-
Notifications
You must be signed in to change notification settings - Fork 0
Prototype Handoff v2
Canonical source:
docs/prototypes/CALENDAR-UI-PROTOTYPE-v2.md· Snapshot commit:b9f2813f22e4
Status: active throwaway design exploration on branch prototype/calendar-ui-v2-margin-companion
The runnable prototype is documented in prototypes/calendar-ui/README-v2.md. It carries the selected Margin Companion reflection pattern across all three calendar structures while keeping their navigation and memory-recall hypotheses distinct.
The v2 hypothesis is that generated interpretation should read like a quiet editorial companion, not an administrative form. A Journal Day therefore presents its generated title and summary as one prose composition, with a single AI provenance statement, a plain Topics list, and one Manage reflection action in a narrow margin rail.
The authentic record remains downstream and separately labeled. Generated interpretation never masquerades as source truth, but provenance is stated once rather than repeated in a badge on every field.
Run the local prototype and use these versioned routes:
| Key | Direction | Route | Structural hypothesis |
|---|---|---|---|
| A | Archive Desk | index-v2.html?variant=A |
A month calendar plus persistent selected-day preview makes revisiting fast while the full Journal Day stays calm and readable. |
| B | Living Mosaic | index-v2.html?variant=B |
An image-led month and spacious day composition create stronger visual recognition without obscuring provenance. |
| C | Monthly Almanac | index-v2.html?variant=C |
Continuous, book-like chapters make a month feel reflective; each chapter opens with the Margin Companion before media and authentic journals. |
All routes use the same fictional fixture data, so differences in hierarchy and emotional tone can be compared without content drift.
- Reading mode has no separate generated Title, Summary, and Tags boxes.
- Title and summary occupy the primary prose column.
- One margin rail carries the group-level AI origin, Topics list, and Manage reflection action.
- Topics are plain list items, not pill controls.
- A stale generated field announces that a suggestion is available and that the current protected version is unchanged.
- Review update opens a current-versus-newest comparison; generated content is never silently substituted.
- On narrow screens the margin information and prose collapse into a linear reading order rather than card stacks.
The management surface is intentionally separated from reading mode. It opens as a right-side sheet on larger viewports and a full-width sheet on narrow viewports. Title, Summary, and Tags retain independent status and edit actions.
The simulated stale-summary flow offers three choices: keep the current protected version, edit the current version, or use the newest generated suggestion. Saving an edit protects that field from silent refresh. Automatic updates resume only when that action is selected explicitly.
The implemented interaction model includes:
- dialog naming and modal semantics;
- focus entry into the sheet;
- keyboard focus containment while it is open;
- Escape-to-close;
- an inert background;
- focus restoration to the originating Manage reflection control;
- visible focus treatment and responsive single-column behavior.
From prototypes/calendar-ui/:
npm run check:v2
npm run prototypeThe first command syntax-checks the versioned application and local server. The second serves the prototype at http://127.0.0.1:4173/; append any route from the table above.
The following v2 image files were captured in docs/prototypes/v2/ and compared against the selected reference:
archive-desk-v2.pngliving-mosaic-v2.pngmonthly-almanac-v2.pngmanage-reflection-v2.pngreflection-update-v2.pngreflection-mobile-v2.png
The selected visual reference is option-2-margin-companion-v2-reference.png.
The combined comparison is margin-companion-v2-design-qa-comparison.png, and the executed review record is ../../design-qa-v2.md.
This is a dependency-light, in-memory prototype using synthetic journal text and synthetic image fixtures. It does not connect to VoiceNotes, Telegram, an AI provider, a database, authentication, storage, backup, Cloudflare, Hetzner, or life.arunp.in. It neither sends data nor persists simulated changes.
No ingestion, privacy guarantee, AI behavior, production architecture, hosting, deployment, or operational readiness is implemented or verified by this artifact. Production code remains a separate, approval-gated implementation step.
