UX-R1-001 — task product requirements

  • Task ID: UX-R1-001
  • Artifact kind: product
  • Artifact state: draft
  • Roadmap status: Backlog
  • Milestone: R1
  • Execution allowed: false
  • Evidence boundary: Creation of this draft does not approve implementation, deployment, testing, restore, release, or production use.

Parent product source

Task outcome

Finalize Calendar, Journal Day, upload, empty/loading/error, responsive, theme, and accessibility states.

This artifact narrows the parent release contract to UX-R1-001. It does not expand the release, change source precedence, or make a shared parent document task approval.

Scope and traceability

  • Task type: Design
  • Owner role: UI/UX Designer
  • Requirement IDs: LID-SCP-002, LID-SCP-003, LID-UP-001, LID-UP-003, LID-REF-001, LID-REF-004, LID-REF-005, LID-REF-006
  • Dependencies: PRD-R1-001
  • Deferred requirements excluded: LID-UP-004, LID-DEF-001, LID-DEF-002, LID-DEF-003, LID-DEF-004, LID-DEF-005, LID-DEF-006

Product acceptance scenarios

  1. UX-R1-001-P-001 — Outcome: the task produces exactly the outcome above and the result is reviewable without implying a later task or release is complete.
  2. UX-R1-001-P-002 — Boundary: every mapped requirement is addressed, every deferred requirement stays absent, and no authentic/private/human-only act is inferred from synthetic or public evidence.
  3. UX-R1-001-P-003 — Evidence: the task's named acceptance evidence is retrievable, task-bound, independently reviewable, and no broader than the supported claim.

Required acceptance evidence

Approved task-specific design for UX-R1-001 — Calendar/Day/Upload Designs links complete normal/empty/loading/error/interruption/destructive states, responsive behavior, accessibility annotations, prototype dispositions, and Designer sign-off.

Product metric

Primary task metric: all mapped requirement outcomes and the three task scenarios have retrievable pass/fail evidence, with zero unresolved scope or product decision.

Non-goals

  • Do not implement work owned by a dependent or later task.
  • Do not admit authentic content without its named owner gate.
  • Do not treat a prototype, document, code path, CI result, deployment, or backup upload as release acceptance.
  • Do not add the seven deferred requirements.

Owner actions

  • R1-OA-001 — see the Owner Action Ledger

These are relevant future gates, not a request for secrets or owner action during local task-artifact authoring. Their due/satisfied state is recorded separately in the readiness register.

Open product decisions

  • Five-seat task-level Product approval is pending.
  • Acceptance scenarios must be confirmed against the exact stable candidate before this artifact can become approved.

Product Manager disposition

Draft / Hold. The parent PRD/PID is a planning input. Substantive execution is not permitted until this exact task artifact and the complete dossier pass council review.

Life in Days

Home

Product, experience, architecture, and delivery

Discovery and research

Governance and council

Prototype handoffs

Prototype run guides

Prototype councils

QA and audits

Repository and project record

Evidence and maintenance

Clone this wiki locally