Spec Ticket Tasks

Release Radar Developer edited this page Oct 2, 2026 · 4 revisions
  • Status: owner-approved product contract; post-MDCP execution alignment authorized 2026-09-02
  • Date: 2026-08-30
  • Governing delivery phase: release-radar-post-mvp-remediation
  • Governing ticket: RR-R10
  • Delivered task-storage foundation: additive schema v12; installed store schema v13; through-Task-7 candidate schema v14
  • Architecture decision: ADR-005

Product outcome

Release Radar will add a first-class app-owned per-ticket section named Tasks. A task plan makes the bounded work required for one non-atomic ticket explicit without turning repository documents, Git state, tests, Codex goals, or an agent's execution state into delivery authority.

Atomic tickets may have no task plan. Once a ticket has a plan, every active task is required. An incomplete active task blocks that ticket's transition to Accepted. Completing every task changes neither the ticket lane nor its review or acceptance state: review requests and owner acceptance remain explicit, separate actions.

Controlling references

The approved five-lane Phase Board, ticket-card hierarchy, density behavior, and selected-ticket inspector remain the visual baseline. Ticket Tasks add work-plan context; they do not add a lane, change Delivery Goal meaning, or replace dependencies, blockers, evidence, review, or acceptance.

Vocabulary and authority

Ticket task plan

An app-owned, optional, revisioned plan for exactly one ticket. A plan has its own optimistic revision and owns an ordered set of ticket tasks. The plan is not a phase plan and its revision is independent of the phase-plan structural revision.

Ticket task

A required unit of work inside a ticket task plan. Each task has:

  • a stable machine ID, distinct from all owner-visible text;
  • a stable visible label such as Task 3 or Task 1B;
  • a meaningful verb-led owner-visible title;
  • deterministic order;
  • completion pending or completed; and
  • lifecycle active or superseded.

Completion and lifecycle are independent. Superseding a task preserves whether it was pending or completed. IDs are never reused and rows are never hard- deleted. A task's visible label is immutable after creation. Completed task definitions are immutable; later correction or rework is a new task.

Non-authoritative inputs

Git commits, Markdown plans and briefs, tests, observed Codex goals, Codex thread state, repository status, and execution progress may be attached as evidence, but none can create, revise, complete, supersede, or accept a task. Only typed app-owned requests through the audited store transaction have that authority. Runtime code never parses this or another document to manufacture a task plan.

Owner-visible contract

Ticket Details

The selected-ticket inspector contains a section titled exactly Tasks.

  • No plan: show No task plan. Do not render an empty checklist or zero count.
  • Loaded plan: show active, non-superseded tasks in deterministic order.
  • Load unavailable: show Tasks unavailable with the existing actionable store reload/recovery treatment. PhaseBoardView, which constructs TicketDetailView and owns the existing reload action, passes that callback into this treatment so the owner can retry without a new task-specific reload mechanism. Do not render stale tasks as current.
  • Superseded tasks are retained in the store and audit history but excluded from the visible active list.

Each visible row is read-only and formatted as:

[checked or unchecked box shape] [stable visible label]: [meaningful verb-led title]

The box is a status indicator, not a control. There is no redundant visible Completed or Pending text. The section has no completed/total aggregate, percentage, progress bar, estimated effort, or persisted level of effort.

Ticket cards

A card whose task plan loaded successfully shows a neutral checklist glyph and the total count of active, non-superseded tasks only, for example:

☷ 7

The card never shows 2/7, a percentage, or completion-colored progress. No completed/total fraction is ever rendered or announced by the card, Ticket Details, or accessibility. The only card task signal is ☷ N, where N is the active, non-superseded total. The signal is omitted when the ticket has no plan or task loading is unavailable. It appears alongside the existing dependency and blocker signals and remains neutral in every lane.

The card count and Ticket Details list are derived in one dashboard load from the same canonical active task rows. The count is never separately persisted. Adding one active task increases both list length and card count. Superseding one decreases both. Completing a task changes its row indicator but not the card count.

