS-012, LID-OPS-014, LID-OPS-016, LID-OPS-018.
Excluded requirement IDs (67): LID-SCP-002, LID-SCP-003, LID-SCP-004, LID-TG-001, LID-TG-002, LID-TG-003, LID-TG-004, LID-TG-005, LID-TG-006, LID-TG-007, LID-TG-008, LID-TG-009, LID-TG-010, LID-VN-001, LID-VN-002, LID-VN-003, LID-VN-004, LID-VN-005, LID-VN-006, LID-VN-007, LID-UP-001, LID-UP-002, LID-UP-003, LID-UP-004, LID-SRC-001, LID-SRC-002, LID-SRC-003, LID-SRC-004, LID-REF-001, LID-REF-002, LID-REF-003, LID-REF-004, LID-REF-005, LID-REF-006, LID-REF-007, LID-AIT-001, LID-AIT-002, LID-AIT-003, LID-AIT-004, LID-AIT-005, LID-AIT-006, LID-AIT-007, LID-AIA-001, LID-AIA-002, LID-AIA-003, LID-AIA-004, LID-AIA-005, LID-AIA-006, LID-AIA-007, LID-AIA-008, LID-AIA-009, LID-AIA-010, LID-AIA-011, LID-OPS-005, LID-OPS-006, LID-OPS-007, LID-OPS-009, LID-OPS-010, LID-OPS-013, LID-OPS-015, LID-OPS-017, LID-DEF-001, LID-DEF-002, LID-DEF-003, LID-DEF-004, LID-DEF-005, LID-DEF-006.
Excluded means not owned by R0. It does not change the governing backlog or authorize implementation of a later requirement.
- The owner reaches the private shell through the approved human access boundary, while an unauthenticated, expired, or non-owner request sees no HTML, API, media, search, or export content.
- A callback request reaches only an opaque machine path; unknown hosts, paths, methods, or oversized requests fail without entering a human route.
- The owner views System Health and can distinguish never run, unknown, healthy, delayed, failed, and blocked synthetic states.
- An operator creates an encrypted synthetic backup, restores it into a disposable environment, and records elapsed recovery time without exposing recovery material.
- A synthetic upgrade is rolled back and the shell returns to the pre-change state without material regression to co-resident services.
- LID-SCP-001 and LID-OPS-001: exactly one allowlisted human identity is admitted; missing, invalid, non-owner, and expired access assertions are rejected at the application boundary; no sharing or public route exists.
- LID-OPS-002: the callback surface is separate from human routes, accepts only approved methods and bounded payloads, and cannot retrieve human-session or media responses.
- LID-OPS-003: fixtures, repository history, client assets, exports, and sanitized logs contain no credentials, access assertions, recovery material, or account identifiers; secrets can rotate without rewriting archive history.
- LID-OPS-004: representative synthetic database and object bytes are authenticated ciphertext at rest, carry encryption-version metadata, and decrypt only with separately supplied recovery material.
- LID-OPS-008: personal-shaped synthetic responses use authenticated same-origin delivery and private, no-store cache behavior; no storage URL or decryption key reaches the browser.
- LID-OPS-011: an application-consistent encrypted synthetic snapshot, repository check, sampled restore, and integrity comparison are recorded; upload completion alone does not count as restore evidence.
- LID-OPS-012: a rehearsal records two independent off-server recovery-key locations by non-secret description and uses recovery material to decrypt the synthetic sample.
- LID-OPS-014: System Health reads durable evidence and never reports a job as successful merely because it started.
- LID-OPS-016: local structured logs contain only allowlisted timestamps, opaque identifiers, and error classes and expire on the documented retention path.
- LID-OPS-018: restart resumes idempotent synthetic jobs; a failed dependency remains visible without making the healthy shell unavailable; no high-availability or service-level promise appears.
- The shared-host capacity, process namespace, route namespace, port allocation, resource limits, restart policy, and coexistence checks have sanitized recorded evidence.
- Human and machine boundaries fail closed. Personal-shaped responses are non-cacheable by shared intermediaries.
- The recovery rehearsal is measured against the four-hour recovery target; the actual result is recorded rather than assumed.
- Logs, diagnostic bundles, screenshots, and evidence artifacts contain no secret or authentic private content.
- The shell exposes semantic headings, labeled controls, visible focus, keyboard access, responsive layout, readable zoom behavior, and reduced-motion behavior for its available states.
