Prototype Completeness Tracker
Canonical source:
docs/project/PROTOTYPE-COMPLETENESS-TRACKER.md· Snapshot commit:0694e7ad548d
- Created: 2026-08-14
- Owner: Project Manager agent
- Product owner: Arun
-
Baseline: Prototype v5 at commit
00e5689; feature audit at commitf74455f -
Current state: v10 Resilient Application Shell is frozen at implementation/evidence commit
ffabe0dwith freeze record497c98d; v11 Needs Date Review is released but remainsQueuedwith every gate— - Goal: Close every prototype-representable gap in the v5 feature audit through immutable, consecutively numbered prototype versions, with Product, UX, council, implementation, and independent QA evidence for every version.
This tracker governs the prototype-completeness loop only. It does not authorize or prove backend implementation, provider qualification, integration behavior, security controls, persistence, deployment, backup, restoration, or production readiness. The PRD and UX specification remain authoritative for behavior. When this tracker differs from those sources or a direct decision from Arun, the higher-authority source wins and the discrepancy must be recorded in the iteration ledger.
The prototype-completeness goal is complete only when all of the following are true:
- All 57 prototype-representable requirements classified
Partial,Placeholder, orMissingin the v5 audit have passed the package gate assigned below. - Each stable feature has produced one new immutable prototype version, in order from v6 through v35. No version number is skipped, reused, or overwritten. A failed QA result is repaired within the same unfrozen candidate; it does not consume another version.
- For every version, Product has translated the cited PRD and UX contracts into explicit acceptance scenarios; UX has supplied the required state and interaction contract; the three-role council has approved the slice before it is frozen; implementation evidence exists; and a newly assigned independent QA agent has recorded a pass.
- All 12 Outside UI requirements remain clearly separated from prototype evidence. The prototype may represent honest unverified, unavailable, failed, or blocked states, but no QA result may claim that the underlying integration, security, storage, or operational control works.
- The nine v5 requirements already classified
Fullremain intact, including all six deliberate MVP exclusions. - The last prototype passes a complete cross-version regression covering desktop and compact layouts, keyboard operation, focus, reduced motion, light/dark themes, URL/privacy invariants, no forbidden scope, and all required state families.
- The iteration ledger contains the evidence and disposition for every package, with no unresolved Critical or High prototype gap.
| Status | Meaning |
|---|---|
Queued |
Scope is mapped, but feature work has not started. |
PM in progress |
Product acceptance scenarios are being prepared. |
Design in progress |
UX states/interactions are being specified or reviewed. |
Council review |
PM, UX, and Project Manager are resolving the slice before implementation/freeze. |
Implementation in progress |
The new immutable prototype files are being created. |
QA in progress |
A fresh QA agent is verifying the built version. |
QA failed |
Evidence contradicts one or more acceptance scenarios; the same version remains open until repaired and rechecked. |
Complete |
Every gate below passed, evidence is linked, and the immutable version is frozen. |
Blocked |
A named product decision or dependency prevents safe progress. |
| Gate | Accountable role | Exit evidence |
|---|---|---|
P — Product acceptance |
Product Manager agent | Requirement IDs, PRD/UX citations, included/excluded behaviors, normal/empty/loading/error/interruption/destructive scenarios, and observable pass criteria are written before implementation. |
D — Experience contract |
Expert UI/UX Designer agent | Screen inventory, hierarchy, responsive behavior, accessibility annotations, exact labels, focus/Back behavior, and state transitions are agreed. Synthetic content only. |
C — Council approval |
Product Manager + UI/UX Designer + Project Manager | Three-role review records Approved, or records an explicit decision needed from Arun. Convenience is never used to silently resolve a PRD conflict. |
I — Prototype implementation |
Implementing agent | For v11 and later, new P0-index-vN.html, P0-app-vN.js, P0-styles-vN.css, P0-README-vN.md, P0-prefixed prototype note, and P0-prefixed current-run screenshots exist. Frozen v6–v10 names remain grandfathered and unchanged. Interactions change representative domain state rather than ending in a generic toast where the requirement demands a decision. |
Q — Independent QA |
Newly assigned QA agent | Current-run route/interaction checks, visual inspection, console/syntax checks, responsive/a11y checks proportional to the slice, regression of inherited behavior, scope-boundary check, and a written verdict. A developer self-check is insufficient. |
F — Freeze and handoff |
Project Manager agent | QA is Pass, evidence paths and commit are recorded, this tracker is updated, and only then does the next version move from Queued. |
Gate notation in the registers is — (not started), IP (in progress), A (approved/passed), F (failed), or B (blocked).
These decisions reconcile older written specification language with Arun's later direct prototype decisions. They govern prototype work while the PRD and UX specification await corresponding editorial amendments.
| Decision | Disposition | Consequence for prototype work |
|---|---|---|
| C-01 — Calendar labels | Approved | Follow Arun's later approved direction: Calendar image tiles contain the image without source-type or AI chips. Source, AI, and attention details appear after selection in the Museum Margin/right-side detail and in the accessible name. Today, selected, and keyboard focus use distinct non-overlay cell outlines. This supersedes the persistent-overlay portions of UX-CAL-05, UX-CAL-08, and contextual wording in LID-AIA-005; it does not weaken provenance or accessibility. |
| C-02 — Timeline versus Almanac | Approved | Keep the user-facing name and visual direction Monthly Almanac, and extend it into cross-month chronological browsing that fulfills LID-REF-002. Do not add a competing Timeline tab. The intended terminology amendment is “Almanac, the chronological timeline experience.” |
| C-03 — Navigation | Approved | Preserve the approved Calendar/Almanac switcher near Search and the collapsible local Almanac index. Treat the older persistent-left-rail wording as superseded. Management remains under Settings/More. |
| C-04 — Unresolved technical gates | Approved | Represent future, unavailable, failed, and unverified states using synthetic fixtures labeled as prototype data. Do not select a real AI model or claim a connected VoiceNotes/Telegram integration, successful backup or restore, encryption implementation, storage migration, production authentication, deployment, or operational readiness. |
Each package contains one stable feature that can be designed, implemented, and independently verified as a coherent increment. Cross-cutting behavior may be touched again by later versions, but every audit-gap requirement has one primary closure version in Section 5.
| Version | Feature package and audit outcome | Primary audit gaps | Depends on | Status | P | D | C | I | Q | Required evidence when complete |
| --- | --- | --- | --- | --- | --- | :---: | :---: | :---: | :---: | :---: | --- |
| v6 | PVA-001 Private Search State — remove query reads/writes from URLs, browser history, title, and persistent storage; keep query only in live memory; replace suggested/recent memories with an honest deterministic-scope initial state. Full lexical coverage is deliberately not claimed here. | Audit gap 2, privacy defect only | v5 baseline | Complete | A | A | A | A | A | prototypes/calendar-ui/index-v6.html; app-v6.js; styles-v6.css; README-v6.md; docs/prototypes/CALENDAR-UI-PROTOTYPE-v6.md; design-qa-v6.md; docs/prototypes/v6/ |
| v7 | PVA-002 Calendar Contract Completion — immediate-commit 12-button month/year chooser and distinct external Today/selected/focus rings without image overlays; quiet empty days and progressive-disclosure provenance remain. | Audit gap 14; primary closure LID-REF-001; LID-REF-005/LID-SCP-004 regression only | frozen v6; C-01 | Complete | A | A | A | A | A | prototypes/calendar-ui/index-v7.html; app-v7.js; styles-v7.css; README-v7.md; ../prototypes/CALENDAR-UI-PROTOTYPE-v7.md; ../prototypes/v7/COUNCIL-v7.md; current-run captures in ../prototypes/v7/ |
| v8 | PVA-003 Cross-month Almanac — reverse-chronological month sections, deterministic one-calendar-month Load earlier, month/year jump, canonical Journal Day route/return, safe range state, stable focus, and hidden/Trash-only exclusion under the approved Almanac direction. | Audit gap 11; primary closure LID-REF-002; LID-REF-004/005/006 and LID-SCP-004 regression only | frozen v7; C-02, C-03 | Complete | A | A | A | A | A | ../../prototypes/calendar-ui/index-v8.html; ../../prototypes/calendar-ui/app-v8.js; ../../prototypes/calendar-ui/styles-v8.css; ../../prototypes/calendar-ui/styles-v8-almanac.css; ../../prototypes/calendar-ui/README-v8.md; ../prototypes/CALENDAR-UI-PROTOTYPE-v8.md; ../../design-qa-v8.md; ../prototypes/v8/COUNCIL-v8.md; current-run captures in ../prototypes/v8/ |
| v9 | PVA-004 First-use Readiness — empty Calendar and separate VoiceNotes, Telegram, AI, Backup, and Recovery Ceremony readiness without credential collection or false recovery claims. | Audit gap 3, first-use portion | frozen v8; C-04 | Complete | A | A | A | A | A | ../../prototypes/calendar-ui/index-v9.html; ../../prototypes/calendar-ui/app-v9.js; ../../prototypes/calendar-ui/styles-v9.css; ../../prototypes/calendar-ui/styles-v9-almanac.css; ../../prototypes/calendar-ui/styles-v9-readiness.css; ../../prototypes/calendar-ui/README-v9.md; ../prototypes/CALENDAR-UI-PROTOTYPE-v9.md; ../../design-qa-v9.md; ../prototypes/v9/COUNCIL-v9.md; current-run captures in ../prototypes/v9/ |
| v10 | PVA-005 Resilient Application Shell — loading, month/partial-media failure, connection interruption, unsaved Correction, session expiry, reauthentication, generic server failure, and idempotent safe retry. | Audit gap 3, interruption/failure portion; prototype closure LID-OPS-018 | frozen v9; C-04 | Complete | A | A | A | A | A | ../../prototypes/calendar-ui/index-v10.html; ../../prototypes/calendar-ui/app-v10.js; ../../prototypes/calendar-ui/styles-v10.css; ../../prototypes/calendar-ui/styles-v10-almanac.css; ../../prototypes/calendar-ui/styles-v10-readiness.css; ../../prototypes/calendar-ui/styles-v10-resilience.css; ../../prototypes/calendar-ui/README-v10.md; ../prototypes/CALENDAR-UI-PROTOTYPE-v10.md; ../../design-qa-v10.md; ../prototypes/v10/COUNCIL-v10.md; current-run captures in ../prototypes/v10/ |
| v11 | PVA-006 Needs Date Review — conditional queue/count, Telegram and VoiceNotes reasons, preserved input, immutable timestamp, no receipt-time guessing, past-only assignment preview, failure/success, and empty state. | Audit gap 1 | v10 | Queued | — | — | — | — | — | Standard v11 artifact set; date-review scenario matrix; docs/prototypes/v11/ |
| v12 | PVA-007 Telegram Capture Companion — clearly simulated bot/web states for guidance, authorization, formats/limits, albums/date captions, rejection, durable success/failure, review acknowledgement, and private handoff. | Audit gap 9, capture portion | v11; C-04 | Queued | — | — | — | — | — | Standard v12 artifact set; Telegram message/state fixture sheet; docs/prototypes/v12/ |
| v13 | PVA-008 Telegram Duplicate Handling — same-day Already imported/Add duplicate anyway, cross-day date-only warning/permit, shared Media Asset representation, caption retention, and cancel-without-creation. | Audit gap 9, duplicate portion | v12 | Queued | — | — | — | — | — | Standard v13 artifact set; duplicate outcome matrix; docs/prototypes/v13/ |
