This is the single navigation point for the Life in Days product, design, architecture, delivery, research, and governance documents.

Current status: The Phase 1 Product Council planning package is complete as documentation, with 58 work packages across P0 and R0–R10. The R0 shared-host spike remains In progress because sanitized live-host evidence is still outstanding. Historical G0/G1 documents remain provenance; they do not supersede the direct Phase 1 instruction, governing PRD, or current council decision record. No implementation, credential collection, paid evaluation, provider configuration, infrastructure mutation, deployment, recovery exercise, or production verification is implied by these documents.

Phase 1 delivery baseline

Document Purpose Current role
Product Council Decision Record Reconciles Product, UX, Architecture, and Project decisions, including P0/R0–R10, evidence gates, and the shared-host baseline. Current Phase 1 council authority beneath the global PRD and direct owner instructions.
Phase 1 Release Plan Detailed 58-task schedule with milestones, dates, descriptions, requirements, PRD/PID links, design links, ownership, and status rules. Project Manager-owned delivery plan.
Phase 1 Roadmap Manifest Machine-readable source for the Markdown plan, workbook, repository issues, and live GitHub Project. Canonical task/status/date/link source.
GitHub Project Sync Runbook Dry-run-first repository issue and Project V2 synchronization contract, schema, commands, recovery, and UI-only completion steps. Operational publication guide; live verification is recorded separately from planning claims.
Phase 1 Excel Release Plan Seven-sheet review workbook with summary charts, release plan, 58 tasks, weekly timeline, requirement map, and risks/gates. Review artifact generated from the manifest.
Product Manager Review Product framing, release decomposition, 78-requirement assignment, outcomes, risks, and task seed. Specialist council recommendation reconciled by the decision record.
UX Design Review v5 inspection, screenshots, design gaps, accessibility/privacy gates, and design traceability for all 58 tasks. Specialist design evidence; prototype intent does not prove implementation.
Project Manager Review Critical path, lane policy, Definition of Ready/Done, RAID, cadence, and GitHub operating model. Delivery-control baseline.
Phase 1 Implementation Plan Detailed architecture, domain, security, deployment, recovery, test, rollback, and work-package implementation guidance. Technical planning authority; no deployed behavior implied.
Hetzner Shared-host Deployment Spike First-party research, coexistence topology, SQLCipher/SQLite proof gates, PostgreSQL fallback, and live preflight plan. Research/design complete; live capacity and coexistence proof remains outstanding.
GitHub Projects Roadmap Research Deep current-capability research on Roadmap layouts, views, fields, automation, APIs, limits, and GitHub's public roadmap. Historical research snapshot that informed the current Project model.
GitHub Roadmap Design Spike Reversible eight-item pilot design, field taxonomy, view recipes, evidence policy, and operating rules. Historical pilot design; the 58-task manifest now governs execution.
Shared-host Runbook Sanitized commands, stop conditions, deployment, backup/restore, observation, and rollback sequence. Execution guide; not evidence that commands have run.
Release PRDs and conditional PID R0–R9 release-specific requirements plus date-free R10 transition definition. Drafted planning artifacts; owner approval remains a future gate.
Life Reflection GitHub Project Status and date visualization of all manifest work packages. Live control surface; documents and issue evidence remain authoritative.

Start here

Document Purpose Current role
Proposed Shared Understanding Historical concise statement of the product promise, MVP boundary, capture model, AI/privacy rules, recovery direction, and deferrals. Discovery provenance; the governing PRD and current Phase 1 decision record control the release plan.
Product Requirements Document Complete product contract with 78 prioritized requirements, acceptance behavior, data handling, risks, and non-goals. Council-approved G0 planning baseline.
UX Specification Information architecture, screens, flows, states, content language, responsive behavior, accessibility, and validation plan. Council-approved G0 planning baseline; no usability testing claimed.
Project Tracker Historical G0–G9 gates, 12 milestones, 23 epics, 211 detailed tasks, dependencies, evidence, risks, decisions, and backlog. Detailed historical task inventory; Phase 1 execution/status is governed by the 58-task manifest.
Implementation Plan Earlier proposed architecture, domain model, integrations, jobs, security, storage, backup, testing, deployment, rollback, and technical gates. Preserved planning baseline; the Phase 1 implementation plan is current for delivery.
Requirements Traceability Maps each of the 78 PRD requirements to UX coverage, tracker tasks, architecture sections, and planned evidence. Planning coverage is complete; code and executed evidence remain future work.
Product Council Review Records specialist reviews, resolved findings, validation results, approvals, and G0 disposition. Evidence that the integrated planning baseline passed council review.