Generated from arunpr614/Life-Reflection@6b8b70b72148 · Canonical content lives in Git · Fictional prototype data only
- Life in Days — Hetzner shared-host runbook
- Life in Days — Phase1 implementation plan
- PID R10 — Conditional Object-Store Transition
- PRD R0 — Shared-Host Private Foundation
- PRD R1 — Manual Journal Archive
- PRD R2 — Telegram Photo Capture
- PRD R3 — Retrieval and Date Integrity
- PRD R4 — Source History and Lifecycle Safety
- PRD R5 — Prospective VoiceNotes Sync
- PRD R6 — Generated Text Reflection
- PRD R7 — Generated Artwork
- PRD R8 — Operational Scale and Resilience
- PRD R9 — Private Launch Acceptance and Stabilization
- Life in Days release documents
- Life in Days Phase 1 — AI agent resource index
- Codex Goal prompt — Phase 1 P0 requirements to private production
- P0 Codex Gold Goal prompt — complete P0 and R0 only
- Phase 1 GitHub Project V2 sync
- Life in Days — Phase 1 Release Plan
- Life in Days — detailed implementation plan
- Life in Days Global PRD
- Life in Days — project tracker
- Life in Days — prototype completeness tracker
- Life in Days — requirements traceability
- Life in Days — UX specification
- Life in Days — AI Artwork Model Evaluation
- Life in Days — AI Text Model Evaluation
- Initial product brief
- Life in Days: Private Media Storage Evaluation
- Requirements under discovery
- Product and integration research
- Project Git provenance
- Life in Days — proposed shared understanding
- Life in Days — Product Council planning-baseline review
- Life in Days Phase 1 — Independent QA Lead charter
- Agent charter — Project Manager
- Agent charter — Senior Product Manager
- Agent charter — Technical Architect
- Agent charter — UI/UX Design Lead
- Life in Days Phase 1 — P0 Owner Action Ledger
- Life in Days Phase 1 — P0 execution context digest
- Life in Days Phase 1 — P0 execution authorization addendum
- Life in Days Phase 1 — P0 execution council charter
- Life in Days Phase 1 — P0 execution decision ledger
- Life in Days Phase 1 — P0 task Definition of Ready
- Life in Days Phase 1 — P0 execution-control review
- P0/R0 Stage 0 control-repair candidate review dossier
- P0/R0 Stage 0 delivery checklist
- P0/R0 Stage 0 rollback and recovery plan
- P0/R0 Stage 0 state contract
- P0/R0 Stage 0 test plan
- PC-001 readiness-control hardening — planning review
- Life in Days — Phase 1 Product Council Decision Record
- Life in Days Phase 1 — source baseline
- Life in Days Phase 1 — Product Council charter
- Life in Days — Product Manager Council Review
- Life in Days — Project Manager Council Review
- Life in Days — Product Council UX Design Review
- Life in Days Product Council
- Life in Days — calendar UI prototype
- Life in Days — calendar UI prototype v2
- Life in Days — unified Calendar and Almanac prototype v3
- Life in Days — Museum Margin Calendar prototype v4
- Life in Days — private Settings and compact privacy prototype v5
- Life in Days — private Search prototype v6
- Life in Days — Calendar contract prototype v7
- Life in Days — Cross-month Almanac prototype v8
- Life in Days — First-use Readiness prototype v9
- Life in Days — Resilient Application Shell prototype v10
- Life in Days calendar UI prototype
- Life in Days calendar UI prototype v2
- Life in Days unified calendar prototype v3
- Life in Days Museum Margin prototype v4
- Life in Days Settings prototype v5
- Life in Days — private Search prototype v6
- Life in Days prototype v7 — Calendar contract completion
- Life in Days prototype v8 — Cross-month Almanac
- Life in Days prototype v9 — First-use Readiness
- Life in Days prototype v10 — Resilient Application Shell
- v6 Product Council contract — Private Search State