| v14 | PVA-009 Durable Manual Upload — deliberate global date choice, safe review, original/checksum identity, duplicate provenance, progress/interruption/failure/retry, durable success, and derived pending/stale result. | Audit gap 12 | v13 | Queued | — | — | — | — | — | Standard v14 artifact set; upload validation matrix; docs/prototypes/v14/ |
| v15 | PVA-010 Correction Editor — Source Item-only launch, read-only source/base revision, simulated author/time, unsaved warning, explicit Correction, removal without deleted history. | Audit gap 5, Correction portion | v14 | Queued | — | — | — | — | — | Standard v15 artifact set; Correction lifecycle evidence; docs/prototypes/v15/ |
| v16 | PVA-011 Source Conflict Resolution — accessible wide/stacked diff; exactly three substantive, distinct outcomes; unresolved Cancel; manual based-on-both workspace without auto-merge. | Audit gap 5, conflict portion | v15 | Queued | — | — | — | — | — | Standard v16 artifact set; three-action outcome evidence; docs/prototypes/v16/ |
| v17 | PVA-012 Atomic Redating — item-level current/destination dates and timestamp; old/new day, cover, visibility, stale/art-history preview; atomic failure/success and links. | Audit gap 5, redating portion | v16 | Queued | — | — | — | — | — | Standard v17 artifact set; redating before/after fixtures; docs/prototypes/v17/ |
| v18 | PVA-013 History and Provenance — global/day/item/field/art histories, typed events, separate source/derived lanes, upstream lifecycle, hidden historical day, and read-only inspection. | Audit gap 4, History portion | v17 | Queued | — | — | — | — | — | Standard v18 artifact set; history-event matrix; docs/prototypes/v18/ |
| v19 | PVA-014 Trash — recoverable item list/expiry, ordinary-view exclusion, restore, permanent delete, accurate backup language, and visibility/cover/stale preview. | Audit gap 4, Trash portion | v18 | Queued | — | — | — | — | — | Standard v19 artifact set; destructive-action QA; docs/prototypes/v19/ |
| v20 | PVA-015 Suppressions — separate Source/Artwork records, opaque identity, Allow re-import/Allow generation, restore behavior, and manual-art distinction. | Audit gap 4, Suppressions portion | v19 | Queued | — | — | — | — | — | Standard v20 artifact set; suppression lifecycle QA; docs/prototypes/v20/ |
| v21 | PVA-016 Complete Lexical Search — exact current text/date/tag/caption search, Include history off by default, why-matched provenance, current/revision/Trash labels, all search states, and destination focus. | Audit gap 2, capability portion; search part of gap 9 | v6, v18–v20 | Queued | — | — | — | — | — | Standard v21 artifact set; query/fixture matrix; docs/prototypes/v21/ |
| v22 | PVA-017 Generated-field Lifecycle Parity — independent title/summary/tags protection, stale suggestions, Use/Keep/Edit/Resume, 80–140-word summary, and 3–7 unique-tag validation. | Audit gap 7, field-lifecycle portion | v21 | Queued | — | — | — | — | — | Standard v22 artifact set; field-state matrix; docs/prototypes/v22/ |
| v23 | PVA-018 AI Text Processing States — quiet/final refresh, generating/source race/current/stale, refusal/schema/timeout/rate/provider/auth/quota/retry/exhausted states, and safe provenance. | Audit gap 7, processing portion | v22 | Queued | — | — | — | — | — | Standard v23 artifact set; text-attempt matrix; docs/prototypes/v23/ |
| v24 | PVA-019 System Health Foundation — factual integration/provider/job/backup placeholders and sanitized evidence using the approved health vocabulary; repeated-failure/recovery alerts without reminders. | Audit gap 4, Health foundation | v23; C-04 | Queued | — | — | — | — | — | Standard v24 artifact set; health vocabulary QA; docs/prototypes/v24/ |
| v25 | PVA-020 Provider Settings and Privacy — independent controls, evaluation-incomplete/synthetic-qualified fixtures, credentials, manual-only options, future-only confirmation, no fallback, cost/region/lifecycle/privacy metadata, and exact lanes. | Audit gaps 7, 8, and 10, provider/privacy portions | v24; C-04 | Queued | — | — | — | — | — | Standard v25 artifact set; provider/privacy matrix; docs/prototypes/v25/ |
| v26 | PVA-021 Artwork Request Confirmation — every request shows read-only brief, provider/configuration, credential, predicted cost and budget; sparse/disabled rules; brief regeneration sends no art request. | Audit gap 8, confirmation portion | v25 | Queued | — | — | — | — | — | Standard v26 artifact set; preflight walkthrough; docs/prototypes/v26/ |
| v27 | PVA-022 Artwork Failure and Budget States — distinct requested/generating/success/refusal/timeout/rate/credential/quota/invalid/budget states, no silent fallback, bounded handling, explicit Retry. | Audit gap 8, failure portion | v26 | Queued | — | — | — | — | — | Standard v27 artifact set; artwork-attempt matrix; docs/prototypes/v27/ |
| v28 | PVA-023 Artwork Version and Staleness — compare/select retained versions, active/historical/stale states, safe provenance, redated-source history, and labeled AI status in permitted contexts. | Audit gap 8, version portion | v27, v18 | Queued | — | — | — | — | — | Standard v28 artifact set; art-history QA; docs/prototypes/v28/ |
| v29 | PVA-024 Artwork Sweep and Suppression — 01:00 eligibility, missed-run repair, skip/failure reasons, no reminders, delete-all consequence, manual generation distinction, and Allow generation effect. | Audit gaps 8 and 4, sweep/suppression portion | v28, v20 | Queued | — | — | — | — | — | Standard v29 artifact set; sweep eligibility matrix; docs/prototypes/v29/ |
| v30 | PVA-025 Daily Photo Completeness — original/view/download, caption/timestamp/source, redating/reorder/cover/Trash, private image description, compression disclosure, pointer/button reorder, and modal focus return. | Audit gaps 9 and 13, photo-detail portion | v29 | Queued | — | — | — | — | — | Standard v30 artifact set; photo-control QA; docs/prototypes/v30/ |
| v31 | PVA-026 Storage Capacity and Migration — exact 7/8/9/10 GB media and 18/15/13/12 GB free thresholds, root/copy/target/failure/emergency states, and non-media continuity. | Audit gap 6, storage portion | v30; C-04 | Queued | — | — | — | — | — | Standard v31 artifact set; storage-threshold matrix; docs/prototypes/v31/ |
| v32 | PVA-027 Backup, Restore, and Recovery Ceremony — snapshot/check/sample/full-drill distinction, retention/due states, blocked three-step ceremony, and measured duration versus target. | Audit gaps 4 and 6, recovery portion | v31; C-04 | Queued | — | — | — | — | — | Standard v32 artifact set; recovery evidence-state QA; docs/prototypes/v32/ |
| v33 | PVA-028 Restorable Export — complete manifest, current/history/Trash/suppression separation, encrypted one-time-passphrase default, unencrypted warning, stages, ready/failed/expired/downloaded states, and lifecycle caveat. | Audit gap 4, Export portion | v32 | Queued | — | — | — | — | — | Standard v33 artifact set; export-state walkthrough; docs/prototypes/v33/ |
| v34 | PVA-029 Access and Security Boundary — unauthenticated/denied/MFA/session-expired/reauth states, no app password UI, accurate encryption/server-compromise/not-E2EE boundary, generic title and private/no-store intent. | Audit gap 10 | v33; C-04 | Queued | — | — | — | — | — | Standard v34 artifact set; access/security disclosure QA; docs/prototypes/v34/ |
| v35 | PVA-030 Responsive and Accessibility Closeout — 320/390 px, 200% text, 400% page zoom, browser/keyboard/screen-reader, modal focus, target sizes, 13 px metadata, contrast, non-color states, reduced motion, and final regression. | Audit gap 13 and cross-cutting acceptance | v34 and all prior QA | Queued | — | — | — | — | — | Standard v35 artifact set; complete closure audit; docs/prototypes/v35/ |
For v11 and later, “Standard vN artifact set” means a new immutable P0-index-vN.html, P0-app-vN.js, P0-styles-vN.css, P0-README-vN.md, docs/prototypes/P0-CALENDAR-UI-PROTOTYPE-vN.md, P0-design-qa-vN.md, and P0-prefixed current-run evidence in docs/prototypes/vN/. Frozen v6–v10 artifacts retain their existing names and hashes.
This is the exhaustive closure inventory derived from the audit's 38 Partial, seven Placeholder, and 12 Missing requirement rows. There are 57 rows; each has exactly one primary closure version. Open means the v5 audit gap remains unproved until that version passes all gates.
| Requirement | V5 status | Prototype gap that must be observable | Primary version | Status |
|---|---|---|---|---|
LID-SCP-001 |
Partial | Private single-user access, denied/session states, and no sharing/public routes | v34 | Open |
LID-SCP-002 |
Partial | Item-level redating with immutable Original Timestamp and correct day effects | v17 | Open |
LID-SCP-003 |
Partial | Navigable source/Correction/revision/derived separation and version provenance | v18 | Open |
LID-SCP-004 |
Partial | Removing/restoring the last live source hides/restores the day while history remains reachable | v19 | Open |
| Requirement | V5 status | Prototype gap that must be observable | Primary version | Status |
|---|---|---|---|---|
LID-TG-001 |
Partial | Valid/invalid private-chat authorization outcomes without exposing IDs/secrets | v12 | Open |
LID-TG-002 |
Missing | Compressed-photo versus original-quality image-document guidance | v12 | Open |
LID-TG-003 |
Missing | Accepted types/limits and specific rejection states with no false-import claim | v12 | Open |
LID-TG-004 |
Missing | Waiting/failure/durable acknowledgement and private change-date link states | v12 | Open |
LID-TG-005 |
Partial | Exact leading-date/caption grammar, albums, invalid formats, and backdating outcomes | v12 | Open |
LID-TG-006 |
Missing | Preserved invalid/future-date item entering and leaving Needs Date Review | v11 | Open |
LID-TG-007 |
Partial | Gallery and deterministic real-cover results after duplicate, redating, Trash, and restore transitions | v30 | Open |
LID-TG-008 |
Missing | Global checksum: same-day Already imported/Add duplicate anyway and cross-day warn/permit | v13 | Open |
LID-TG-009 |
Partial | Photo Caption is visible, searchable, match-identified, and explicitly excluded from AI | v21 | Open |
| Requirement | V5 status | Prototype gap that must be observable | Primary version | Status |
|---|---|---|---|---|
LID-VN-004 |
Missing | Missing/untrusted creation timestamp goes to Needs Date Review without receipt-time invention | v11 | Open |
LID-VN-006 |
Partial | Upstream revised/untagged/deleted lifecycle, retained revisions, and conflict state | v18 | Open |
LID-VN-007 |
Placeholder | Source Suppression lifecycle, restore behavior, permanent opaque identity, and Allow re-import | v20 | Open |
| Requirement | V5 status | Prototype gap that must be observable | Primary version | Status |
|---|---|---|---|---|
LID-UP-001 |
Partial | Explicit global date choice, metadata/review, progress, interruption, retry, and durable success | v14 | Open |
LID-UP-002 |
Partial | Original bytes/checksum identity, source title/provenance, and restoration/export representation | v14 | Open |
LID-UP-003 |
Partial | Checksum-based duplicate decision, distinct Add anyway result, concurrency/idempotency explanation | v14 | Open |
LID-SRC-001 |
Partial | Correction editor bound to immutable source revision with author/time/history/removal | v15 | Open |
LID-SRC-002 |
Partial | Accessible complete diff and three materially different no-auto-merge resolutions | v16 | Open |
LID-SRC-003 |
Placeholder | Atomic item redating preview, success/failure, old/new day links, unchanged Original Timestamp | v17 | Open |
LID-SRC-004 |
Partial | Exact source-set binding, stale/invalidated results, and historical preservation after redating | v17 | Open |
| Requirement | V5 status | Prototype gap that must be observable | Primary version | Status |
|---|---|---|---|---|
LID-REF-001 |
Partial | Month/year chooser plus council-resolved Today/attention/AI-cover status equivalence | v7 | Complete |
LID-REF-002 |
Partial | Approved cross-month chronological browsing, jump/load controls, and same Journal Day routing | v8 | Complete |
LID-REF-003 |
Partial | Private lexical/date/exact-tag/caption search, match reasons, Include history, and full state family | v21 | Open |
LID-REF-004 |
