Skip to content
bjornburton edited this page Aug 19, 2016 · 2 revisions

New nacelle seals have been installed.

Two new bales installed onto larboard nacelle.

The FS-IA6 receiver checks out on the scope.

New MOSFETs have been added to H-Bridge.

Assembled simple depth rig for sensor. The original pressure-sensor failed after some minutes! A new sensor was ordered, tested and the depth/voltage has been plotted.

Clone this wiki locally