Product governance and council

Document What it contains
Product Council Charter Council mandate, membership, source precedence, decision rights, review workflow, G0–G9 gates, RACI, and change control.
Council Review Final G0 review record and the material contradictions resolved during reconciliation.
Phase 1 Product Council Charter Current council membership, decision rights, evidence boundary, release gates, and four-lane roadmap contract.
Phase 1 Council Decision Record Final reconciliation of the four specialist seats for P0 and R0–R10.
Product Manager Review Product outcome, decomposition, requirement mapping, risks, and 58-task seed.
UX Design Review v5 evidence, design gaps, screenshots, veto gates, and 58-task design traceability.
Project Manager Review Critical path, status policy, readiness/completion rules, RAID, and GitHub operating model.
Senior Product Manager Charter Product role mission, owned outputs, responsibilities, decision rights, review checklist, and guardrails.
UI/UX Design Lead Charter Design role mission, owned outputs, responsibilities, decision rights, review checklist, and guardrails.
Project Manager Charter Delivery-governance role mission, owned outputs, responsibilities, decision rights, review checklist, and guardrails.
Technical Architect Charter Architecture role mission, owned outputs, responsibilities, decision rights, review checklist, and guardrails.

Product, experience, architecture, and delivery

Discipline Primary document Use it for
Product Product Requirements Document Product scope, user stories, exact behavior, acceptance criteria, priorities, non-goals, data handling, and risks.
Experience UX Specification Navigation, page anatomy, interaction rules, empty/error/conflict states, responsive design, accessibility, and content language.
Architecture Phase 1 Implementation Plan Current technical shape, persistence, integrations, security/privacy enforcement, AI orchestration, shared-host deployment, storage, operations, tests, and rollback.
Delivery Phase 1 Release Plan P0/R0–R10 milestones, 58 work packages, dates, owners, dependencies, statuses, evidence requirements, and GitHub contract.
Coverage Requirements Traceability Requirement-by-requirement navigation across Product, UX, Architecture, Delivery, and planned verification.

Active design exploration

Document Purpose
Calendar UI prototype Throwaway, simulated comparison of three calendar and Journal Day layout directions on prototype/calendar-ui-directions; no production behavior is implied.
Calendar UI prototype v2 Versioned Margin Companion revision of Archive Desk, Living Mosaic, and Monthly Almanac on prototype/calendar-ui-v2-margin-companion.
Calendar UI v2 design QA Selected-reference comparison, captured v2 image set, interaction checks, responsive checks, and the bounded prototype QA result.
Unified Calendar and Almanac prototype v3 Selected single direction combining Living Mosaic as the default Calendar with a collapsible Monthly Almanac reading view on prototype/calendar-ui-v3-unified.
Calendar UI v3 prototype guide Local run instructions, routes, screen inventory, responsive behavior, interactions, and prototype boundaries.
Calendar UI v3 design QA Side-by-side design comparison, desktop/mobile interaction checks, accessibility review, fixes, and bounded QA result.
Museum Margin Calendar prototype v4 Approved revision with an image-only default Calendar and source provenance revealed in a selected-day right margin on prototype/calendar-ui-v4-museum-margin.
Calendar UI v4 prototype guide Local run instructions, two-state URL model, image-only tile contract, responsive behavior, and prototype boundaries.
Calendar UI v4 design QA Approved-reference comparisons, primary interaction checks, responsive sheet evidence, and bounded QA result.
Private Settings and compact privacy prototype v5 Source-grounded Settings suite and a subtle Journal Day privacy entry point on prototype/calendar-ui-v5-settings.
Calendar UI v5 prototype guide Local routes, Settings screen inventory, responsive model, truthful simulated states, and prototype boundaries.
Calendar UI v5 design QA Same-input privacy-density comparison, Settings screen review, interaction checks, responsive evidence, and bounded QA result.
Prototype v5 PRD feature audit Product, design, and technical audit of all 78 PRD requirements, including missing/partial/placeholder coverage, current-run screenshots, and the recommended v6 completeness sequence.
Prototype completeness tracker QA-gated v6–v35 remediation program mapping every prototype-representable v5 audit gap to one stable version while keeping backend proof outside prototype claims.
Private Search prototype v6 First remediation slice: page-memory-only Search terms, legacy q removal, and an honest no-suggestions initial state on prototype/calendar-ui-v6-private-search.
Calendar UI v6 prototype guide Local run instructions, privacy behavior, deliberate Search limits, responsive intent, and evidence boundaries.
Calendar contract prototype v7 Second remediation slice: private-content-free month/year navigation, external Calendar state rings, progressive provenance, and cross-month keyboard behavior on prototype/calendar-ui-v7-calendar-contract.
Calendar UI v7 prototype guide Local routes, Calendar/chooser interaction contract, frozen v6 Search regression, responsive behavior, and evidence boundaries.
Calendar UI v7 design QA Independent chooser, Calendar-state, history/focus, responsive, motion, URL, console, and v6 Search-regression pass on the final v7 hashes.
Cross-month Almanac prototype v8 Third remediation slice: deterministic cross-month reading, one-month pagination, safe range state, Almanac index, jump, and canonical Journal Day return.
Calendar UI v8 prototype guide Local routes, Cross-month Almanac interaction contract, inherited regressions, and prototype evidence boundaries.
Cross-month Almanac v8 council Product, Design, and Project reconciliation for PVA-003.
Cross-month Almanac v8 independent QA Exact artifact fingerprints, full interaction/responsive regression matrix, resolved findings, Pass verdict, and evidence boundary.
First-use Readiness prototype v9 Fourth remediation slice: empty Calendar plus independent VoiceNotes, Telegram, AI, Backup, and always-blocked Recovery Ceremony readiness.
Calendar UI v9 prototype guide Local routes, truthful readiness fixtures, inherited regressions, and evidence boundaries.
First-use Readiness v9 council Product, Design, and Project reconciliation for PVA-004.
First-use Readiness v9 independent QA Exact artifact fingerprints, current-run interaction/responsive regression matrix, resolved findings, Pass verdict, and evidence boundary.
Resilient Application Shell prototype v10 Fifth remediation slice: coordinated loading, failure, interruption, unsaved-work, session, and guarded-retry states.
Calendar UI v10 prototype guide Local run instructions, shell-state contract, deliberate limits, and review artifacts.
Resilient Application Shell v10 council Approved Product, Design, and Project contract for PVA-005.
Resilient Application Shell v10 independent QA Exact six-file fingerprint, current-run shell-state and regression matrix, Pass verdict, and evidence boundary.