Partial | Journal Day exposes functioning history/provenance and exceptional management states | v18 | Open |
LID-REF-005 |
Partial | Measured theme/contrast/type/motion behavior without essential metadata below token floor | v35 | Open |
LID-REF-006 |
Partial | Private image descriptions, focus contract, compact/zoom/keyboard/screen-reader/contrast evidence | v35 | Open |
LID-REF-007 |
Partial | Functioning Correction, redating, deletion/restoration, suppression, export, and provider actions | v33 | Open |
| Requirement | V5 status | Prototype gap that must be observable | Primary version | Status |
|---|---|---|---|---|
LID-AIT-002 |
Partial | Qualified-option metadata shape, confirmation, future-only change, health/retry, and no silent fallback | v25 | Open |
LID-AIT-003 |
Partial | Valid title, factual 80–140-word summary, 3–7 unique tags, Visual Brief, partial/invalid handling | v22 | Open |
LID-AIT-004 |
Partial | Quiet-period waiting, late-source reset, 01:00 final refresh, race/stale completion outcomes | v23 | Open |
LID-AIT-005 |
Partial | Independent title/summary/tag protect, stale suggestion, accept/keep/edit/resume behaviors | v22 | Open |
LID-AIT-006 |
Partial | Clear lane/provider/retention/configuration boundary with no photo/caption input or fallback claim | v25 | Open |
LID-AIT-007 |
Missing | Pending/timeout/rate-limit/provider/quota/refusal/source-race/retry/exhausted and safe attempt provenance | v23 | Open |
| Requirement | V5 status | Prototype gap that must be observable | Primary version | Status |
|---|---|---|---|---|
LID-AIA-002 |
Partial | Read-only brief history, source binding, Regenerate brief separated from Retry artwork | v26 | Open |
LID-AIA-003 |
Partial | Manual preflight shows brief, provider/model, cost/budget, credential state, sparse warning | v26 | Open |
LID-AIA-004 |
Partial | 01:00 eligibility/skips/failures/restart-repair evidence and no reminder behavior | v29 | Open |
LID-AIA-005 |
Partial | Persistent non-photorealistic AI label and provenance across day/history/export representations | v28 | Open |
LID-AIA-006 |
Missing | Neutral safety-refusal state with explicit Regenerate brief then Retry and no silent provider switch | v27 | Open |
LID-AIA-007 |
Partial | Version compare/select, active/historical state, trigger/provider/brief/source/cost provenance | v28 | Open |
LID-AIA-009 |
Placeholder | Move-all-art consequence, Artwork Suppression, Allow generation, and separate regeneration action | v29 | Open |
LID-AIA-010 |
Partial | Stale artwork remains labeled, source bindings visible, redating removes invalid active art to history | v28 | Open |
LID-AIA-011 |
Partial | Typed approved-option shape, health/cost/lifecycle/sweep eligibility and no free-form model entry | v25 | Open |
| Requirement | V5 status | Prototype gap that must be observable | Primary version | Status |
|---|---|---|---|---|
LID-OPS-001 |
Missing | Unauthenticated, denied, MFA, seven-day session expiry, and reauthentication return states | v34 | Open |
LID-OPS-003 |
Partial | Accurate secret/rotation/credential-state disclosure with no identifiers or values in browser fixtures | v34 | Open |
LID-OPS-004 |
Missing | Application-controlled at-rest encryption, off-server recovery material, server-compromise, not-E2EE limits | v34 | Open |
LID-OPS-006 |
Missing | Exact media/free-space watermarks, migration states, and emergency media rejection without deletion/downsampling | v31 | Open |
LID-OPS-010 |
Placeholder | Trash expiry, restore, permanent-delete confirmation, and visibility/cover consequence preview | v19 | Open |
LID-OPS-011 |
Placeholder | Snapshot, repository check, sample restore, full recovery, retention, and truthful evidence separation | v32 | Open |
LID-OPS-012 |
Missing | Three-part Recovery Ceremony and launch-blocked/completed result without exposing key details | v32 | Open |
LID-OPS-013 |
Placeholder | Complete export manifest, encryption choice/passphrase, progress/failure, checksum, expiry, removal | v33 | Open |
LID-OPS-014 |
Placeholder | First-class System Health with required status vocabulary and durable evidence cards | v24 | Open |
LID-OPS-015 |
Partial | Immediate private health state versus repeated-failure/recovery Telegram alerts; no habit reminders | v24 | Open |
LID-OPS-017 |
Partial | Current/predicted/reconciled spend, 80% warning, hard block, allocation, and rollover states | v25 | Open |
LID-OPS-018 |
Partial | Dependency-scoped safe outage actions and authentic-content availability across failures | v10 | Complete at frontend-prototype level |
These 12 audit rows are not prototype-completeness items. Prototype versions may display truthful pending/failed/never-verified states, but their status here remains Requires external evidence until the separately governed implementation/evaluation work is executed. They must never be counted as passed because a screen exists.
| Requirement | Evidence needed outside the prototype | Related truthful UI package |
|---|---|---|
LID-TG-010 |
Exact Original preservation and local metadata-free derivative tests | v12, v30 |
LID-VN-001 |
Synthetic VoiceNotes integration-spike result | v9, v24 |
LID-VN-002 |
Webhook/MCP authority, retrieval, authentication, and idempotency evidence | v9, v24 |
LID-VN-005 |
Replay-safe complete reconciliation and partial-enumeration tests | v18, v24 |
LID-AIT-001 |
Approved text-model evaluation and signed qualification | v25 |
LID-AIA-001 |
Blind artwork evaluation and signed qualification | v25 |
LID-OPS-002 |
Callback host/path isolation, rate limiting, and sanitized logging tests | v34 |
LID-OPS-005 |
Bounded memory staging, constrained decoder, swap refusal, and cleanup tests | v12, v31 |
LID-OPS-007 |
Storage abstraction plus R2 migration/reconciliation/rollback proof | v31 |
LID-OPS-008 |
Authenticated decrypt/private-cache deployment evidence | v6, v30, v34 |
LID-OPS-009 |
Media-reference counting and last-reference physical deletion tests | v13, v19, v31 |
LID-OPS-016 |
Allowlists, log retention, and forbidden-content tests | v6, v24, v34 |
These nine rows were Full in the v5 audit. Every QA pass must regress the applicable guardrails; no later completeness work may reopen them accidentally.
| Requirement | Invariant to preserve |
|---|---|
LID-VN-003 |
Only exact life-in-days, prospective Integration Activation, and no historical auto-import |
LID-UP-004 |
No Word/PDF/photo journal ingestion and no blank browser journal composer |
LID-AIA-008 |
A real Daily Photo always wins Calendar Cover precedence |
LID-DEF-001 |
No automatic historic import |
LID-DEF-002 |
No coaching, reminders, prompts, streaks, reports, or habit mechanics |
LID-DEF-003 |
No semantic/conversational/AI search |
LID-DEF-004 |
No year mosaic, media wall, maps, native app, or offline-first feature |
LID-DEF-005 |
No PDF/Word/OCR/RAW ingestion or print-book claim |
LID-DEF-006 |
No fuzzy/additional VoiceNotes tag configuration |
Also regress: no sharing/public links/multi-user UI; no web photo upload; no AI access to real-photo bytes, thumbnails, metadata, identifiers, captions, or photo-derived descriptions; no hidden provider fallback; no unsupported production/deployment/recovery claim.
Copy this worksheet into the end of the iteration ledger when a version starts; complete it without removing older entries.
### YYYY-MM-DD — vN — <feature package> — started
- Product Manager: <agent>; P gate: IP
- UI/UX Designer: <agent>; D gate: IP
- Project Manager: <agent>; tracker owner
- Implementing agent: <agent>
- Independent QA agent: not assigned until implementation is ready
- PRD requirements: <IDs>
- UX contracts: <IDs/sections>
- Included scenarios: <normal, empty, loading, error, interruption, destructive, responsive>
- Explicit exclusions: <outside-UI evidence and deferred scope>
- Council decision: pending
- Prototype files: pending
- QA evidence: pending
- Commit: pending
- Disposition: open### YYYY-MM-DD — vN — <feature package> — QA disposition
- Council approval: <A/B plus decision link>
- Implementation evidence: <paths>
- QA agent: <new agent identity>
- Checks performed: <routes/interactions/viewports/a11y/regression>
- Findings: <none or issue IDs>
- QA verdict: <Pass/Fail>
- Commit: <hash, only when frozen>
- Next version released from queue: <vN+1 or none>Entries below are chronological evidence. Never edit, reorder, or delete an existing entry. Corrections are new entries that name what they supersede. Package status and gate cells in Sections 4 and 5 may be updated to summarize the latest ledger evidence.
- Baseline prototype:
prototypes/calendar-ui/index-v5.html,app-v5.js,styles-v5.css, andREADME-v5.md. - Baseline prototype commit:
00e5689(prototype: add private settings suite v5). - Audit: Prototype v5 feature audit at commit
f74455f. - Audit inventory: 78 PRD requirements = 9 Full, 38 Partial, 7 Placeholder, 12 Missing, and 12 Outside UI. The audit summary's early “10 missing” value is a numerical typo; the requirement matrix and arithmetic establish 12 Missing and therefore 57 prototype-representable gaps.
- Decision: v5 remains immutable. Completeness iterations begin at v6; no baseline behavior is called implemented, deployed, secure, persistent, or production-ready.
- Project Manager created this authoritative prototype-completeness tracker from the v5 audit, PRD, UX specification, existing prototype documentation, document index, and Git history.
- Version sequence established: v6 through v20, one immutable version per feature package.
- Every prototype-representable audit requirement has exactly one primary closure version; non-frontend evidence and inherited/deferred guardrails are tracked separately.
- First releasable package: v6 Private deterministic Search, pending Product, Design, and Council gates.
- Supersedes only the version sequence and first-package scope in the preceding
tracker initializedentry; the v5 baseline, 57-row closure inventory, evidence boundary, and mandatory gates remain in force. - Product Manager decomposed the audit into 30 stable features, one immutable version each, v6 through v35. This prevents broad packages from receiving narrow QA and makes dependencies explicit.
- Product Council adopted decisions C-01 through C-04: progressive-disclosure Calendar labels, cross-month Monthly Almanac as the chronological Timeline experience, approved switcher/navigation, and synthetic truthful states for unresolved technical gates.
- Complete lexical Search moved to v21 because current/history/Trash/Suppression semantics depend on v18 through v20. V6 is now strictly Private Search State.
- All 57 prototype-representable audit rows retain exactly one primary closure version under the reconciled roadmap. The 12 Outside UI requirements remain outside prototype proof.
- Product Manager agent:
/root/prototype_product_manager; P gate: A. - UI/UX Designer agent:
/root/prototype_ui_designer; D gate: A. - Project Manager agent:
/root/prototype_project_manager; tracker owner. - Implementing agent: root prototype agent; I gate: IP.
- Independent QA agent: to be newly assigned only after the v6 candidate and implementation evidence are ready; Q gate: —.
- Council review: C gate: A. The scope is dependency-safe, materially closes the urgent privacy defect, and does not falsely claim complete
LID-REF-003coverage. - Requirement slice: prototype portion of
LID-REF-003, with truthful UI states related toLID-OPS-008andLID-OPS-016. Deployment cache/log enforcement remains externally unverified. - Included acceptance: remove legacy
qfrom the current URL without preserving it in browser history; never serialize a new query into URL, page title, local/session storage, telemetry, or referrers; hold query only in live page memory; submit and clear in place; Back/Forward must not resurrect query text; reload returns to the honest initial state; initial Search explains “Literal text, dates, exact tags, and photo captions. No AI or image search.” and contains no suggested/recent-memory content. - Explicit exclusion: exact date/tag/caption execution, match reasons, Include history, revision/Trash labels, and complete updating/error semantics are not accepted in v6; they are v21 after v18–v20.
