You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
bjornburton edited this page Aug 19, 2016
·
2 revisions
New nacelle seals have been installed.
Two new bales installed onto larboard nacelle.
The FS-IA6 receiver checks out on the scope.
New MOSFETs have been added to H-Bridge.
Assembled simple depth rig for sensor.
The original pressure-sensor failed after some minutes!
A new sensor was ordered, tested and the depth/voltage has been plotted.