Discovery and research record

These documents preserve how the current planning baseline was reached. Later confirmed decisions take precedence over earlier proposals.

Document What it contains Interpretation
Initial Brief Original product request and inspiration links. Historical input; later decisions supersede conflicts.
Detailed Discovery Requirements The requirements interview record and decisions 1–65. Canonical detailed discovery decisions beneath Arun's direct corrections.
Product and Integration Research Research on inspiration products, VoiceNotes, Telegram, hosting, authentication, privacy, backup, and integrations. Evidence base; distinguishes documented facts, observations, proposals, and unknowns.
Proposed Shared Understanding Concise synthesis of the intended MVP. Historical discovery artifact; not the current Phase 1 execution blocker.
AI Text Model Evaluation Candidate comparison, privacy/cost analysis, synthetic test protocol, hard gates, and production contract for text AI. Evaluation design only; no model is selected or qualified yet.
AI Artwork Model Evaluation Candidate comparison, blind visual evaluation, privacy/cost controls, hard gates, and artwork configuration contract. Evaluation design only; no model is selected or qualified yet.
Media Storage Evaluation Cost, privacy, operational, backup, and migration comparison for local disk, R2, B2, and Hetzner alternatives. Planning recommendation; provisioning and migration remain gated.
Worktree Provenance Repository, branch, base, worktree, and isolation provenance for discovery work. Historical Git provenance.

Domain language and repository entry points

Document What it contains
Domain Language Canonical terms such as Journal Day, Journal Date, Source Item, Daily Photo, Original Timestamp, Correction, and Derived Artifact.
Repository README Short project status, primary artifact links, and discovery entry points.
Publication Provenance Scope of the clean public snapshot, intentional metadata exclusions, and the boundary between publication and product deployment.
Security and Privacy Reporting Private vulnerability-reporting path and rules for sensitive content.
Contributing Synthetic-data, status-language, documentation, and frozen-prototype contribution rules.

Recommended reading paths

To approve the product understanding

  1. Proposed Shared Understanding
  2. Detailed Discovery Requirements, when a statement needs its full decision history
  3. Product Requirements Document, for the complete product contract

To design or review the experience

  1. Product Requirements Document
  2. Domain Language
  3. UX Specification
  4. Requirements Traceability

To prepare Phase 1 implementation after the named gates

  1. Product Requirements Document
  2. Phase 1 Council Decision Record
  3. The applicable release PRD/PID
  4. UX Design Review and release-specific design evidence
  5. Phase 1 Implementation Plan
  6. Phase 1 Release Plan and Roadmap Manifest
  7. Hetzner Shared-host Deployment Spike and Runbook for R0

To understand evidence and governance

  1. Phase 1 Product Council Charter
  2. Phase 1 Council Decision Record
  3. Project Manager Review
  4. Phase 1 Release Plan
  5. Requirements Traceability

Source precedence

When documents disagree, use this order:

  1. Arun's direct decisions and corrections.
  2. The Product Requirements Document for product behavior and stable requirement IDs.
  3. The UX Specification for interaction behavior, subject to direct corrections and the PRD.
  4. The Phase 1 Council Decision Record for release decomposition and planning decisions that do not alter the PRD.
  5. The applicable release PRD/PID, Phase 1 Implementation Plan, and Phase 1 Roadmap Manifest within their disciplines.
  6. The Detailed Discovery Requirements, Domain Language, discovery research, and historical G0/G1 council artifacts as provenance.

Do not silently resolve a remaining conflict by choosing the more convenient document. Record it through the Phase 1 Council Decision Record and affected manifest task.

Life in Days

Home

Product, experience, architecture, and delivery

Discovery and research

Governance and council

Prototype handoffs

Prototype run guides

Prototype councils

QA and audits

Repository and project record

Evidence and maintenance

Clone this wiki locally