- Experience acceptance: wide and compact layouts preserve the approved shell; the search field has an explicit label; status changes use a live region; submit, clear, Back/Forward, and restored focus are keyboard operable; personal query text is not copied into a toast or page heading.
- Prototype files: pending v6 implementation.
- QA evidence: pending fresh QA agent.
- Commit: pending.
- Disposition: implementation in progress; do not increment to v7 unless independent QA records
Passand v6 is frozen.
- This entry corrects two phrases in the preceding v6-started ledger entry without rewriting it.
- The v6 initial state explains the current literal scope—title, summary, stored topics, and displayed journal text—and explicitly identifies Photo Captions, date/exact-tag filtering, and history as v21 work. It does not claim those fields are executable in v6.
- Back/Forward never resurrects a term from URL or history state. While the same page instance remains open, the term intentionally remains in live JavaScript memory through internal navigation and is restored when returning to Search. Reload clears it.
- This clarification aligns the ledger with the approved v6 council contract and does not change the package boundary.
- Council approval: A;
../prototypes/v6/COUNCIL-v6.md. - Implementation evidence:
prototypes/calendar-ui/index-v6.html,app-v6.js,styles-v6.css,README-v6.md,../prototypes/CALENDAR-UI-PROTOTYPE-v6.md, and current-run captures underdocs/prototypes/v6/. - Independent QA agent:
/root/v6_independent_qa. - Checks performed: syntax/diff, fresh initial state, button and Enter submission, no-result, Clear, URL/title/history/storage privacy, legacy-query stripping, Back/Forward, reload, 1280/390/320 layouts, semantics/focus, console, inherited Calendar/Almanac/Settings, and scope boundary.
- Finding resolved in candidate: Enter on the labelled Search input initially failed to submit; the shared keyboard/form path was added and fully retested without incrementing the version.
- Open findings: Critical 0; High 0; Medium 0; Low 0.
- QA verdict: Pass;
../../design-qa-v6.md. - Commit: recorded in the following freeze entry after Git creates the immutable identifier.
- Next version released from queue: v7
PVA-002 Calendar Contract Completion.
- Immutable v6 implementation and evidence commit:
2c0fbf2(prototype: add private search state v6). - All mandatory gates are A; the package status is Complete.
- No v6 artifact may be edited by a later package. V7 must be created by copying the frozen v6 set and changing only newly versioned files plus shared tracker/index/log metadata.
- The v6 pass closes the urgent Search privacy defect but does not close the full
LID-REF-003row; complete lexical coverage remains assigned to v21.
- Product Manager agent:
/root/prototype_product_manager; P gate: A. - UI/UX Designer agent:
/root/prototype_ui_designer; D gate: A. - Project Manager agent:
/root/prototype_project_manager; C gate: A; full reconciliation in../prototypes/v7/COUNCIL-v7.md. - Implementing agent: root prototype agent; I gate: IP.
- Independent QA agent: to be newly assigned after the candidate and implementation evidence are ready; Q gate: —.
- Dependency evidence: v6 independently passed and is frozen at implementation commit
2c0fbf2; freeze-record heada1596ec; Council decision C-01 remains controlling. - Primary closure: the Calendar-specific
LID-REF-001audit gap.LID-REF-005andLID-SCP-004are regression-only in v7 and remain assigned to v35 and v19 respectively. - Council conflict resolution: use Product's exactly 12 textual
Jan–Decmonth buttons, immediate commit on month selection,Previous year/Next yeardraft-year controls, visible four-digit year, viewed-month selected state, visibleCurrent monthlabel, and initial focus on the viewed month. Use Design's external non-layout-shifting layered rings, progressive-disclosure treatment, breakpoints, target sizes, zoom behavior, focus/Back contract, and accessibility details. Do not implement Design's full-name month labels, draft-month confirmation button, synthetic availability summary, or initial heading focus. - Included acceptance: Calendar remains the default Monday-first
Asia/Kolkataimage-led grid; the month heading opens the chooser; a year change alone does not commit; choosing a month commits immediately, clears selected detail, updates only safe URL state, focuses Today or day 1, and announces the new month; cancel/Escape/backdrop preserve the current Calendar. Today uses a dotted external perimeter, selection a solid external perimeter, and keyboard focus an outermost dashed high-contrast ring; all coexist and remain distinct without entering image pixels. - C-01 invariant: cover tiles contain only the date and real/art image. Source, AI, and attention details appear only in safe accessible names and the selected Museum Margin; private title, caption, summary, tag, journal text, or private image description never enters the accessible name. Journal-only and quiet empty-date treatments remain.
- Required fixtures: 13 August Today/selected/real/attention; 11 August artwork-only; 6 August conflict attention; 8 August journal-only; 4 August partial media failure; 3 August empty; July empty month; September future browsing.
- Responsive/accessibility acceptance: seven columns without page overflow at 1280, 960, 700, 390, and 320 px; chooser becomes a full-width compact sheet with a 3 × 4 button grid; usable at 200% text and observed at 400% compact zoom; one roving tab stop; arrows/Home/End/Page keys/Enter/Space/Escape; focus trap and restoration; safe live announcement; no essential new text under 13 px; reduced-motion equivalence. Formal browser/WCAG/400% closure remains v35.
- Explicit exclusions: no v9 readiness, v10 state shell/retry completion, v11 date review, v19 lifecycle closure, v35 conformance claim, year mosaic, replacement Timeline, media wall, On This Day, streak/reminder, blank composer, web photo upload, or backend/production claim.
- Evidence boundary: this is synthetic frontend interaction design. It does not prove persistence, authentication, media delivery, cache/log privacy, integration, accessibility conformance, deployment, or production readiness.
- Prototype files: v7 candidate is in implementation; no completion claim.
- QA evidence: pending a fresh independent agent and current-run evidence.
- Commit: pending.
- Disposition: implementation in progress; repair any QA finding in the same unfrozen v7 candidate and do not release v8 until v7 receives an independent
Passand freeze record.
- Adversarial review identified a responsive contradiction: the Product contract retained visible title/count text on 8 August, while the Designer allowed secondary paper-tile text to disappear when seven columns become too narrow.
- Product Council clarified the contract append-only in
../prototypes/v7/COUNCIL-v7.md, Section 12. - At effective widths above 480 px, a journal-only paper tile retains date, restrained title, and journal count where legible. At effective widths up to 480 px, including 390/320 px and compact zoom layouts, it retains the date and quiet paper treatment while visually omitting title/count rather than clipping, shrinking below 13 px, or causing overflow.
- The complete safe accessible name remains
Saturday, 8 August 2026, 0 photos, 1 journal, no cover image; selection reveals full title/count/provenance in the Museum Margin. - C-01 is unchanged: real-photo and artwork-cover tiles remain image plus date only. Empty dates remain quiet date-only cells and cannot borrow the paper treatment.
- This is an acceptance clarification, not a gate reset. V7 remains Implementation in progress with Product, Design, and Council gates A; independent QA must test the clarified rule before freeze.
- Adversarial review identified that
Historical years have no arbitrary limitwas broader than the synthetic prototype's safe four-digitYYYY-MMstate contract. - Product Council clarified the contract append-only in
../prototypes/v7/COUNCIL-v7.md, Section 13. - Life in Days retains no product archive-year cap. V7 alone is representationally bounded to
0001–9999:Previous yearis disabled at0001,Next yearis disabled at9999, and invalid/out-of-range URL state is canonicalized without preserving it in history. - This is a truthful frontend representation boundary, not a production retention, ingestion, Journal Date, or storage rule and not evidence that the final date model is implemented or verified.
- The v7 QA gate now includes both edge years, disabled-control semantics, exactly four-digit display, and invalid URL canonicalization. V7 remains Implementation in progress with Product, Design, and Council gates A.
- Council approval: A;
../prototypes/v7/COUNCIL-v7.md, including append-only compact paper-tile and prototype-year clarifications. - Implementation evidence:
prototypes/calendar-ui/index-v7.html,app-v7.js,styles-v7.css,README-v7.md,../prototypes/CALENDAR-UI-PROTOTYPE-v7.md, and current-run captures under../prototypes/v7/. - Exact final artifact identity, SHA-256 prefixes:
index-v7.html=03cdafe8…;app-v7.js=90f2d2b8…;styles-v7.css=0fe7faec…. The QA pass applies only to these exact bytes; any later artifact change invalidates the pass and requires fresh independent QA. - Independent QA agent:
/root/v7_independent_qa. - Test scope: Calendar month chooser anatomy and immediate commit; year-only navigation and
0001/9999disabled edges; URL canonicalization and private generic title; previous/next/Today/chooser history; Back and focus restoration; roving arrows/Home/End/Page/Enter/Space/Escape behavior; safe accessible names; independent Today/selected/focus rings; C-01 image-only cover tiles; selected Margin progressive disclosure; real-photo precedence; artwork-only, attention, journal-only paper, partial-media-failure, quiet-empty-date, empty-month, and future-month fixtures; 1280/960/700/390/320 responsive layouts; compact paper-day clarification; light/dark themes; reduced motion; zoom observations; console/syntax behavior; and inherited v6 private Search regression. - Evidence boundary checked: the result is synthetic frontend interaction evidence only. It does not establish backend persistence, authentication, storage, media delivery, cache/log privacy, integrations, deployment, formal accessibility conformance, or production readiness.
- Findings: Critical 0; High 0; Medium 0; Low 0.
- QA verdict: Pass.
- Gates and closure: Product A; Design A; Council A; Implementation A; QA A. Package status is Complete, and the Calendar-specific
LID-REF-001prototype gap is closed.LID-REF-005andLID-SCP-004remain regression-only and open for their v35/v19 primary closures. - Git implementation commit: pending root creation. The exact artifact hashes above are the interim immutable identity; the later freeze entry must record the commit without implying a second QA pass unless bytes change.
- Next version released from queue: v8
PVA-003 Cross-month Almanac.
- This entry resolves the implementation-commit placeholder in the preceding v7 QA disposition without rewriting that append-only evidence.
- Immutable v7 implementation and evidence commit:
05975fc(prototype: complete calendar contract v7). - The commit binds the independently passed artifact identities:
index-v7.htmlSHA-256 prefix03cdafe8…;app-v7.jsprefix90f2d2b8…;styles-v7.cssprefix0fe7faec…. - All mandatory v7 gates remain A; package status remains Complete; the Calendar-specific
LID-REF-001prototype gap remains closed. No second QA pass is claimed because the committed bytes are the exact independently verified bytes. - No v7 prototype, council, evidence, screenshot, guide, or design-QA artifact may be edited by a later package. V8 and later work must copy from the frozen v7 set into newly numbered files; any necessary correction to v7 must be a new append-only record and requires a fresh independent QA disposition.
- V8
PVA-003 Cross-month Almanacremains released from the queue.
- Product Manager agent:
/root/prototype_product_manager; P gate: A. - UI/UX Designer agent:
/root/prototype_ui_designer; D gate: A. - Project Manager agent:
/root/prototype_project_manager; C gate: A; reconciled contract in../prototypes/v8/COUNCIL-v8.md. - Implementing agent: root prototype agent; I gate: IP.
- Independent QA agent: to be newly assigned after the v8 candidate and evidence are ready; Q gate: —.
- Dependency evidence: v7 independently passed and is frozen at implementation/evidence commit
05975fc; freeze recorddda1b9c; C-02 and C-03 remain controlling; frozen v6 private Search is an inherited invariant. - Primary closure after an independent pass: audit gap 11 and
LID-REF-002at frontend-prototype level only.LID-REF-004,LID-REF-005,LID-REF-006, andLID-SCP-004are regressions, not v8 closure claims. - Council reconciliation: preserve the Designer's Almanac/book hierarchy, external provenance, semantic sections/articles, responsive index/drawer, accessibility, and no-raw-journal treatment. Where contracts differed, Product acceptance controls: initial window is August only; each
Load earlier daysadds exactly one immediately preceding calendar month including empty July; Product fixtures/counts prevail; the wide index includes safe live-day links inside month groups; CTA isRead full Journal Day; Jump resets to one target month; Load-success focus remains on the same logical Load control; URL usesmonthas newest,throughas oldest, and optionaldateas chapter anchor. - Included acceptance: newest-to-oldest live Journal Days grouped by month; one canonical Calendar Cover; real-photo precedence; generated summary preview and no source-journal feed; no pixel overlays; collapsible wide index and compact sheet; deterministic loading/loading-success/empty/error/retry/end states; immediate-commit 12-button Jump; exact canonical full-day route and Back/scroll/focus restoration; safe reload/deep-link/view preservation; hidden/Trash-only exclusion.