- The release can be removed or reverted without changing co-resident route and process behavior.
R0 design must cover first access, access denial, session expiry, empty synthetic home, System Health state taxonomy, recovery-in-progress, recovery failure, dependency failure, restart, maintenance, and rollback messaging. It must not imitate a populated personal archive or imply that the prototype is connected to real data.
The UX specification governs tone, visual hierarchy, themes, focus, motion, and responsive behavior. Prototype v5 is interaction direction only; its in-memory sample content is not an R0 implementation reference.
- P0 planning baseline is published and unresolved council decisions that affect access, encryption, recovery, routing, or rollback are either closed or explicitly block entry.
- The shared-host spike records sanitized capacity assumptions, route/process isolation, coexistence tests, restart behavior, backup/restore mechanics, and a reversible removal path.
- Architecture decisions define human access assertion validation, callback isolation, runtime secret injection, authenticated encryption, private delivery/cache rules, structured-log allowlists, health evidence, and recovery.
- No authentic memory fixture, production credential, real callback, or public route is needed or permitted to prove R0.
- R0 exit is a dependency for every later release. Its backup, restore, health, privacy, and rollback contracts remain regression gates thereafter.
| Metric | R0 target | Evidence placeholder |
|---|---|---|
| Owner access and denial scenarios | 100% of approved synthetic fixtures produce the expected allow or deny result | Not yet provided |
| Secret/content leakage | Zero forbidden values in repository, client bundle, export, logs, and evidence scans | Not yet provided |
| Synthetic backup integrity | 100% of selected records and objects match after restore | Not yet provided |
| Recovery timing | Measured and compared with the four-hour target | Not yet provided |
| Coexistence regression | Zero material regression in the agreed co-resident checks | Not yet provided |
| Rollback | One recorded return to the exact pre-change synthetic state | Not yet provided |
| Accessibility | No blocking issue in keyboard, focus, labels, contrast, zoom, or reduced-motion checks for R0 surfaces | Not yet provided |
- Only synthetic, non-personal fixtures may be used.
- The product remains one-user and private, with no sharing, invitation, public link, or anonymous route.
- Runtime secrets and recovery values must never enter source, issue text, documentation, screenshots, logs, exports, or browser code.
- Encryption-at-rest claims must state their limit: a compromised running application can access data. R0 must not claim end-to-end or zero-knowledge encryption.
- The callback boundary is machine-only; the human access boundary does not substitute for callback authorization.
All R0 surfaces must be keyboard operable, focus visible, screen-reader named, usable at browser zoom, and understandable without motion. Light and dark presentations must meet WCAG 2.2 AA contrast targets. Denial, unknown, blocked, failure, and recovery states must be conveyed in text, not color alone.
R0 introduces the foundation data shape: encrypted synthetic database/object content, operational evidence, configuration metadata without secrets, and backup manifests. Exit requires an encrypted backup and executed restore of that shape. Recovery evidence records the sample, checksums, elapsed time, and result without recording keys.
Rollback must remove or revert the R0 application, routes, processes, schedules, schema, and synthetic data while preserving the prior state of co-resident services. The pre-change snapshot, rollback command plan, post-rollback checks, and decision owner are evidence, not assumptions.
- P0 planning artifacts and requirement traceability are available.
- The synthetic-only boundary and prohibited authentic-data paths are reviewable.
- Required architecture decisions and the shared-host spike have no unresolved critical blocker.
- A disposable restore target and rollback rehearsal path are defined.
- Test fixtures contain no real memory, credential, or private account data.
- Every included requirement has requirement-level acceptance evidence or an explicit no-go.
- Owner access/denial, callback isolation, secret scanning, ciphertext inspection, cache behavior, health state, backup, restore, restart, coexistence, and rollback scenarios have executed evidence.
- The encrypted synthetic restore result is recorded and readable without exposing key material.
- No unresolved severity-1 or severity-2 defect remains in an R0 boundary.
- The release decision record says proceed, hold, or roll back and names the evidence reviewed.
- Any authentic memory or real-photo data is needed, captured, logged, or displayed.
- Any human route bypasses the access boundary, or any callback can reach a human/media route.
- Plaintext content, a credential, or recovery material appears in persistent storage, client code, logs, exports, or evidence.
- Restore or rollback is unexecuted, fails integrity checks, or cannot return co-resident services to their prior state.