The projection is an explicit tri-state value, never nested optionals or an empty-array convention:

enum TicketTaskPlanProjection {
    case noPlan
    case loaded(plan: LoadedTicketTaskPlanProjection)
    case unavailable(recovery: TaskPlanRecoveryProjection)
}

Only loaded supplies task rows or a card count. noPlan supplies the deliberate atomic-ticket copy and no card signal. unavailable supplies actionable recovery and no card signal; it never degrades to noPlan or a stale count.

A task-row query failure is isolated to that ticket's task projection: return unavailable(recovery:), discard any previously projected task rows/count, and keep the rest of the phase board usable from its successfully loaded canonical data. The failure neither converts the ticket to noPlan nor replaces the whole board with a task-specific error.

Wide and compact behavior

  • Wide cards keep the current ticket ID/outcome hierarchy. Their metadata row is ordered exactly task count, dependency count, blocker count, with a system hairline vertical separator and 8–11 points of spacing between adjacent present signals, with no leading/trailing separator. The task glyph is neutral; dependency remains secondary and blocker remains red, matching the current mockup language.
  • Compact cards retain the task signal even when outcome text is omitted; the signal uses the same active count as wide cards.
  • Narrow layout priority is ticket identity, blocker, dependency, task count, then outcome. Identity and every present metadata signal remain visible; outcome is omitted first. Metadata may wrap or increase card height but may not overlap, clip, or shrink the card's existing full hit target or its current 48-point compact minimum height.
  • Wide Ticket Details rows keep the label and title on one line when space permits. Long titles wrap under their own text, not under the indicator.
  • Compact Ticket Details rows may wrap the title, but the complete label, title, and state remain available and no task is collapsed into a count-only inspector.
  • A long active list scrolls with the existing inspector. It is not truncated behind a hidden more disclosure.

Accessibility and interaction

  • Each row exposes one accessibility element announcing the stable label, complete title, checked or unchecked, and item N of M.
  • The decorative box shape is hidden from accessibility so state is not announced twice.
  • Rows have no button, toggle, checkbox action, hover action, context-menu mutation, or keyboard activation.
  • The card signal announces N tasks and is part of the card's existing accessibility label. It does not announce a completed fraction.
  • The glyph and count are hidden as separate accessibility elements and expose no action; the ticket card remains the single focusable hit target.
  • Inspector keyboard order places Tasks after the ticket outcome and before Delivery Goal, Codex execution goal, relationships, attention, and evidence.
  • Dynamic Type, increased contrast, and VoiceOver must preserve the readable label/title association at wide and compact widths.

Data contract

Schema v12 adds two tables without changing the accepted v11 definitions.

ticket_task_plans

Field Contract
project_id, ticket_id Composite identity and exact ticket ownership.
revision Positive, monotonic optimistic revision. A newly created plan commits and returns revision 1; revision 0 is never visible.
timestamps Created and most-recently-mutated timestamps.

There is at most one plan per ticket. A plan row is never deleted. Every committed plan has at least one active task.

ticket_tasks

Field Contract
project_id, ticket_id, id Stable plan-local machine identity; task machine ID is at most 256 UTF-8 bytes.
label Nonempty immutable owner-visible label, at most 256 UTF-8 bytes.
title Nonempty meaningful owner-visible work title, at most 4,096 UTF-8 bytes.
sort_order Nonnegative stable ordering key.
completion pending or completed.
lifecycle active or superseded.
timestamps Created, updated, completed, and superseded timestamps as applicable.

The store rejects machine-ID reuse, label reuse within one ticket plan, cross-project ownership, cross-ticket ownership, negative ordering, invalid state/timestamp combinations, and direct deletion. Projection order is sort_order, then label, then machine ID, each using stable byte ordering.