- Boundary sequence: August six days initially; first load July with zero days; second load June days 27/9; third load May days 31/14 and reaches
Beginning of this prototype archive. Hidden 20 June Trash-only and 18 May history-only must never render, count, appear in accessibility/index/jump metadata, or become a target. September is a known future-empty browse fixture. - URL contract:
view=almanac;month=YYYY-MMnewest boundary; optionalthrough=YYYY-MMoldest boundary; optional safedate;screen=dayonly for full Journal Day; optionalrail=collapsed. No loaded arrays, private text, title, tag, caption, query, scroll, or focus selector enters URL/history. Invalid/inverted/hidden state is canonicalized safely; title remainsLife in Days. - Responsive/accessibility acceptance: semantic H1/H2/H3 sections/articles; no grid/feed semantics; 1280/960/700/390/320 layouts; no overflow; wide rail/compact focus-trapped sheet; targets/provenance size; keyboard/focus/live region; light/dark; reduced motion; 200% text and compact 400% observation. Formal accessibility/browser closure remains v35.
- Explicit exclusions: no Timeline tab, infinite/autoload, year mosaic, media wall, map, On This Day, raw journal feed, first-use v9, complete shell v10, History v18, Trash v19, complete Search v21, final accessibility v35, historic automatic import, sharing, coaching, reminders, streaks, AI search, offline mode, blank composer, web photo upload, backend filtering/pagination/persistence/auth/media/deployment claim.
- Evidence boundary: fictional frontend state only; it does not prove database order/filtering, lifecycle, server pagination, persistence, authentication, media delivery, production accessibility, deployment, or production readiness. The only allowed post-QA claim is
LID-REF-002 prototype-represented; implementation unverified. - Prototype files: pending v8 implementation; no completion claim.
- QA evidence: pending fresh independent agent and current-run evidence.
- Commit: pending.
- Disposition: implementation in progress; repair QA findings in the same unfrozen v8 candidate and do not release v9 until v8 independently passes and is frozen.
- Adversarial review found that a syntactically valid
through=0001-01or a valid distant live-date target could make the literal range contract attempt to render thousands of empty calendar months. - Product Council clarified the contract append-only in
../prototypes/v8/COUNCIL-v8.md, Section 14. - For ordinary v8 fixture browsing, a declared range older than
2026-05clamps to May 2026 through safe replacement. The fictional prototype beginning remains May 2026; no pre-May nodes are rendered or indexed. - A valid live-date target outside the current safe range normalizes to a single-month window for that date (
month=<date month>, no separatethrough, safedateretained). Intervening empty months are never materialized. A distant non-live date is removed without expansion. - Jump to a distant known/fixture-empty month likewise creates one quiet target month, not an intervening range. Fixed pagination across the current archive evidence remains the August → July → June → May sequence.
- These are bounded synthetic-rendering and denial-of-pathological-work protections, not product retention, ingestion, pagination, Journal Date, or archive-year limits and not production-architecture evidence.
- V8 QA must add the
through=0001-01clamp, distant empty jump, valid distant live-date single-month normalization, non-live-date removal, bounded Back/Forward/reload/detail return, and copy-boundary checks. - This clarification does not reset approved gates. V8 remains Implementation in progress with Product, Design, and Council gates A.
- Council approval: A;
../prototypes/v8/COUNCIL-v8.md, including the append-only bounded synthetic-range clarification. - Implementation and evidence: commit
47f5af9(prototype: add v8 cross-month almanac) containsprototypes/calendar-ui/index-v8.html,app-v8.js,styles-v8.css,styles-v8-almanac.css,README-v8.md,../prototypes/CALENDAR-UI-PROTOTYPE-v8.md,../../design-qa-v8.md, and current-run captures under../prototypes/v8/. - Exact independently passed artifact identity:
index-v8.html=0f876cf44f7f68478fa64653770ecd46bba9cd853bc6fcc3f3057e123a4ae384;app-v8.js=bc478af42d55df256fab8b2e9f0773d00b049a7879a12535a2a7effe11815760;styles-v8.css=453577e1b9c93ff63e215886b50215b8ad53a795dff5830afe47920711f19bda;styles-v8-almanac.css=87ef6345aa6ef054d76354c5c27e901980f99478fc2802b62a8d51c8ae618007. Any byte change to these four artifacts invalidates this disposition and requires fresh independent QA. - Independent adversarial reviewer verdict: Pass. Independent QA agent:
/root/v8_independent_qa; verdict: Pass. - Bounded evidence scope: current-run checks covered reverse-chronological August chapters; deterministic empty July, populated June, and populated May loads; May archive boundary; month/year Jump and edge years; bounded ancient, distant-live, distant-empty, and non-live routes; canonical Journal Day routing and exact reading-context return; hidden/Trash-only exclusion; opaque history identity and private Search regression; wide/compact responsive behavior; focus, theme, reduced-motion, zoom observations, console, syntax, and frozen-v7 regression. This is deterministic fictional frontend evidence, not an unbounded archive, data-volume, or production-system test.
- Repaired before the final fingerprint: private reading context moved behind an opaque in-memory history entry; rail, view-switch, theme, responsive, and full-day return paths gained stable logical anchors; adjacent-day navigation stopped overwriting the settled Almanac origin; modal and action-completion focus returns were made explicit; compact Read/Load/Retry/archive-end targets were raised to the required 44 px minimum; pathological ranges were normalized to bounded synthetic work. The complete gate restarted after each fingerprint change.
- Findings at the final fingerprint: Critical 0; High 0; Medium 0; Low 0. No v8 finding remains open.
- Gates and closure: Product A; Design A; Council A; Implementation A; QA A. Package status is Complete. Only
LID-REF-002is closed by this package;LID-REF-004,LID-REF-005,LID-REF-006, andLID-SCP-004remain open for their assigned primary versions. - Evidence boundary: the result represents fictional frontend interaction intent and deterministic in-browser state for the exact static files above. It does not prove database ordering or visibility filters, server pagination, lifecycle enforcement, persistence, authentication, media delivery, integration behavior, deployment, formal accessibility conformance, or production readiness. The allowed closure statement is
LID-REF-002is prototype-represented; implementation remains unverified. - Next version released to start: v9
PVA-004 First-use Readiness. No v9 role has started, so its execution-register status remainsQueuedand every v9 gate remains—.
- Immutable v8 implementation and evidence commit:
47f5af9(prototype: add v8 cross-month almanac). It binds the independently passed artifact identities:index-v8.htmlSHA-2560f876cf44f7f68478fa64653770ecd46bba9cd853bc6fcc3f3057e123a4ae384;app-v8.jsSHA-256bc478af42d55df256fab8b2e9f0773d00b049a7879a12535a2a7effe11815760;styles-v8.cssSHA-256453577e1b9c93ff63e215886b50215b8ad53a795dff5830afe47920711f19bda;styles-v8-almanac.cssSHA-25687ef6345aa6ef054d76354c5c27e901980f99478fc2802b62a8d51c8ae618007. - All mandatory v8 gates are A and the execution-register package status is Complete. The forthcoming tracker-only freeze-record commit will record this disposition; no freeze-record commit identifier is claimed here, and no second QA pass is implied because the passed prototype bytes are unchanged.
- After that freeze record, no v8 prototype, council, evidence, screenshot, guide, or design-QA artifact may be edited by a later package. V9 and later work must copy from the immutable v8 set into newly numbered files; any necessary v8 artifact correction requires a new append-only record and fresh independent QA.
- V9
PVA-004 First-use Readinessis released to start, while its Product, Design, Council, Implementation, and QA gates remain not started. - Freeze readiness remains a frontend-prototype disposition only. It does not claim a backend implementation, connected provider or integration, persistence, security control, deployment, production accessibility, or production readiness.
- Product Manager agent:
/root/v9_pm_fast; P gate: A. - UI/UX Designer agent:
/root/v9_design_fast; D gate: A. - Project Manager / Council chair:
/root/v9_council_manager; C gate: A; reconciled contract in../prototypes/v9/COUNCIL-v9.md. - Implementing agent: root prototype agent; I gate: IP.
- Independent QA agent: to be newly assigned only after the stable v9 candidate and current-run evidence are ready; Q gate: —.
- Dependency evidence: v8 independently passed and is frozen at implementation/evidence commit
47f5af9; freeze recordfd910f5. C-04 remains controlling, and frozen v6/v7/v8 artifacts are immutable inherited regressions. - Primary closure after an independent pass: only the first-use portion of audit gap 3 at frontend-prototype level. The allowed statement is “First-use readiness is prototype-represented with synthetic fixtures; integrations, recovery, implementation, and operations remain unverified.” Gap 3 remains open for v10's resilient shell. No Outside UI requirement or recovery-evidence requirement advances because a readiness screen exists.
- Council reconciliation: Calendar remains the default and dominant surface. Product exact copy/statuses control where the contracts differed. The Designer's proposed completed Recovery Ceremony fixture is excluded; Recovery Ceremony remains
Blockedwith three unevidenced prerequisites in every v9 fixture because v32 owns evidence and completion. VoiceNotes/Telegram/AI may reach existing Settings boundaries; Backup and Ceremony use bounded read-only requirement disclosures rather than a false System Health implementation. - Included acceptance: default empty August 2026 Calendar under the frozen synthetic
Asia/Kolkatadate context; seven quiet Monday-first columns; exactYour archive begins here.introduction; Upload and Review readiness actions; five independent divider-based rows; no aggregate readiness score; VoiceNotes exactlife-in-daysprospective boundary; Telegram one numeric user/private-chat/compression boundary with no identifier; optional/unavailable AI without a provider; Backup Not configured/Never verified without success evidence; Recovery Ceremony always Blocked with exactly threeNot evidencedprerequisites. - Fixture matrix:
first-use/default,first-use/configured-unverified,first-use/ai-unavailable, and unchangedarchive/populated. Fixture choice is allowlisted live memory only, visibly labelledPrototype datafor alternates, resets on reload, and never enters URL, history payload, title, storage, cookies, network, logs, or analytics. Invalid state fails closed to the default. - Navigation/focus acceptance: Review readiness focuses its H2 without history churn; VoiceNotes/Telegram/AI use safe structural Settings links and exact subgroup focus; Browser Back/Forward restores the precise Calendar origin/destination; Backup/Ceremony disclosures are local and restore invoking focus; empty-date activation creates nothing.
- Responsive/accessibility acceptance: Calendar-dominant wide companion, stacked compact layout, seven columns at 390/320 px, no page overflow or bottom-navigation occlusion, portrait/landscape, 200% text and compact 400% observation, one first-use H1, semantic Readiness region/rows, full keyboard and screen-reader paths, measured focus/target/contrast checks, non-color status, restrained live announcements, and reduced-motion equivalence. Formal conformance remains v35.
- Explicit exclusions: v10 global loading/failure/interruption/session/retry states; v24 first-class System Health; v25 qualified provider/settings behavior; v32 backup/check/restore/full-drill evidence and completed Recovery Ceremony; live configuration, credentials, integration/provider calls, encryption/storage/authentication/deployment, production readiness, lifestyle onboarding, historic import, reminders/streaks/coaching/sharing, blank browser composition, web photo upload, offline mode, or semantic search.
- Evidence boundary: fictional deterministic frontend state only. V9 cannot establish connection, durable capture, backup, restore, recovery-key custody, encryption, server configuration, authentication, deployment, accessibility conformance, or launch readiness.