- Life in Days prototype v7 — Product Council contract
- Life in Days prototype v8 — Product Council contract
- Life in Days prototype v9 — Product Council contract
- Life in Days prototype v10 — Product Council contract
- Life in Days v2 — design QA
- Life in Days unified prototype v3 — design QA
- Life in Days v4 — design QA
- Life in Days v5 design QA
- Life in Days v5 design QA
- Life in Days v6 — independent design and interaction QA
- Life in Days v7 — independent design and interaction QA
- Life in Days prototype v8 — independent design QA
- Life in Days prototype v9 — independent design QA
- Life in Days prototype v10 — independent design QA
- Life in Days prototype v5 — PRD feature audit
- AI agent operating contract — keep Phase 1 alive
- Contributing to Life in Days
- GitHub Projects Roadmap — current capability research
- Life in Days — Hetzner shared-host deployment spike
- Wayfinder for Life in Days Phase 1 — adoption and GitHub integration report
- Life in Days — GitHub Projects Roadmap design spike
- ARCH-R0-001 — Product Council task readiness
- ARCH-R0-001 — task delivery checklist
- ARCH-R0-001 — task design specification
- ARCH-R0-001 — task product requirements
- ARCH-R0-001 — task QA plan
- ARCH-R0-001 — task technical plan
- ARCH-R1-001 — Product Council task readiness
- ARCH-R1-001 — task delivery checklist
- ARCH-R1-001 — task design specification
- ARCH-R1-001 — task product requirements
- ARCH-R1-001 — task QA plan
- ARCH-R1-001 — task technical plan
- ARCH-R2-001 — Product Council task readiness
- ARCH-R2-001 — task delivery checklist
- ARCH-R2-001 — task design specification
- ARCH-R2-001 — task product requirements
- ARCH-R2-001 — task QA plan
- ARCH-R2-001 — task technical plan
- ARCH-R3-001 — Product Council task readiness
- ARCH-R3-001 — task delivery checklist
- ARCH-R3-001 — task design specification
- ARCH-R3-001 — task product requirements
- ARCH-R3-001 — task QA plan
- ARCH-R3-001 — task technical plan
- ARCH-R4-001 — Product Council task readiness
- ARCH-R4-001 — task delivery checklist
- ARCH-R4-001 — task design specification
- ARCH-R4-001 — task product requirements
- ARCH-R4-001 — task QA plan
- ARCH-R4-001 — task technical plan
- ARCH-R5-001 — Product Council task readiness
- ARCH-R5-001 — task delivery checklist
- ARCH-R5-001 — task design specification
- ARCH-R5-001 — task product requirements
- ARCH-R5-001 — task QA plan
- ARCH-R5-001 — task technical plan
- ARCH-R6-001 — Product Council task readiness
- ARCH-R6-001 — task delivery checklist
- ARCH-R6-001 — task design specification
- ARCH-R6-001 — task product requirements
- ARCH-R6-001 — task QA plan
- ARCH-R6-001 — task technical plan
- ARCH-R7-001 — Product Council task readiness
- ARCH-R7-001 — task delivery checklist
- ARCH-R7-001 — task design specification
- ARCH-R7-001 — task product requirements
- ARCH-R7-001 — task QA plan
- ARCH-R7-001 — task technical plan
- ARCH-R8-001 — Product Council task readiness
- ARCH-R8-001 — task delivery checklist
- ARCH-R8-001 — task design specification
- ARCH-R8-001 — task product requirements
- ARCH-R8-001 — task QA plan
- ARCH-R8-001 — task technical plan
- ARCH-R10-001 — Product Council task readiness
- ARCH-R10-001 — task delivery checklist
- ARCH-R10-001 — task design specification
- ARCH-R10-001 — task product requirements
- ARCH-R10-001 — task QA plan
- ARCH-R10-001 — task technical plan
- AUD-001 — Product Council task readiness
- AUD-001 — task delivery checklist
- AUD-001 — task design specification
- AUD-001 — task product requirements
- AUD-001 — task QA plan
- AUD-001 — task technical plan
- ENG-R0-001 — Product Council task readiness