- Health status is optimistic, capacity is unknown, or the shared-host spike has an unresolved critical coexistence finding.
- Authentic journal or photo ingestion.
- Telegram or VoiceNotes integration.
- Calendar, Timeline, Search, Journal Day management, Corrections, Trash, or export.
- AI text or artwork.
- Public access, sharing, multi-user records, native apps, offline-first behavior, or a high-availability promise.
- A live object-store transition.
| Evidence | Expected artifact | Status |
|---|---|---|
| Requirement traceability | R0 requirement checklist with scenario IDs | Not yet provided |
| Design review | R0 access, health, failure, recovery, and rollback state review | Not yet provided |
| Architecture decision | Access, callback, secrets, encryption, delivery, logging, health, recovery, and rollback records | Not yet provided |
| Functional test report | Sanitized owner/callback/system scenario results | Not yet provided |
| Privacy/security report | Threat review, secret scan, ciphertext and cache checks | Not yet provided |
| Accessibility report | Keyboard, labels, focus, contrast, zoom, responsive, and motion checks | Not yet provided |
| Backup/restore report | Synthetic snapshot, repository check, restore, checksums, and elapsed time | Not yet provided |
| Rollback report | Pre-state, actions, post-state, and coexistence comparison | Not yet provided |
| Owner acceptance | Proceed, hold, or rollback record | Not yet provided |
Requirements, designs, prototypes, spikes, plans, and blank evidence rows are intent. Only dated executed evidence can support a later claim about implementation, testing, deployment, recovery, or release acceptance.
Generated from arunpr614/Life-Reflection@6b8b70b72148 · Canonical content lives in Git · Fictional prototype data only
- Life in Days — Hetzner shared-host runbook
- Life in Days — Phase1 implementation plan
- PID R10 — Conditional Object-Store Transition
- PRD R0 — Shared-Host Private Foundation
- PRD R1 — Manual Journal Archive
- PRD R2 — Telegram Photo Capture
- PRD R3 — Retrieval and Date Integrity
- PRD R4 — Source History and Lifecycle Safety
- PRD R5 — Prospective VoiceNotes Sync
- PRD R6 — Generated Text Reflection
- PRD R7 — Generated Artwork
- PRD R8 — Operational Scale and Resilience
- PRD R9 — Private Launch Acceptance and Stabilization
- Life in Days release documents
- Life in Days Phase 1 — AI agent resource index
- Codex Goal prompt — Phase 1 P0 requirements to private production
- P0 Codex Gold Goal prompt — complete P0 and R0 only
- Phase 1 GitHub Project V2 sync
- Life in Days — Phase 1 Release Plan
- Life in Days — detailed implementation plan
- Life in Days Global PRD
- Life in Days — project tracker
- Life in Days — prototype completeness tracker
- Life in Days — requirements traceability
- Life in Days — UX specification
- Life in Days — AI Artwork Model Evaluation
- Life in Days — AI Text Model Evaluation
- Initial product brief
- Life in Days: Private Media Storage Evaluation
- Requirements under discovery
- Product and integration research
- Project Git provenance
- Life in Days — proposed shared understanding
- Life in Days — Product Council planning-baseline review
- Life in Days Phase 1 — Independent QA Lead charter
- Agent charter — Project Manager
- Agent charter — Senior Product Manager
- Agent charter — Technical Architect
- Agent charter — UI/UX Design Lead
- Life in Days Phase 1 — P0 Owner Action Ledger
- Life in Days Phase 1 — P0 execution context digest
- Life in Days Phase 1 — P0 execution authorization addendum
- Life in Days Phase 1 — P0 execution council charter
- Life in Days Phase 1 — P0 execution decision ledger
- Life in Days Phase 1 — P0 task Definition of Ready
- Life in Days Phase 1 — P0 execution-control review
- P0/R0 Stage 0 control-repair candidate review dossier
- P0/R0 Stage 0 delivery checklist
- P0/R0 Stage 0 rollback and recovery plan
- P0/R0 Stage 0 state contract
- P0/R0 Stage 0 test plan
- PC-001 readiness-control hardening — planning review