- Prototype files: pending v9 implementation; no completion claim.
- QA evidence: pending a fresh independent agent and current-run evidence after a stable candidate fingerprint exists.
- Commit: pending.
- Disposition: Implementation in progress. Repair every finding in the same unfrozen v9 candidate; any artifact change invalidates a prior review fingerprint. Do not release v10 until v9 receives an independent
Passand a freeze record.
- Council approval: A;
../prototypes/v9/COUNCIL-v9.md. - Implementation and evidence commit:
ae34415(prototype: add v9 first-use readiness). It containsprototypes/calendar-ui/index-v9.html,app-v9.js,styles-v9.css,styles-v9-almanac.css,styles-v9-readiness.css,README-v9.md,../prototypes/CALENDAR-UI-PROTOTYPE-v9.md,../../design-qa-v9.md, the Council contract, and current-run captures under../prototypes/v9/. - Exact independently passed artifact identity:
index-v9.htmlSHA-25696527f3e8e96e1bfdaa5a3e31cf6885a6b5505a108ca9c287e00d7b570719af9;app-v9.jsSHA-2569677a6023baf45e67a8580e46cec48261c4747d62d391969e3cf4877ce3875ee;styles-v9.cssSHA-2563f38acbe74ffdac691b5963a779b27d61f3f19e3f03775aabec626b74bb12869;styles-v9-almanac.cssSHA-2567ca0b5ad77cef1e08681479cd1d79d9dd1dafb70e520d1e0ee04d15860b38b8b;styles-v9-readiness.cssSHA-256e2c07c35b05307ff682ed0ecb21ceb4e33fcb8b5a45f2cd227b23d86584cd42e. Any byte change to these five artifacts invalidates this disposition and requires fresh independent QA. - Independent QA agent:
/root/v9_independent_qa; upload-path QA agent:/root/v9_upload_qa. Final verdict: Pass. - Current-run coverage: exact empty-Calendar/readiness copy and independent fixtures; genuine first Uploaded Journal creation from an empty archive; atomic saving/stale-callback handling; VoiceNotes, Telegram, AI, Backup, and always-Blocked Recovery Ceremony truth boundaries; Settings origin/destination focus and Back/Forward; private fixture/Search state; backup/recovery disclosures; populated v8 regression; Calendar/Almanac/full-day behavior; 1440/1280/960/700/390/320 responsive layouts, landscape, compact zoom-equivalent reflow, light/dark, reduced motion, focus, target-size, syntax, and console checks.
- Repairs before the final fingerprint included isolating first-use upload and duplicate checks from hidden populated fixtures; making the simulated save atomic and canceling stale callbacks after navigation; completing readiness accessible names; removing callback/account identifiers from inherited Settings; repairing disclosure focus entry/return; preserving the complete compact prototype boundary; and replacing contradictory durability wording with truthful temporary-prototype copy. The complete independent gate restarted after every artifact change.
- Findings at the final fingerprint: Critical 0; High 0; Medium 0; Low 0. No v9 finding remains open.
- Gates and closure: Product A; Design A; Council A; Implementation A; QA A. Package status is Complete. Only audit gap 3's first-use portion is closed at frontend-prototype level. Audit gap 3 remains open for v10's loading, connectivity, interruption, authorization-expiry, generic-error, and retry states; no numbered Outside UI requirement or recovery-evidence requirement advances.
- Evidence boundary: the result represents fictional frontend interaction intent and deterministic browser-memory behavior for the exact static files above. It does not prove live VoiceNotes or Telegram behavior, persistence, AI providers, backup, restoration, recovery-key custody, encryption, authentication, deployment, formal accessibility conformance, production accessibility, operations, or production readiness. Text-only zoom was observed through equivalent compact reflow rather than a native user-agent text-only zoom session.
- Allowed closure statement: “First-use readiness is prototype-represented with synthetic fixtures; integrations, recovery, implementation, and operations remain unverified.”
- Freeze readiness: implementation/evidence commit
ae34415binds the exact independently passed prototype bytes. The forthcoming freeze-record commit is not yet known and is not claimed here. That commit also normalizes trailing Markdown whitespace in the QA report and handoff; it does not change any of the five passed UI artifacts, so no second QA pass is implied. - After the freeze record is committed, no v9 prototype, Council, evidence, screenshot, guide, or design-QA artifact may be edited by a later package. Any v9 artifact correction requires a new append-only disposition and fresh independent QA.
- Next version released from queue: v10
PVA-005 Resilient Application Shell. Its execution-register status remainsQueued, and Product, Design, Council, Implementation, and QA gates all remain—because no v10 role has started.
- Immutable v9 implementation and evidence commit:
ae34415(prototype: add v9 first-use readiness); freeze record:5a12fb2(docs: freeze v9 prototype). - The freeze binds the independently passed artifact identities:
index-v9.htmlSHA-25696527f3e8e96e1bfdaa5a3e31cf6885a6b5505a108ca9c287e00d7b570719af9;app-v9.jsSHA-2569677a6023baf45e67a8580e46cec48261c4747d62d391969e3cf4877ce3875ee;styles-v9.cssSHA-2563f38acbe74ffdac691b5963a779b27d61f3f19e3f03775aabec626b74bb12869;styles-v9-almanac.cssSHA-2567ca0b5ad77cef1e08681479cd1d79d9dd1dafb70e520d1e0ee04d15860b38b8b;styles-v9-readiness.cssSHA-256e2c07c35b05307ff682ed0ecb21ceb4e33fcb8b5a45f2cd227b23d86584cd42e. - All mandatory v9 gates remain A and package status remains Complete. Only audit gap 3's first-use portion is closed at frontend-prototype level; v10 retains the interruption/failure remainder.
- No second QA pass is implied: freeze record
5a12fb2records the existing pass and normalizes documentation whitespace without changing any of the five independently passed UI artifacts. - No v9 prototype, Council contract, evidence, screenshot, guide, or design-QA artifact may be edited by v10 or any later package. Any correction requires a new append-only disposition, a changed fingerprint, and fresh independent QA.
- V10
PVA-005 Resilient Application Shellremains released from the queue but has not started: its execution-register status isQueued, and Product, Design, Council, Implementation, and QA gates all remain—. - This freeze is a fictional frontend-prototype disposition only. It does not prove integrations, persistence, AI providers, backup, restoration, recovery-key custody, encryption, authentication, deployment, accessibility conformance, operations, or production readiness.
- Product Manager agent:
/root/v10_product_manager; P gate: A. - UI/UX Designer agent:
/root/v9_upload_qa, reassigned for v10 design; D gate: A. - Project Manager / Council chair:
/root/v9_independent_qa, reassigned for v10 governance; C gate: A. The reconciled contract is../prototypes/v10/COUNCIL-v10.md; root acted only as mechanical scribe after the chair's source and conflict review. - Implementing agent: root prototype agent; I gate: IP. Independent QA will be a newly assigned agent after a stable v10 fingerprint exists; Q gate: —.
- Dependency evidence: v9 independently passed and is frozen at implementation/evidence commit
ae34415and freeze record5a12fb2. Its exact five-file UI fingerprint is immutable, as are frozen v6–v8 artifacts. - Primary closure after an independent pass: only audit gap 3's interruption/failure portion at frontend-prototype level. The sole permitted statement is “The resilient application shell is prototype-represented with synthetic fixtures; connectivity, server behavior, authentication, persistence, and idempotency enforcement remain unverified.” No Outside UI requirement advances.
- Included shell family: initial loading; pending/failed Calendar month request; partial real-photo failure; persistent connection interruption; bounded unsaved-Correction interruption exercise; session ended and generic reauthentication return; empty-load and settled-request server failure; explicit guarded retry and stale-completion cancellation.
- Council priority: session ended/reauthentication; initial loading or total server failure; unsaved-leave confirmation; connection interruption; view request state; item media state; ordinary ready UI. Only one global primary recovery action may compete at a time.
- Fixture console:
shell/ready,shell/app-loading,shell/month-failure,shell/media-failure,shell/connection-interrupted,shell/correction-interrupted,shell/session-expired,shell/session-expired-with-draft, andshell/server-failure. These are visibly labelled synthetic live-memory controls; invalid state fails closed and reload returns to ready. - Interaction invariants: settled authentic content stays readable when contracted; pending month never shows old imagery beneath a new heading; media Retry keeps the same item/count/order; reconnection never auto-saves; Correction remains zero represented saves until explicit post-reconnect Retry and then exactly one; session return is generic and carries no draft/private destination; every asynchronous completion is token-guarded and stale work is ignored.
- URL/privacy boundary: inherited safe structural parameters and opaque history-entry identity only. No fixture, shell status, error, pending month, retry token, draft, source text, query, focus selector, auth state, or private redirect enters URL, title, history payload, storage, cookies, cache, service worker, referrer, request, console, logs, or analytics.
- Explicit exclusions: no complete Correction/provenance lifecycle (v15/v16), durable Upload (v14), provider failure strategy (v23/v27), System Health/storage/backup/recovery proof (v24/v31/v32), or full access/security boundary (v34); no credentials, offline/cache/sync, queued writes, automatic retry, silent fallback, deployment, durability, production accessibility, or production-readiness claim.
- Responsive/accessibility acceptance: 1440/1280/960/700/390/320 plus compact landscape and zoom observations; complete wrapping; no horizontal overflow or covered actions; seven Calendar columns; 44 px compact primary targets; one concise shell live region; hidden skeletons; logical retry/dialog/session focus; both themes; reduced motion; non-color status.
- Prototype files, current-run captures, independent QA disposition, exact hashes, and implementation commit: pending. V11 remains queued and is not released until v10 independently passes and is frozen.
- Disposition: Implementation in progress. Any finding is repaired in the same unfrozen v10 candidate; every UI-byte change invalidates a prior review/QA fingerprint.
- Council approval: Product A, Design A, Project/Council A;
../prototypes/v10/COUNCIL-v10.md. - Implementation and evidence commit:
ffabe0d(prototype: add v10 resilient application shell). It contains all six UI artifacts,README-v10.md,../prototypes/CALENDAR-UI-PROTOTYPE-v10.md,../../design-qa-v10.md, the Council contract, package check, running-log handoff, and seventeen current-run PNGs under../prototypes/v10/. - Exact independently passed UI identity:
index-v10.htmlSHA-2569a8a1da6fc00ff4f694cb00dba3f5784168ab1a9d45b16ca680c410d6d330428;app-v10.jsSHA-2565e0876d7e5ce91040b7b921a1a1fe10746304ae85f39c66f001166e56b8793ca;styles-v10.cssSHA-2563f38acbe74ffdac691b5963a779b27d61f3f19e3f03775aabec626b74bb12869;styles-v10-almanac.cssSHA-2567ca0b5ad77cef1e08681479cd1d79d9dd1dafb70e520d1e0ee04d15860b38b8b;styles-v10-readiness.cssSHA-256e2c07c35b05307ff682ed0ecb21ceb4e33fcb8b5a45f2cd227b23d86584cd42e;styles-v10-resilience.cssSHA-256d69e52e73bfb2f72c378fbed3b60e1268790cdc91c642dbae347be01b642201c. Any UI-byte change invalidates this disposition and requires a fresh complete independent gate. - Independent QA agent:
/root/v10_independent_qa; final verdict: Pass. Findings at the passed fingerprint: Critical 0; High 0; Medium 0; Low 0. - Current-run coverage: ready/default privacy; initial loading; target-month success/failure/Retry/history; partial-media Calendar/Museum Margin/full-day success/failure/identity; connection interruption across views; dirty/failed/saved Correction with exact draft/caret, unsaved navigation and native reload warning; session expiry/reauthentication privacy; empty and settled server failure; repeat activation and stale-callback cancellation; collision priority; URL/title/history/storage/network/console privacy; semantics, focus, keyboard, targets, representative contrast; 1440/1280/960/700/390/320 and 568×320 landscape; light/dark, reduced motion, compact reflow-equivalent zoom observation; and frozen v6–v9 regression.