- ENG-R0-001 — task delivery checklist
- ENG-R0-001 — task design specification
- ENG-R0-001 — task product requirements
- ENG-R0-001 — task QA plan
- ENG-R0-001 — task technical plan
- ENG-R1-001 — Product Council task readiness
- ENG-R1-001 — task delivery checklist
- ENG-R1-001 — task design specification
- ENG-R1-001 — task product requirements
- ENG-R1-001 — task QA plan
- ENG-R1-001 — task technical plan
- ENG-R2-001 — Product Council task readiness
- ENG-R2-001 — task delivery checklist
- ENG-R2-001 — task design specification
- ENG-R2-001 — task product requirements
- ENG-R2-001 — task QA plan
- ENG-R2-001 — task technical plan
- ENG-R2-002 — Product Council task readiness
- ENG-R2-002 — task delivery checklist
- ENG-R2-002 — task design specification
- ENG-R2-002 — task product requirements
- ENG-R2-002 — task QA plan
- ENG-R2-002 — task technical plan
- ENG-R3-001 — Product Council task readiness
- ENG-R3-001 — task delivery checklist
- ENG-R3-001 — task design specification
- ENG-R3-001 — task product requirements
- ENG-R3-001 — task QA plan
- ENG-R3-001 — task technical plan
- ENG-R4-001 — Product Council task readiness
- ENG-R4-001 — task delivery checklist
- ENG-R4-001 — task design specification
- ENG-R4-001 — task product requirements
- ENG-R4-001 — task QA plan
- ENG-R4-001 — task technical plan
- ENG-R4-002 — Product Council task readiness
- ENG-R4-002 — task delivery checklist
- ENG-R4-002 — task design specification
- ENG-R4-002 — task product requirements
- ENG-R4-002 — task QA plan
- ENG-R4-002 — task technical plan
- ENG-R5-001 — Product Council task readiness
- ENG-R5-001 — task delivery checklist
- ENG-R5-001 — task design specification
- ENG-R5-001 — task product requirements
- ENG-R5-001 — task QA plan
- ENG-R5-001 — task technical plan
- ENG-R6-001 — Product Council task readiness
- ENG-R6-001 — task delivery checklist
- ENG-R6-001 — task design specification
- ENG-R6-001 — task product requirements
- ENG-R6-001 — task QA plan
- ENG-R6-001 — task technical plan
- ENG-R7-001 — Product Council task readiness
- ENG-R7-001 — task delivery checklist
- ENG-R7-001 — task design specification
- ENG-R7-001 — task product requirements
- ENG-R7-001 — task QA plan
- ENG-R7-001 — task technical plan
- EVAL-R6-001 — Product Council task readiness
- EVAL-R6-001 — task delivery checklist
- EVAL-R6-001 — task design specification
- EVAL-R6-001 — task product requirements
- EVAL-R6-001 — task QA plan
- EVAL-R6-001 — task technical plan
- EVAL-R7-001 — Product Council task readiness
- EVAL-R7-001 — task delivery checklist
- EVAL-R7-001 — task design specification
- EVAL-R7-001 — task product requirements
- EVAL-R7-001 — task QA plan
- EVAL-R7-001 — task technical plan
- PC-001 — readiness-control hardening Council record
- PC-001 — readiness-control hardening delivery plan
- PC-001 — readiness-control evidence design specification
- PC-001 — readiness-control hardening product requirements
- PC-001 — readiness-control hardening QA plan
- PC-001 — readiness-control hardening technical plan
- PID-R10-001 — Product Council task readiness
- PID-R10-001 — task delivery checklist
- PID-R10-001 — task design specification
- PID-R10-001 — task product requirements
- PID-R10-001 — task QA plan
- PID-R10-001 — task technical plan
- PRD-R0-001 — Product Council task readiness
- PRD-R0-001 — task delivery checklist
- PRD-R0-001 — task design specification
- PRD-R0-001 — task product requirements
- PRD-R0-001 — task QA plan
- PRD-R0-001 — task technical plan
- PRD-R1-001 — Product Council task readiness
- PRD-R1-001 — task delivery checklist
- PRD-R1-001 — task design specification
