Repository navigation
Product Specifications
Joseph Roberts edited this page Oct 16, 2026
·
8 revisions
These are the canonical mutable product specifications. Read only the pages relevant to the current ticket and preserve each page's approval and dependency boundaries. Repository code, assets, fixtures, mockups, and catalog machinery remain in the repository. Recorded labels below preserve source status and qualifications; they do not imply independent implementation verification.
| Specification | Scope | Recorded status / qualifications | Key dependencies |
|---|---|---|---|
| Delivery Goals and roadmap readiness | Phase-scoped goals and structural readiness | Delivered contract; completed RR-R10 is not an active assignment | Dashboard design; ADR-001; ADR-003; retained repository mockups |
| Agent-driven delivery dashboard | Whole product dashboard and lifecycle behavior | Current product design; individual proposals retain their own qualifications | Accepted ADRs and ticket-specific decisions |
| Managed repository documentation | Managed documentation product behavior | Active delivered contract; later amendments retain their own boundaries | ADR-006 records the accepted M1 architecture; later source/adoption boundaries remain separate |
| Project execution | Opt-in app-owned execution | Current contract; grants no live execution authority; named acceptance remains pending | ADR-008; open issues linked from the specification |
| Active phase selection | Active-phase authority and UI | Delivered contract | ADR-001; ADR-003 |
| Codex plugin lifecycle | Managed local plugin lifecycle | Approved | ADR-002; installed/runtime state remains separately verified |
| Delivery Goals Phase Board | Goals and Phase Board presentation | Delivered contract | Delivery Goals/readiness specification; retained repository mockups |
| Ticket Tasks | App-owned per-ticket task plans and presentation | Owner-approved product contract | ADR-005 records the accepted exact planning package; current delivery remains ticket-owned |
| Repository plan reconstruction | One-time plan reconstruction | Product decisions approved; implementation and publication retain stated dependencies | Managed-documentation reconciliation and linked design prerequisites |
| Shared Execution V1 | Shared execution compatibility contract | Active source specification; adoption/runtime proof remain separate | ADR-001, ADR-002, ADR-006, ADR-007 |
- Portable continuity V2: retained Phase 7 design for complete project export/import. The owner approved V2 state preservation and content access independent of a checkout on October 16, 2026. Formal ADR reconciliation remains; encoding and recovery are proposed, not delivered.
- Product Specifications
- Architecture Decisions
- Development Standards
- Implementation Plans
- Research