Skip to content

Product Specifications

Joseph Roberts edited this page Oct 16, 2026 · 8 revisions

These are the canonical mutable product specifications. Read only the pages relevant to the current ticket and preserve each page's approval and dependency boundaries. Repository code, assets, fixtures, mockups, and catalog machinery remain in the repository. Recorded labels below preserve source status and qualifications; they do not imply independent implementation verification.

Specification Scope Recorded status / qualifications Key dependencies
Delivery Goals and roadmap readiness Phase-scoped goals and structural readiness Delivered contract; completed RR-R10 is not an active assignment Dashboard design; ADR-001; ADR-003; retained repository mockups
Agent-driven delivery dashboard Whole product dashboard and lifecycle behavior Current product design; individual proposals retain their own qualifications Accepted ADRs and ticket-specific decisions
Managed repository documentation Managed documentation product behavior Active delivered contract; later amendments retain their own boundaries ADR-006 records the accepted M1 architecture; later source/adoption boundaries remain separate
Project execution Opt-in app-owned execution Current contract; grants no live execution authority; named acceptance remains pending ADR-008; open issues linked from the specification
Active phase selection Active-phase authority and UI Delivered contract ADR-001; ADR-003
Codex plugin lifecycle Managed local plugin lifecycle Approved ADR-002; installed/runtime state remains separately verified
Delivery Goals Phase Board Goals and Phase Board presentation Delivered contract Delivery Goals/readiness specification; retained repository mockups
Ticket Tasks App-owned per-ticket task plans and presentation Owner-approved product contract ADR-005 records the accepted exact planning package; current delivery remains ticket-owned
Repository plan reconstruction One-time plan reconstruction Product decisions approved; implementation and publication retain stated dependencies Managed-documentation reconciliation and linked design prerequisites
Shared Execution V1 Shared execution compatibility contract Active source specification; adoption/runtime proof remain separate ADR-001, ADR-002, ADR-006, ADR-007

Proposed future behavior

  • Portable continuity V2: retained Phase 7 design for complete project export/import. The owner approved V2 state preservation and content access independent of a checkout on October 16, 2026. Formal ADR reconciliation remains; encoding and recovery are proposed, not delivered.

Clone this wiki locally