- Life in Days — Phase 1 Product Council Decision Record
- Life in Days Phase 1 — source baseline
- Life in Days Phase 1 — Product Council charter
- Life in Days — Product Manager Council Review
- Life in Days — Project Manager Council Review
- Life in Days — Product Council UX Design Review
- Life in Days Product Council
- Life in Days — calendar UI prototype
- Life in Days — calendar UI prototype v2
- Life in Days — unified Calendar and Almanac prototype v3
- Life in Days — Museum Margin Calendar prototype v4
- Life in Days — private Settings and compact privacy prototype v5
- Life in Days — private Search prototype v6
- Life in Days — Calendar contract prototype v7
- Life in Days — Cross-month Almanac prototype v8
- Life in Days — First-use Readiness prototype v9
- Life in Days — Resilient Application Shell prototype v10
- Life in Days calendar UI prototype
- Life in Days calendar UI prototype v2
- Life in Days unified calendar prototype v3
- Life in Days Museum Margin prototype v4
- Life in Days Settings prototype v5
- Life in Days — private Search prototype v6
- Life in Days prototype v7 — Calendar contract completion
- Life in Days prototype v8 — Cross-month Almanac
- Life in Days prototype v9 — First-use Readiness
- Life in Days prototype v10 — Resilient Application Shell
- v6 Product Council contract — Private Search State
- Life in Days prototype v7 — Product Council contract
- Life in Days prototype v8 — Product Council contract
- Life in Days prototype v9 — Product Council contract
- Life in Days prototype v10 — Product Council contract
- Life in Days v2 — design QA
- Life in Days unified prototype v3 — design QA
- Life in Days v4 — design QA
- Life in Days v5 design QA
- Life in Days v5 design QA
- Life in Days v6 — independent design and interaction QA
- Life in Days v7 — independent design and interaction QA
- Life in Days prototype v8 — independent design QA
- Life in Days prototype v9 — independent design QA
- Life in Days prototype v10 — independent design QA
- Life in Days prototype v5 — PRD feature audit
- AI agent operating contract — keep Phase 1 alive
- Contributing to Life in Days
- GitHub Projects Roadmap — current capability research
- Life in Days — Hetzner shared-host deployment spike
- Wayfinder for Life in Days Phase 1 — adoption and GitHub integration report
- Life in Days — GitHub Projects Roadmap design spike
- ARCH-R0-001 — Product Council task readiness
- ARCH-R0-001 — task delivery checklist
- ARCH-R0-001 — task design specification
- ARCH-R0-001 — task product requirements
- ARCH-R0-001 — task QA plan
- ARCH-R0-001 — task technical plan
- ARCH-R1-001 — Product Council task readiness
- ARCH-R1-001 — task delivery checklist
- ARCH-R1-001 — task design specification
- ARCH-R1-001 — task product requirements
- ARCH-R1-001 — task QA plan
- ARCH-R1-001 — task technical plan
- ARCH-R2-001 — Product Council task readiness
- ARCH-R2-001 — task delivery checklist
- ARCH-R2-001 — task design specification
- ARCH-R2-001 — task product requirements
- ARCH-R2-001 — task QA plan
- ARCH-R2-001 — task technical plan
- ARCH-R3-001 — Product Council task readiness
- ARCH-R3-001 — task delivery checklist
- ARCH-R3-001 — task design specification
- ARCH-R3-001 — task product requirements
- ARCH-R3-001 — task QA plan
- ARCH-R3-001 — task technical plan
- ARCH-R4-001 — Product Council task readiness
- ARCH-R4-001 — task delivery checklist
- ARCH-R4-001 — task design specification
- ARCH-R4-001 — task product requirements
- ARCH-R4-001 — task QA plan
- ARCH-R4-001 — task technical plan
- ARCH-R5-001 — Product Council task readiness
- ARCH-R5-001 — task delivery checklist
- ARCH-R5-001 — task design specification
- ARCH-R5-001 — task product requirements
- ARCH-R5-001 — task QA plan
- ARCH-R5-001 — task technical plan
- ARCH-R6-001 — Product Council task readiness
- ARCH-R6-001 — task delivery checklist
- ARCH-R6-001 — task design specification
- ARCH-R6-001 — task product requirements