Core validation and both task-command MCP schemas enforce the exact encoded UTF-8 byte limits above without truncation or character-count substitution. Boundary tests use ASCII and multibyte values at limit minus one, the exact limit, and limit plus one.

Schema v12 cannot cascade away plan or task history. Composite foreign keys and explicit parent-delete triggers reject deletion of a ticket or project while it owns any task-plan history; task-plan and task no-delete triggers continue to reject direct deletion. Migration and Store tests exercise direct ticket deletion, project deletion that would otherwise cascade through its tickets, and direct plan/task deletion, with all rows unchanged after rejection.

Schema v12 migration creates zero task plans and zero ticket tasks. The accepted schema-v11 fixture and v11 schema contract remain immutable.

Plan invariants

  1. A ticket may have no plan.
  2. A committed plan has at least one active task.
  3. Every active task is required for acceptance.
  4. Superseded tasks remain durable history and are excluded from the visible list, card count, and acceptance denominator.
  5. The last active task cannot be superseded unless the same transaction adds at least one replacement active task.
  6. A plan cannot be deleted, cleared, or replaced by omission.
  7. Task IDs and labels cannot be reused after supersession.
  8. Pending may move to Completed once. Completed never moves back to Pending; newly discovered or rework scope is a new unchecked active task.
  9. Accepted tickets and their task plans are immutable except for an exact idempotent replay returning the original result.
  10. Every addition is created Active and Pending. An addition payload has no completion field and cannot create a completed task.

The final-state invariant, not operation ordering, prevents denominator laundering: a bounded revision may add replacements and supersede obsolete tasks atomically, but it cannot commit zero active tasks at any intermediate transaction outcome visible to another reader.

Typed mutation contract

Revise a task plan

reviseTicketTaskPlan carries the command version, request ID, authorized project root, attribution/reason, ticket ID, optional exact expected revision, explicit task additions, explicit pending-task definition revisions, and explicit supersessions.

  • expectedRevision == nil means the plan must not exist and the command must add at least one active task. Successful creation commits and returns revision 1.
  • A present revision must equal the current plan revision.
  • Omitted arrays mean no operation. Omission never deletes or supersedes.
  • Every addition is active and pending. Completed state is not accepted in an addition or definition-revision payload.
  • A definition revision may change only the title or order of an active pending task; machine ID and label are immutable.
  • One command allows at most 64 total additions, definition revisions, and supersessions, and the sorted-key encoded AgentCommand remains subject to the existing 65,536-byte boundary.
  • Core and MCP validation both reject a task machine ID over 256 UTF-8 bytes, a visible label over 256 UTF-8 bytes, or a title over 4,096 UTF-8 bytes.
  • After creation, a successful nonempty mutation at revision R commits and returns R+1 exactly once. A semantically empty new request rejects without audit or receipt.

Complete a task

completeTicketTask carries ticket ID, task machine ID, and exact expected plan revision. It may change one active pending task to completed and increments the plan revision exactly once. Completing an already-completed task under a new request rejects as a no-op; exact replay of the original request returns the original result. A completed task never returns to pending.

Accept a planned ticket

The typed Accepted transition for a ticket with a task plan carries the exact expected task-plan revision. Inside the same BEGIN IMMEDIATE store-owned transaction it reads that exact current revision and verifies every active task is completed before changing the lane. A missing/stale revision or any pending active task rejects with no lane, audit, notification, receipt, task, or plan change.

The legacy ticket transition may accept an atomic no-plan ticket under the existing acceptance rules. It must reject acceptance of a planned ticket without the revision-bearing path. Completing all active tasks never changes a lane, requests review, or accepts a ticket automatically.