- Repairs before the passed fingerprint included deterministic operation cancellation; focus and reading-position preservation; truthfully coordinated connection/Correction failure; exact draft/caret retention; persistent single represented Correction; private session/loading boundary cleanup; modal/file-read race guards; state-priority and fixture-console truth; responsive recovery/action visibility; dark primary contrast; and the 700 px journal-title boundary. The independent gate restarted after every changed UI fingerprint.
- Gates and closure: Product A; Design A; Council A; Implementation A; QA A. Package status is Complete. Only audit gap 3's interruption/failure portion and the frontend-prototype representation of
LID-OPS-018close. No Outside UI requirement advances, and v15/v16, v24/v31/v32, v34, and v35 retain their assigned lifecycle, operations, security, and formal-conformance responsibilities. - Allowed closure statement: “The resilient application shell is prototype-represented with synthetic fixtures; connectivity, server behavior, authentication, persistence, and idempotency enforcement remain unverified.”
- Evidence boundary: fictional deterministic frontend interaction and exact static bytes only. The pass does not prove connectivity, server responses, durable writes, authentication/Cloudflare enforcement, idempotency beyond the page, deployment, formal accessibility conformance, operations, or production readiness. The automation backend auto-handled the native
beforeunloaddialog and capped requested page scale at 3×; draft non-resurrection and 640/320 compact reflow equivalents were independently observed. - Freeze readiness: implementation/evidence commit
ffabe0dbinds the exact passed bytes. This following documentation-only freeze record does not modify any v10 UI, QA, handoff, Council, guide, or evidence artifact and does not imply a second QA pass; its Git identifier is recorded by the next append-only tracker entry. - No v10 prototype, Council contract, evidence capture, guide, handoff, or design-QA artifact may be edited by v11 or a later package. A necessary correction requires a new append-only disposition, a changed fingerprint, and fresh independent QA.
- Next version released from queue: v11
PVA-006 Needs Date Review. Its execution-register status remainsQueued, and Product, Design, Council, Implementation, and QA gates all remain—until its roles start.
- Immutable v10 implementation and evidence commit:
ffabe0d(prototype: add v10 resilient application shell); freeze record:497c98d(docs: freeze v10 prototype). - The freeze binds the independently passed artifact identities:
index-v10.htmlSHA-2569a8a1da6fc00ff4f694cb00dba3f5784168ab1a9d45b16ca680c410d6d330428;app-v10.jsSHA-2565e0876d7e5ce91040b7b921a1a1fe10746304ae85f39c66f001166e56b8793ca;styles-v10.cssSHA-2563f38acbe74ffdac691b5963a779b27d61f3f19e3f03775aabec626b74bb12869;styles-v10-almanac.cssSHA-2567ca0b5ad77cef1e08681479cd1d79d9dd1dafb70e520d1e0ee04d15860b38b8b;styles-v10-readiness.cssSHA-256e2c07c35b05307ff682ed0ecb21ceb4e33fcb8b5a45f2cd227b23d86584cd42e;styles-v10-resilience.cssSHA-256d69e52e73bfb2f72c378fbed3b60e1268790cdc91c642dbae347be01b642201c. - All mandatory v10 gates remain A, package status remains Complete, and final findings remain Critical 0, High 0, Medium 0, Low 0. Only audit gap 3's interruption/failure portion and the frontend-prototype representation of
LID-OPS-018close. - No second QA pass is implied: freeze record
497c98drecords the existing exact-hash Pass without changing any v10 UI, QA, Council, guide, handoff, or evidence artifact. - No v10 artifact may be edited by v11 or a later package. Any correction requires a new append-only disposition, changed fingerprint, and fresh complete independent QA.
- V11
PVA-006 Needs Date Reviewis released from the queue but remainsQueued, with Product, Design, Council, Implementation, and QA gates all—until its roles start. - This freeze remains fictional frontend-prototype evidence only and does not prove connectivity, server behavior, persistence, authentication, idempotency outside the page, deployment, formal accessibility conformance, operations, or production readiness.
Generated from arunpr614/Life-Reflection@6b8b70b72148 · Canonical content lives in Git · Fictional prototype data only
- Life in Days — Hetzner shared-host runbook
- Life in Days — Phase1 implementation plan
- PID R10 — Conditional Object-Store Transition
- PRD R0 — Shared-Host Private Foundation
- PRD R1 — Manual Journal Archive
- PRD R2 — Telegram Photo Capture
- PRD R3 — Retrieval and Date Integrity
- PRD R4 — Source History and Lifecycle Safety
- PRD R5 — Prospective VoiceNotes Sync
- PRD R6 — Generated Text Reflection
- PRD R7 — Generated Artwork
- PRD R8 — Operational Scale and Resilience
- PRD R9 — Private Launch Acceptance and Stabilization
- Life in Days release documents
- Life in Days Phase 1 — AI agent resource index
- Codex Goal prompt — Phase 1 P0 requirements to private production
- P0 Codex Gold Goal prompt — complete P0 and R0 only
- Phase 1 GitHub Project V2 sync
- Life in Days — Phase 1 Release Plan
- Life in Days — detailed implementation plan
- Life in Days Global PRD
- Life in Days — project tracker
- Life in Days — prototype completeness tracker
- Life in Days — requirements traceability
- Life in Days — UX specification
- Life in Days — AI Artwork Model Evaluation
- Life in Days — AI Text Model Evaluation
- Initial product brief
- Life in Days: Private Media Storage Evaluation
- Requirements under discovery
- Product and integration research
- Project Git provenance
- Life in Days — proposed shared understanding
- Life in Days — Product Council planning-baseline review
- Life in Days Phase 1 — Independent QA Lead charter
- Agent charter — Project Manager
- Agent charter — Senior Product Manager
- Agent charter — Technical Architect
- Agent charter — UI/UX Design Lead
- Life in Days Phase 1 — P0 Owner Action Ledger
- Life in Days Phase 1 — P0 execution context digest
- Life in Days Phase 1 — P0 execution authorization addendum
- Life in Days Phase 1 — P0 execution council charter
- Life in Days Phase 1 — P0 execution decision ledger
- Life in Days Phase 1 — P0 task Definition of Ready
- Life in Days Phase 1 — P0 execution-control review
- P0/R0 Stage 0 control-repair candidate review dossier
- P0/R0 Stage 0 delivery checklist
- P0/R0 Stage 0 rollback and recovery plan
- P0/R0 Stage 0 state contract
- P0/R0 Stage 0 test plan
- PC-001 readiness-control hardening — planning review
- Life in Days — Phase 1 Product Council Decision Record
- Life in Days Phase 1 — source baseline
- Life in Days Phase 1 — Product Council charter
- Life in Days — Product Manager Council Review
- Life in Days — Project Manager Council Review
- Life in Days — Product Council UX Design Review
- Life in Days Product Council
- Life in Days — calendar UI prototype
- Life in Days — calendar UI prototype v2
- Life in Days — unified Calendar and Almanac prototype v3
- Life in Days — Museum Margin Calendar prototype v4
- Life in Days — private Settings and compact privacy prototype v5
- Life in Days — private Search prototype v6
- Life in Days — Calendar contract prototype v7
- Life in Days — Cross-month Almanac prototype v8
- Life in Days — First-use Readiness prototype v9
- Life in Days — Resilient Application Shell prototype v10
- Life in Days calendar UI prototype
- Life in Days calendar UI prototype v2
- Life in Days unified calendar prototype v3
- Life in Days Museum Margin prototype v4
- Life in Days Settings prototype v5
- Life in Days — private Search prototype v6
- Life in Days prototype v7 — Calendar contract completion
- Life in Days prototype v8 — Cross-month Almanac
- Life in Days prototype v9 — First-use Readiness
- Life in Days prototype v10 — Resilient Application Shell
- v6 Product Council contract — Private Search State
- Life in Days prototype v7 — Product Council contract
- Life in Days prototype v8 — Product Council contract
- Life in Days prototype v9 — Product Council contract
- Life in Days prototype v10 — Product Council contract
- Life in Days v2 — design QA
- Life in Days unified prototype v3 — design QA
- Life in Days v4 — design QA
- Life in Days v5 design QA
- Life in Days v5 design QA
- Life in Days v6 — independent design and interaction QA
- Life in Days v7 — independent design and interaction QA
- Life in Days prototype v8 — independent design QA
- Life in Days prototype v9 — independent design QA
- Life in Days prototype v10 — independent design QA
- Life in Days prototype v5 — PRD feature audit
- AI agent operating contract — keep Phase 1 alive
- Contributing to Life in Days
- GitHub Projects Roadmap — current capability research
- Life in Days — Hetzner shared-host deployment spike
- Wayfinder for Life in Days Phase 1 — adoption and GitHub integration report
- Life in Days — GitHub Projects Roadmap design spike
- ARCH-R0-001 — Product Council task readiness
- ARCH-R0-001 — task delivery checklist
- ARCH-R0-001 — task design specification
- ARCH-R0-001 — task product requirements
- ARCH-R0-001 — task QA plan
- ARCH-R0-001 — task technical plan
- ARCH-R1-001 — Product Council task readiness
- ARCH-R1-001 — task delivery checklist
- ARCH-R1-001 — task design specification
- ARCH-R1-001 — task product requirements
- ARCH-R1-001 — task QA plan
- ARCH-R1-001 — task technical plan
- ARCH-R2-001 — Product Council task readiness
- ARCH-R2-001 — task delivery checklist
- ARCH-R2-001 — task design specification
- ARCH-R2-001 — task product requirements
- ARCH-R2-001 — task QA plan
- ARCH-R2-001 — task technical plan
- ARCH-R3-001 — Product Council task readiness
- ARCH-R3-001 — task delivery checklist
- ARCH-R3-001 — task design specification
- ARCH-R3-001 — task product requirements
- ARCH-R3-001 — task QA plan
- ARCH-R3-001 — task technical plan
- ARCH-R4-001 — Product Council task readiness
- ARCH-R4-001 — task delivery checklist
- ARCH-R4-001 — task design specification
- ARCH-R4-001 — task product requirements
- ARCH-R4-001 — task QA plan
- ARCH-R4-001 — task technical plan
- ARCH-R5-001 — Product Council task readiness
- ARCH-R5-001 — task delivery checklist
- ARCH-R5-001 — task design specification
- ARCH-R5-001 — task product requirements
- ARCH-R5-001 — task QA plan
- ARCH-R5-001 — task technical plan
- ARCH-R6-001 — Product Council task readiness
- ARCH-R6-001 — task delivery checklist
- ARCH-R6-001 — task design specification
- ARCH-R6-001 — task product requirements
- ARCH-R6-001 — task QA plan
- ARCH-R6-001 — task technical plan
- ARCH-R7-001 — Product Council task readiness
- ARCH-R7-001 — task delivery checklist
- ARCH-R7-001 — task design specification
- ARCH-R7-001 — task product requirements
- ARCH-R7-001 — task QA plan
- ARCH-R7-001 — task technical plan
- ARCH-R8-001 — Product Council task readiness
- ARCH-R8-001 — task delivery checklist
- ARCH-R8-001 — task design specification
- ARCH-R8-001 — task product requirements
- ARCH-R8-001 — task QA plan
- ARCH-R8-001 — task technical plan
- ARCH-R10-001 — Product Council task readiness
- ARCH-R10-001 — task delivery checklist
- ARCH-R10-001 — task design specification
- ARCH-R10-001 — task product requirements
- ARCH-R10-001 — task QA plan
- ARCH-R10-001 — task technical plan