- ARCH-R6-001 — task QA plan
- ARCH-R6-001 — task technical plan
- ARCH-R7-001 — Product Council task readiness
- ARCH-R7-001 — task delivery checklist
- ARCH-R7-001 — task design specification
- ARCH-R7-001 — task product requirements
- ARCH-R7-001 — task QA plan
- ARCH-R7-001 — task technical plan
- ARCH-R8-001 — Product Council task readiness
- ARCH-R8-001 — task delivery checklist
- ARCH-R8-001 — task design specification
- ARCH-R8-001 — task product requirements
- ARCH-R8-001 — task QA plan
- ARCH-R8-001 — task technical plan
- ARCH-R10-001 — Product Council task readiness
- ARCH-R10-001 — task delivery checklist
- ARCH-R10-001 — task design specification
- ARCH-R10-001 — task product requirements
- ARCH-R10-001 — task QA plan
- ARCH-R10-001 — task technical plan
- AUD-001 — Product Council task readiness
- AUD-001 — task delivery checklist
- AUD-001 — task design specification
- AUD-001 — task product requirements
- AUD-001 — task QA plan
- AUD-001 — task technical plan
- ENG-R0-001 — Product Council task readiness
- ENG-R0-001 — task delivery checklist
- ENG-R0-001 — task design specification
- ENG-R0-001 — task product requirements
- ENG-R0-001 — task QA plan
- ENG-R0-001 — task technical plan
- ENG-R1-001 — Product Council task readiness
- ENG-R1-001 — task delivery checklist
- ENG-R1-001 — task design specification
- ENG-R1-001 — task product requirements
- ENG-R1-001 — task QA plan
- ENG-R1-001 — task technical plan
- ENG-R2-001 — Product Council task readiness
- ENG-R2-001 — task delivery checklist
- ENG-R2-001 — task design specification
- ENG-R2-001 — task product requirements
- ENG-R2-001 — task QA plan
- ENG-R2-001 — task technical plan
- ENG-R2-002 — Product Council task readiness
- ENG-R2-002 — task delivery checklist
- ENG-R2-002 — task design specification
- ENG-R2-002 — task product requirements
- ENG-R2-002 — task QA plan
- ENG-R2-002 — task technical plan
- ENG-R3-001 — Product Council task readiness
- ENG-R3-001 — task delivery checklist
- ENG-R3-001 — task design specification
- ENG-R3-001 — task product requirements
- ENG-R3-001 — task QA plan
- ENG-R3-001 — task technical plan
- ENG-R4-001 — Product Council task readiness
- ENG-R4-001 — task delivery checklist
- ENG-R4-001 — task design specification
- ENG-R4-001 — task product requirements
- ENG-R4-001 — task QA plan
- ENG-R4-001 — task technical plan
- ENG-R4-002 — Product Council task readiness
- ENG-R4-002 — task delivery checklist
- ENG-R4-002 — task design specification
- ENG-R4-002 — task product requirements
- ENG-R4-002 — task QA plan
- ENG-R4-002 — task technical plan
- ENG-R5-001 — Product Council task readiness
- ENG-R5-001 — task delivery checklist
- ENG-R5-001 — task design specification
- ENG-R5-001 — task product requirements
- ENG-R5-001 — task QA plan
- ENG-R5-001 — task technical plan
- ENG-R6-001 — Product Council task readiness
- ENG-R6-001 — task delivery checklist
- ENG-R6-001 — task design specification
- ENG-R6-001 — task product requirements
- ENG-R6-001 — task QA plan
- ENG-R6-001 — task technical plan
- ENG-R7-001 — Product Council task readiness
- ENG-R7-001 — task delivery checklist
- ENG-R7-001 — task design specification
- ENG-R7-001 — task product requirements
- ENG-R7-001 — task QA plan
- ENG-R7-001 — task technical plan
- EVAL-R6-001 — Product Council task readiness
- EVAL-R6-001 — task delivery checklist
- EVAL-R6-001 — task design specification
- EVAL-R6-001 — task product requirements
- EVAL-R6-001 — task QA plan
- EVAL-R6-001 — task technical plan
- EVAL-R7-001 — Product Council task readiness
- EVAL-R7-001 — task delivery checklist
- EVAL-R7-001 — task design specification
- EVAL-R7-001 — task product requirements
- EVAL-R7-001 — task QA plan
- EVAL-R7-001 — task technical plan
- PC-001 — readiness-control hardening Council record
- PC-001 — readiness-control hardening delivery plan
- PC-001 — readiness-control evidence design specification
- PC-001 — readiness-control hardening product requirements
- PC-001 — readiness-control hardening QA plan