- PRD-R1-001 — task product requirements
- PRD-R1-001 — task QA plan
- PRD-R1-001 — task technical plan
- PRD-R2-001 — Product Council task readiness
- PRD-R2-001 — task delivery checklist
- PRD-R2-001 — task design specification
- PRD-R2-001 — task product requirements
- PRD-R2-001 — task QA plan
- PRD-R2-001 — task technical plan
- PRD-R3-001 — Product Council task readiness
- PRD-R3-001 — task delivery checklist
- PRD-R3-001 — task design specification
- PRD-R3-001 — task product requirements
- PRD-R3-001 — task QA plan
- PRD-R3-001 — task technical plan
- PRD-R4-001 — Product Council task readiness
- PRD-R4-001 — task delivery checklist
- PRD-R4-001 — task design specification
- PRD-R4-001 — task product requirements
- PRD-R4-001 — task QA plan
- PRD-R4-001 — task technical plan
- PRD-R5-001 — Product Council task readiness
- PRD-R5-001 — task delivery checklist
- PRD-R5-001 — task design specification
- PRD-R5-001 — task product requirements
- PRD-R5-001 — task QA plan
- PRD-R5-001 — task technical plan
- PRD-R6-001 — Product Council task readiness
- PRD-R6-001 — task delivery checklist
- PRD-R6-001 — task design specification
- PRD-R6-001 — task product requirements
- PRD-R6-001 — task QA plan
- PRD-R6-001 — task technical plan
- PRD-R7-001 — Product Council task readiness
- PRD-R7-001 — task delivery checklist
- PRD-R7-001 — task design specification
- PRD-R7-001 — task product requirements
- PRD-R7-001 — task QA plan
- PRD-R7-001 — task technical plan
- PRD-R8-001 — Product Council task readiness
- PRD-R8-001 — task delivery checklist
- PRD-R8-001 — task design specification
- PRD-R8-001 — task product requirements
- PRD-R8-001 — task QA plan
- PRD-R8-001 — task technical plan
- PRD-R9-001 — Product Council task readiness
- PRD-R9-001 — task delivery checklist
- PRD-R9-001 — task design specification
- PRD-R9-001 — task product requirements
- PRD-R9-001 — task QA plan
- PRD-R9-001 — task technical plan
- QA-R8-001 — Product Council task readiness
- QA-R8-001 — task delivery checklist
- QA-R8-001 — task design specification
- QA-R8-001 — task product requirements
- QA-R8-001 — task QA plan
- QA-R8-001 — task technical plan
- QA-R9-001 — Product Council task readiness
- QA-R9-001 — task delivery checklist
- QA-R9-001 — task design specification
- QA-R9-001 — task product requirements
- QA-R9-001 — task QA plan
- QA-R9-001 — task technical plan
- REL-R0-001 — Product Council task readiness
- REL-R0-001 — task delivery checklist
- REL-R0-001 — task design specification
- REL-R0-001 — task product requirements
- REL-R0-001 — task QA plan
- REL-R0-001 — task technical plan
- REL-R1-001 — Product Council task readiness
- REL-R1-001 — task delivery checklist
- REL-R1-001 — task design specification
- REL-R1-001 — task product requirements
- REL-R1-001 — task QA plan
- REL-R1-001 — task technical plan
- REL-R2-001 — Product Council task readiness
- REL-R2-001 — task delivery checklist
- REL-R2-001 — task design specification
- REL-R2-001 — task product requirements
- REL-R2-001 — task QA plan
- REL-R2-001 — task technical plan
- REL-R3-001 — Product Council task readiness
- REL-R3-001 — task delivery checklist
- REL-R3-001 — task design specification
- REL-R3-001 — task product requirements
- REL-R3-001 — task QA plan
- REL-R3-001 — task technical plan
- REL-R4-001 — Product Council task readiness
- REL-R4-001 — task delivery checklist
- REL-R4-001 — task design specification
- REL-R4-001 — task product requirements
- REL-R4-001 — task QA plan
- REL-R4-001 — task technical plan
- REL-R5-001 — Product Council task readiness
- REL-R5-001 — task delivery checklist
- REL-R5-001 — task design specification