- AUD-001 — Product Council task readiness
- AUD-001 — task delivery checklist
- AUD-001 — task design specification
- AUD-001 — task product requirements
- AUD-001 — task QA plan
- AUD-001 — task technical plan
- ENG-R0-001 — Product Council task readiness
- ENG-R0-001 — task delivery checklist
- ENG-R0-001 — task design specification
- ENG-R0-001 — task product requirements
- ENG-R0-001 — task QA plan
- ENG-R0-001 — task technical plan
- ENG-R1-001 — Product Council task readiness
- ENG-R1-001 — task delivery checklist
- ENG-R1-001 — task design specification
- ENG-R1-001 — task product requirements
- ENG-R1-001 — task QA plan
- ENG-R1-001 — task technical plan
- ENG-R2-001 — Product Council task readiness
- ENG-R2-001 — task delivery checklist
- ENG-R2-001 — task design specification
- ENG-R2-001 — task product requirements
- ENG-R2-001 — task QA plan
- ENG-R2-001 — task technical plan
- ENG-R2-002 — Product Council task readiness
- ENG-R2-002 — task delivery checklist
- ENG-R2-002 — task design specification
- ENG-R2-002 — task product requirements
- ENG-R2-002 — task QA plan
- ENG-R2-002 — task technical plan
- ENG-R3-001 — Product Council task readiness
- ENG-R3-001 — task delivery checklist
- ENG-R3-001 — task design specification
- ENG-R3-001 — task product requirements
- ENG-R3-001 — task QA plan
- ENG-R3-001 — task technical plan
- ENG-R4-001 — Product Council task readiness
- ENG-R4-001 — task delivery checklist
- ENG-R4-001 — task design specification
- ENG-R4-001 — task product requirements
- ENG-R4-001 — task QA plan
- ENG-R4-001 — task technical plan
- ENG-R4-002 — Product Council task readiness
- ENG-R4-002 — task delivery checklist
- ENG-R4-002 — task design specification
- ENG-R4-002 — task product requirements
- ENG-R4-002 — task QA plan
- ENG-R4-002 — task technical plan
- ENG-R5-001 — Product Council task readiness
- ENG-R5-001 — task delivery checklist
- ENG-R5-001 — task design specification
- ENG-R5-001 — task product requirements
- ENG-R5-001 — task QA plan
- ENG-R5-001 — task technical plan
- ENG-R6-001 — Product Council task readiness
- ENG-R6-001 — task delivery checklist
- ENG-R6-001 — task design specification
- ENG-R6-001 — task product requirements
- ENG-R6-001 — task QA plan
- ENG-R6-001 — task technical plan
- ENG-R7-001 — Product Council task readiness
- ENG-R7-001 — task delivery checklist
- ENG-R7-001 — task design specification
- ENG-R7-001 — task product requirements
- ENG-R7-001 — task QA plan
- ENG-R7-001 — task technical plan
- EVAL-R6-001 — Product Council task readiness
- EVAL-R6-001 — task delivery checklist
- EVAL-R6-001 — task design specification
- EVAL-R6-001 — task product requirements
- EVAL-R6-001 — task QA plan
- EVAL-R6-001 — task technical plan
- EVAL-R7-001 — Product Council task readiness
- EVAL-R7-001 — task delivery checklist
- EVAL-R7-001 — task design specification
- EVAL-R7-001 — task product requirements
- EVAL-R7-001 — task QA plan
- EVAL-R7-001 — task technical plan
- PC-001 — readiness-control hardening Council record
- PC-001 — readiness-control hardening delivery plan
- PC-001 — readiness-control evidence design specification
- PC-001 — readiness-control hardening product requirements
- PC-001 — readiness-control hardening QA plan
- PC-001 — readiness-control hardening technical plan
- PID-R10-001 — Product Council task readiness
- PID-R10-001 — task delivery checklist
- PID-R10-001 — task design specification
- PID-R10-001 — task product requirements
- PID-R10-001 — task QA plan
- PID-R10-001 — task technical plan
- PRD-R0-001 — Product Council task readiness
- PRD-R0-001 — task delivery checklist
- PRD-R0-001 — task design specification
- PRD-R0-001 — task product requirements
- PRD-R0-001 — task QA plan
- PRD-R0-001 — task technical plan
- PRD-R1-001 — Product Council task readiness
- PRD-R1-001 — task delivery checklist
- PRD-R1-001 — task design specification
- PRD-R1-001 — task product requirements
- PRD-R1-001 — task QA plan
- PRD-R1-001 — task technical plan
- PRD-R2-001 — Product Council task readiness
- PRD-R2-001 — task delivery checklist
- PRD-R2-001 — task design specification
- PRD-R2-001 — task product requirements
- PRD-R2-001 — task QA plan
- PRD-R2-001 — task technical plan
- PRD-R3-001 — Product Council task readiness
- PRD-R3-001 — task delivery checklist
- PRD-R3-001 — task design specification
- PRD-R3-001 — task product requirements
- PRD-R3-001 — task QA plan
- PRD-R3-001 — task technical plan
- PRD-R4-001 — Product Council task readiness
- PRD-R4-001 — task delivery checklist
- PRD-R4-001 — task design specification
- PRD-R4-001 — task product requirements
- PRD-R4-001 — task QA plan
- PRD-R4-001 — task technical plan
- PRD-R5-001 — Product Council task readiness
- PRD-R5-001 — task delivery checklist
- PRD-R5-001 — task design specification
- PRD-R5-001 — task product requirements
- PRD-R5-001 — task QA plan
- PRD-R5-001 — task technical plan
- PRD-R6-001 — Product Council task readiness
- PRD-R6-001 — task delivery checklist
- PRD-R6-001 — task design specification
- PRD-R6-001 — task product requirements
- PRD-R6-001 — task QA plan
- PRD-R6-001 — task technical plan
- PRD-R7-001 — Product Council task readiness
- PRD-R7-001 — task delivery checklist
- PRD-R7-001 — task design specification
- PRD-R7-001 — task product requirements
- PRD-R7-001 — task QA plan
- PRD-R7-001 — task technical plan
- PRD-R8-001 — Product Council task readiness
- PRD-R8-001 — task delivery checklist
- PRD-R8-001 — task design specification
- PRD-R8-001 — task product requirements
- PRD-R8-001 — task QA plan
- PRD-R8-001 — task technical plan
- PRD-R9-001 — Product Council task readiness
- PRD-R9-001 — task delivery checklist
- PRD-R9-001 — task design specification
- PRD-R9-001 — task product requirements
- PRD-R9-001 — task QA plan
- PRD-R9-001 — task technical plan
- QA-R8-001 — Product Council task readiness
- QA-R8-001 — task delivery checklist
- QA-R8-001 — task design specification
- QA-R8-001 — task product requirements
- QA-R8-001 — task QA plan
- QA-R8-001 — task technical plan
- QA-R9-001 — Product Council task readiness
- QA-R9-001 — task delivery checklist
- QA-R9-001 — task design specification
- QA-R9-001 — task product requirements
- QA-R9-001 — task QA plan
- QA-R9-001 — task technical plan
- REL-R0-001 — Product Council task readiness
- REL-R0-001 — task delivery checklist
- REL-R0-001 — task design specification
- REL-R0-001 — task product requirements
- REL-R0-001 — task QA plan
- REL-R0-001 — task technical plan
- REL-R1-001 — Product Council task readiness
- REL-R1-001 — task delivery checklist
- REL-R1-001 — task design specification
- REL-R1-001 — task product requirements
- REL-R1-001 — task QA plan
- REL-R1-001 — task technical plan
- REL-R2-001 — Product Council task readiness
- REL-R2-001 — task delivery checklist
- REL-R2-001 — task design specification
- REL-R2-001 — task product requirements
- REL-R2-001 — task QA plan
- REL-R2-001 — task technical plan
- REL-R3-001 — Product Council task readiness
- REL-R3-001 — task delivery checklist
- REL-R3-001 — task design specification
- REL-R3-001 — task product requirements
- REL-R3-001 — task QA plan
- REL-R3-001 — task technical plan
- REL-R4-001 — Product Council task readiness
- REL-R4-001 — task delivery checklist
- REL-R4-001 — task design specification
- REL-R4-001 — task product requirements
- REL-R4-001 — task QA plan
- REL-R4-001 — task technical plan
- REL-R5-001 — Product Council task readiness
- REL-R5-001 — task delivery checklist
- REL-R5-001 — task design specification
- REL-R5-001 — task product requirements
- REL-R5-001 — task QA plan
- REL-R5-001 — task technical plan
- REL-R6-001 — Product Council task readiness
- REL-R6-001 — task delivery checklist
- REL-R6-001 — task design specification
- REL-R6-001 — task product requirements
- REL-R6-001 — task QA plan
- REL-R6-001 — task technical plan
- REL-R7-001 — Product Council task readiness
- REL-R7-001 — task delivery checklist
- REL-R7-001 — task design specification
- REL-R7-001 — task product requirements
- REL-R7-001 — task QA plan
- REL-R7-001 — task technical plan
- REL-R8-001 — Product Council task readiness
- REL-R8-001 — task delivery checklist
- REL-R8-001 — task design specification
- REL-R8-001 — task product requirements
- REL-R8-001 — task QA plan
- REL-R8-001 — task technical plan
- REL-R9-001 — Product Council task readiness
- REL-R9-001 — task delivery checklist
- REL-R9-001 — task design specification
- REL-R9-001 — task product requirements
- REL-R9-001 — task QA plan
- REL-R9-001 — task technical plan
- REL-R10-001 — Product Council task readiness
- REL-R10-001 — task delivery checklist
- REL-R10-001 — task design specification
- REL-R10-001 — task product requirements
- REL-R10-001 — task QA plan
- REL-R10-001 — task technical plan
- SPK-R0-001 — Product Council task readiness
- SPK-R0-001 — task delivery checklist
- SPK-R0-001 — task design specification
- SPK-R0-001 — task product requirements
- SPK-R0-001 — task QA plan
- SPK-R0-001 — task technical plan
- SPK-R5-001 — Product Council task readiness
- SPK-R5-001 — task delivery checklist
- SPK-R5-001 — task design specification
- SPK-R5-001 — task product requirements
- SPK-R5-001 — task QA plan
- SPK-R5-001 — task technical plan
- UX-R0-001 — Product Council task readiness
- UX-R0-001 — task delivery checklist
- UX-R0-001 — task design specification
- UX-R0-001 — task product requirements
- UX-R0-001 — task QA plan
- UX-R0-001 — task technical plan
- UX-R1-001 — Product Council task readiness
- UX-R1-001 — task delivery checklist
- UX-R1-001 — task design specification
- UX-R1-001 — task product requirements
- UX-R1-001 — task QA plan
- UX-R1-001 — task technical plan
- UX-R2-001 — Product Council task readiness
- UX-R2-001 — task delivery checklist
- UX-R2-001 — task design specification
- UX-R2-001 — task product requirements
- UX-R2-001 — task QA plan
- UX-R2-001 — task technical plan
- UX-R3-001 — Product Council task readiness
- UX-R3-001 — task delivery checklist
- UX-R3-001 — task design specification
- UX-R3-001 — task product requirements
- UX-R3-001 — task QA plan
- UX-R3-001 — task technical plan
- UX-R4-001 — Product Council task readiness
- UX-R4-001 — task delivery checklist
- UX-R4-001 — task design specification
- UX-R4-001 — task product requirements
- UX-R4-001 — task QA plan
- UX-R4-001 — task technical plan
- UX-R5-001 — Product Council task readiness
- UX-R5-001 — task delivery checklist
- UX-R5-001 — task design specification
- UX-R5-001 — task product requirements
- UX-R5-001 — task QA plan
- UX-R5-001 — task technical plan
- UX-R6-001 — Product Council task readiness
- UX-R6-001 — task delivery checklist
- UX-R6-001 — task design specification
- UX-R6-001 — task product requirements
- UX-R6-001 — task QA plan
- UX-R6-001 — task technical plan
- UX-R7-001 — Product Council task readiness
- UX-R7-001 — task delivery checklist
- UX-R7-001 — task design specification
- UX-R7-001 — task product requirements
- UX-R7-001 — task QA plan
- UX-R7-001 — task technical plan
- Life in Days — document index
- Life in Days
- Life in Days - Running Log
- Publication provenance
- Pull-Request-Template
- Life in Days
- Security and privacy reporting