- PC-001 — readiness-control hardening technical plan
- PID-R10-001 — Product Council task readiness
- PID-R10-001 — task delivery checklist
- PID-R10-001 — task design specification
- PID-R10-001 — task product requirements
- PID-R10-001 — task QA plan
- PID-R10-001 — task technical plan
- PRD-R0-001 — Product Council task readiness
- PRD-R0-001 — task delivery checklist
- PRD-R0-001 — task design specification
- PRD-R0-001 — task product requirements
- PRD-R0-001 — task QA plan
- PRD-R0-001 — task technical plan
- PRD-R1-001 — Product Council task readiness
- PRD-R1-001 — task delivery checklist
- PRD-R1-001 — task design specification
- PRD-R1-001 — task product requirements
- PRD-R1-001 — task QA plan
- PRD-R1-001 — task technical plan
- PRD-R2-001 — Product Council task readiness
- PRD-R2-001 — task delivery checklist
- PRD-R2-001 — task design specification
- PRD-R2-001 — task product requirements
- PRD-R2-001 — task QA plan
- PRD-R2-001 — task technical plan
- PRD-R3-001 — Product Council task readiness
- PRD-R3-001 — task delivery checklist
- PRD-R3-001 — task design specification
- PRD-R3-001 — task product requirements
- PRD-R3-001 — task QA plan
- PRD-R3-001 — task technical plan
- PRD-R4-001 — Product Council task readiness
- PRD-R4-001 — task delivery checklist
- PRD-R4-001 — task design specification
- PRD-R4-001 — task product requirements
- PRD-R4-001 — task QA plan
- PRD-R4-001 — task technical plan
- PRD-R5-001 — Product Council task readiness
- PRD-R5-001 — task delivery checklist
- PRD-R5-001 — task design specification
- PRD-R5-001 — task product requirements
- PRD-R5-001 — task QA plan
- PRD-R5-001 — task technical plan
- PRD-R6-001 — Product Council task readiness
- PRD-R6-001 — task delivery checklist
- PRD-R6-001 — task design specification
- PRD-R6-001 — task product requirements
- PRD-R6-001 — task QA plan
- PRD-R6-001 — task technical plan
- PRD-R7-001 — Product Council task readiness
- PRD-R7-001 — task delivery checklist
- PRD-R7-001 — task design specification
- PRD-R7-001 — task product requirements
- PRD-R7-001 — task QA plan
- PRD-R7-001 — task technical plan
- PRD-R8-001 — Product Council task readiness
- PRD-R8-001 — task delivery checklist
- PRD-R8-001 — task design specification
- PRD-R8-001 — task product requirements
- PRD-R8-001 — task QA plan
- PRD-R8-001 — task technical plan
- PRD-R9-001 — Product Council task readiness
- PRD-R9-001 — task delivery checklist
- PRD-R9-001 — task design specification
- PRD-R9-001 — task product requirements
- PRD-R9-001 — task QA plan
- PRD-R9-001 — task technical plan
- QA-R8-001 — Product Council task readiness
- QA-R8-001 — task delivery checklist
- QA-R8-001 — task design specification
- QA-R8-001 — task product requirements
- QA-R8-001 — task QA plan
- QA-R8-001 — task technical plan
- QA-R9-001 — Product Council task readiness
- QA-R9-001 — task delivery checklist
- QA-R9-001 — task design specification
- QA-R9-001 — task product requirements
- QA-R9-001 — task QA plan
- QA-R9-001 — task technical plan
- REL-R0-001 — Product Council task readiness
- REL-R0-001 — task delivery checklist
- REL-R0-001 — task design specification
- REL-R0-001 — task product requirements
- REL-R0-001 — task QA plan
- REL-R0-001 — task technical plan
- REL-R1-001 — Product Council task readiness
- REL-R1-001 — task delivery checklist
- REL-R1-001 — task design specification
- REL-R1-001 — task product requirements
- REL-R1-001 — task QA plan
- REL-R1-001 — task technical plan
- REL-R2-001 — Product Council task readiness
- REL-R2-001 — task delivery checklist
- REL-R2-001 — task design specification
- REL-R2-001 — task product requirements
- REL-R2-001 — task QA plan
- REL-R2-001 — task technical plan
- REL-R3-001 — Product Council task readiness
- REL-R3-001 — task delivery checklist
- REL-R3-001 — task design specification
- REL-R3-001 — task product requirements
- REL-R3-001 — task QA plan
- REL-R3-001 — task technical plan
- REL-R4-001 — Product Council task readiness