- REL-R5-001 — task product requirements
- REL-R5-001 — task QA plan
- REL-R5-001 — task technical plan
- REL-R6-001 — Product Council task readiness
- REL-R6-001 — task delivery checklist
- REL-R6-001 — task design specification
- REL-R6-001 — task product requirements
- REL-R6-001 — task QA plan
- REL-R6-001 — task technical plan
- REL-R7-001 — Product Council task readiness
- REL-R7-001 — task delivery checklist
- REL-R7-001 — task design specification
- REL-R7-001 — task product requirements
- REL-R7-001 — task QA plan
- REL-R7-001 — task technical plan
- REL-R8-001 — Product Council task readiness
- REL-R8-001 — task delivery checklist
- REL-R8-001 — task design specification
- REL-R8-001 — task product requirements
- REL-R8-001 — task QA plan
- REL-R8-001 — task technical plan
- REL-R9-001 — Product Council task readiness
- REL-R9-001 — task delivery checklist
- REL-R9-001 — task design specification
- REL-R9-001 — task product requirements
- REL-R9-001 — task QA plan
- REL-R9-001 — task technical plan
- REL-R10-001 — Product Council task readiness
- REL-R10-001 — task delivery checklist
- REL-R10-001 — task design specification
- REL-R10-001 — task product requirements
- REL-R10-001 — task QA plan
- REL-R10-001 — task technical plan
- SPK-R0-001 — Product Council task readiness
- SPK-R0-001 — task delivery checklist
- SPK-R0-001 — task design specification
- SPK-R0-001 — task product requirements
- SPK-R0-001 — task QA plan
- SPK-R0-001 — task technical plan
- SPK-R5-001 — Product Council task readiness
- SPK-R5-001 — task delivery checklist
- SPK-R5-001 — task design specification
- SPK-R5-001 — task product requirements
- SPK-R5-001 — task QA plan
- SPK-R5-001 — task technical plan
- UX-R0-001 — Product Council task readiness
- UX-R0-001 — task delivery checklist
- UX-R0-001 — task design specification
- UX-R0-001 — task product requirements
- UX-R0-001 — task QA plan
- UX-R0-001 — task technical plan
- UX-R1-001 — Product Council task readiness
- UX-R1-001 — task delivery checklist
- UX-R1-001 — task design specification
- UX-R1-001 — task product requirements
- UX-R1-001 — task QA plan
- UX-R1-001 — task technical plan
- UX-R2-001 — Product Council task readiness
- UX-R2-001 — task delivery checklist
- UX-R2-001 — task design specification
- UX-R2-001 — task product requirements
- UX-R2-001 — task QA plan
- UX-R2-001 — task technical plan
- UX-R3-001 — Product Council task readiness
- UX-R3-001 — task delivery checklist
- UX-R3-001 — task design specification
- UX-R3-001 — task product requirements
- UX-R3-001 — task QA plan
- UX-R3-001 — task technical plan
- UX-R4-001 — Product Council task readiness
- UX-R4-001 — task delivery checklist
- UX-R4-001 — task design specification
- UX-R4-001 — task product requirements
- UX-R4-001 — task QA plan
- UX-R4-001 — task technical plan
- UX-R5-001 — Product Council task readiness
- UX-R5-001 — task delivery checklist
- UX-R5-001 — task design specification
- UX-R5-001 — task product requirements
- UX-R5-001 — task QA plan
- UX-R5-001 — task technical plan
- UX-R6-001 — Product Council task readiness
- UX-R6-001 — task delivery checklist
- UX-R6-001 — task design specification
- UX-R6-001 — task product requirements
- UX-R6-001 — task QA plan
- UX-R6-001 — task technical plan
- UX-R7-001 — Product Council task readiness
- UX-R7-001 — task delivery checklist
- UX-R7-001 — task design specification
- UX-R7-001 — task product requirements
- UX-R7-001 — task QA plan
- UX-R7-001 — task technical plan
- Life in Days — document index
- Life in Days
- Life in Days - Running Log
- Publication provenance
- Pull-Request-Template
- Life in Days
- Security and privacy reporting