No Accepted path is exempt: agent transition command, owner action, importer, sample/debug writer, and any internal transition helper route through the same policy. AgentCommand.upsertTicket is closed as an alternate Accepted path: for both create and update, any upsert whose supplied lane is Accepted rejects with zero ticket/task/plan/audit/receipt/attention/notification effects. Upsert does not accept a task-plan revision. Planned and no-plan tickets reach Accepted only through the existing transition path, whose optional exact task- plan revision follows the matrix below. The transaction distinguishes exactly:

  • no plan plus no supplied task revision: apply existing acceptance rules;
  • loaded plan plus its exact supplied revision: require all active tasks completed, then accept; and
  • no plan with a supplied revision, or loaded plan without one: reject.

Concurrent commands serialize through the existing BEGIN IMMEDIATE transaction. Acceptance racing first-plan creation, addition/supersession, completion, another revision, or another completion has one coherent winner. The loser re-reads a missing/stale revision or terminal ticket and rolls back without orphan tasks, audits, receipts, lane changes, owner attention, or notifications.

Audit, replay, and failure

  • All three mutation families use the existing durable request receipt and one authoritative store-owned audit event.
  • Audit scope is the ticket task plan and includes the ticket, prior/resulting revision, typed operation identities, and task attribution when available.
  • Exact request replay returns the original entity IDs, audit ID, and revision without another mutation or audit.
  • Reusing a request ID with different canonical content fails closed.
  • Revision conflict returns the current revision and changes nothing.
  • Transaction failure rolls back plan rows, task rows, ticket lane, receipt, audit, owner attention, and notifications together.
  • outcomeUnknown recovery replays the complete original request only.

Named error categories include ticketTaskPlanNotFound, ticketTaskPlanAlreadyExists, ticketTaskPlanRevisionConflict, ticketTaskNotFound, ticketTaskImmutable, ticketTaskIncomplete, ticketTaskReplacementRequired, and invalidTicketTaskMutation.

Acceptance verification covers these schedules with the repository's existing store/dispatcher concurrency infrastructure: no-plan Accept versus first plan create; Accept at revision R versus add/supersede at R; Accept at R versus completion at R; and two revisions or completions at R. Tests assert the exact winner state and zero loser side effects rather than relying on timing.

Delivery Goal and phase-plan interaction

Ticket-task-only additions, definition revisions, completion, and supersession do not change Delivery Goal lifecycle, phase-plan state, phase-plan revision, or ready_revision. They change how the existing ticket proves its own work; they do not change phase membership, ticket outcome, or Delivery Goal structure.

Ticket creation, ticket outcome change, ticket phase move, Delivery Goal definition/assignment/supersession, and phase changes remain structural under ADR-004 and invalidate readiness exactly as that contract requires. A task mutation cannot be used to bypass or satisfy Delivery Goal readiness.

RR-R10 needs one narrow legacy-adoption rule after its pre-Task-2A start. When finalizing a plan to Ready explicitly assigns a migration-continuation In- progress or Needs-review ticket to exactly one Draft Delivery Goal, that same transaction promotes only that goal to Active, sets its activation timestamp, and clears the continuation. It never infers or retroactively creates an assignment, and it grants no general freestanding Planned→Active transition.

Portable import and future export boundary

The current production DeliveryArtifactImporter boundary is import-only; Release Radar has no production portable exporter or exportability call path for RR-R10 to guard. Current import creates no task plans. RR-R10 therefore adds no exporter, archive predicate, guard, archive error, compatibility framework, or archive v2, and it makes no claim that current export is safe.

Future Established-roadmap RM5 owns the exporter and archive-format boundary. It must represent ticket task plans in its separately approved format or fail before emitting an archive; it must never silently omit them. RM6 import may accept only complete output in that supported exporter format and otherwise must reject it. RR-R10 authorizes no exporter or archive-v2 work. ADR-005 supersedes only its own earlier Ticket Tasks archive assumption; it does not implement the older Delivery Goals helper described by ADR-004 unless and until a real production exporter boundary exists.