- REL-R4-001 — task delivery checklist
- REL-R4-001 — task design specification
- REL-R4-001 — task product requirements
- REL-R4-001 — task QA plan
- REL-R4-001 — task technical plan
- REL-R5-001 — Product Council task readiness
- REL-R5-001 — task delivery checklist
- REL-R5-001 — task design specification
- REL-R5-001 — task product requirements
- REL-R5-001 — task QA plan
- REL-R5-001 — task technical plan
- REL-R6-001 — Product Council task readiness
- REL-R6-001 — task delivery checklist
- REL-R6-001 — task design specification
- REL-R6-001 — task product requirements
- REL-R6-001 — task QA plan
- REL-R6-001 — task technical plan
- REL-R7-001 — Product Council task readiness
- REL-R7-001 — task delivery checklist
- REL-R7-001 — task design specification
- REL-R7-001 — task product requirements
- REL-R7-001 — task QA plan
- REL-R7-001 — task technical plan
- REL-R8-001 — Product Council task readiness
- REL-R8-001 — task delivery checklist
- REL-R8-001 — task design specification
- REL-R8-001 — task product requirements
- REL-R8-001 — task QA plan
- REL-R8-001 — task technical plan
- REL-R9-001 — Product Council task readiness
- REL-R9-001 — task delivery checklist
- REL-R9-001 — task design specification
- REL-R9-001 — task product requirements
- REL-R9-001 — task QA plan
- REL-R9-001 — task technical plan
- REL-R10-001 — Product Council task readiness
- REL-R10-001 — task delivery checklist
- REL-R10-001 — task design specification
- REL-R10-001 — task product requirements
- REL-R10-001 — task QA plan
- REL-R10-001 — task technical plan
- SPK-R0-001 — Product Council task readiness
- SPK-R0-001 — task delivery checklist
- SPK-R0-001 — task design specification
- SPK-R0-001 — task product requirements
- SPK-R0-001 — task QA plan
- SPK-R0-001 — task technical plan
- SPK-R5-001 — Product Council task readiness
- SPK-R5-001 — task delivery checklist
- SPK-R5-001 — task design specification
- SPK-R5-001 — task product requirements
- SPK-R5-001 — task QA plan
- SPK-R5-001 — task technical plan
- UX-R0-001 — Product Council task readiness
- UX-R0-001 — task delivery checklist
- UX-R0-001 — task design specification
- UX-R0-001 — task product requirements
- UX-R0-001 — task QA plan
- UX-R0-001 — task technical plan
- UX-R1-001 — Product Council task readiness
- UX-R1-001 — task delivery checklist
- UX-R1-001 — task design specification
- UX-R1-001 — task product requirements
- UX-R1-001 — task QA plan
- UX-R1-001 — task technical plan
- UX-R2-001 — Product Council task readiness
- UX-R2-001 — task delivery checklist
- UX-R2-001 — task design specification
- UX-R2-001 — task product requirements
- UX-R2-001 — task QA plan
- UX-R2-001 — task technical plan
- UX-R3-001 — Product Council task readiness
- UX-R3-001 — task delivery checklist
- UX-R3-001 — task design specification
- UX-R3-001 — task product requirements
- UX-R3-001 — task QA plan
- UX-R3-001 — task technical plan
- UX-R4-001 — Product Council task readiness
- UX-R4-001 — task delivery checklist
- UX-R4-001 — task design specification
- UX-R4-001 — task product requirements
- UX-R4-001 — task QA plan
- UX-R4-001 — task technical plan
- UX-R5-001 — Product Council task readiness
- UX-R5-001 — task delivery checklist
- UX-R5-001 — task design specification
- UX-R5-001 — task product requirements
- UX-R5-001 — task QA plan
- UX-R5-001 — task technical plan
- UX-R6-001 — Product Council task readiness
- UX-R6-001 — task delivery checklist
- UX-R6-001 — task design specification
- UX-R6-001 — task product requirements
- UX-R6-001 — task QA plan
- UX-R6-001 — task technical plan
- UX-R7-001 — Product Council task readiness
- UX-R7-001 — task delivery checklist
- UX-R7-001 — task design specification
- UX-R7-001 — task product requirements
- UX-R7-001 — task QA plan
- UX-R7-001 — task technical plan
- Life in Days — document index
- Life in Days
- Life in Days - Running Log
- Publication provenance
- Pull-Request-Template
- Life in Days
- Security and privacy reporting