Failure and recovery presentation

  • Store unavailable: replace Tasks and its card signal with the existing actionable store-recovery state; never present cached counts as current.
  • Refresh failure after a committed mutation: state that the task change was saved and a refresh is needed; do not invite duplicate submission.
  • Revision conflict: retain safe unsubmitted owner view state, show the current revision, and offer reload. No row appears changed before authoritative reload.
  • No plan: present the deliberate atomic-ticket state, not an error.
  • Empty or corrupt loaded plan: fail the projection closed as unavailable; do not render 0 tasks or permit acceptance.
  • Acceptance blocked by tasks: identify the pending active task labels/titles in the actionable error without changing the lane.

Acceptance criteria

  • Schema v11 migrates additively to v12 with zero inferred plans/tasks and complete v11 semantic preservation.
  • Stable IDs/labels, deterministic order, completion/lifecycle independence, immutable history, no deletion, no reuse, and atomic last-task replacement are enforced at policy and store boundaries.
  • Core and MCP reject task machine IDs over 256 UTF-8 bytes, labels over 256 UTF-8 bytes, and titles over 4,096 UTF-8 bytes; limit-minus-one, exact-limit, and limit-plus-one tests cover ASCII and multibyte input.
  • Ticket/project parent deletion and cascade attempts cannot erase task-plan or task history and leave all rows unchanged when rejected.
  • Revision conflicts, changed-body replay, limits, cross-project/ticket access, no-op requests, rollback, and outcome-unknown recovery fail closed.
  • New-plan creation returns revision 1; each later successful mutation advances exactly once from R to R+1.
  • Planned-ticket acceptance observes the exact task revision and all active completions in the same transaction; atomic no-plan tickets retain their explicit path.
  • Accepted upsertTicket create and update requests always reject without effects and carry no task-plan revision; all acceptance uses the transition path.
  • Task-only mutations leave phase-plan state/revisions byte-semantically unchanged; structural Delivery Goal/ticket edits retain ADR-004 behavior.
  • Card count and Ticket Details list derive from the same active rows; add and supersede change both, completion changes neither count nor lane.
  • No-plan, loaded-list, unavailable, wide, compact, keyboard, increased- contrast, and VoiceOver behavior pass running-app comparison against the approved Phase Board design language. The same manual/runtime verification exercises Dynamic Type at both wide and compact widths without a new test harness.
  • A task query failure produces unavailable recovery with no stale rows/count while the rest of the successfully loaded phase board remains usable.
  • Current import creates no task plans. RR-R10 adds no exporter or export guard; future RM5 export/format work must represent task plans or fail before emission, RM6 import accepts only complete supported exporter output or rejects it, and no archive v2 is authorized here.
  • RR-R10 bootstrap uses explicit typed requests, reflects truthful completion at application time, replays exactly, and never derives authority from repository or Codex state.
  • Additions are always pending; chained completion replay/rejection preserves exact revision and audit history.
  • Pending and completed supersession preserve completion/timestamps; completion or definition revision of a superseded task, re-supersession, and duplicate/conflicting IDs within or across operation arrays reject without effects.
  • One-task and 16-task cards announce only 1 task/16 tasks; completion does not change the count, superseded rows are absent, glyph/count are not separate focus/actions, long lists expose first/last without hidden more, and compact identity/metadata/hit targets do not overlap.
  • The original package approval and schema-v10 start handoff remain completed history. Unopened work follows the current ledger, accepted post-MDCP baseline and risk-triggered review policy; historical status does not reopen work or authorize new owner mutations.
  • Task 7A makes the initial 16-row plan live while RR-R10 is In progress. Its adapted, independently reviewed managed-v13 recovery runbook covers process quiescence, SQLite main/WAL/SHM consistency, backup identity, disposable-copy restore proof, retention, and exact abort/restore/relaunch/ readback; Task 11B reuses it without creating a backup product/framework.
  • Every live Task 7A/8/9/10/11A completion is durably reconciled before the next task opens; Task 11B is reconciled terminally. Final Task 11B readback uses all initial plus reviewed later rows, dynamic active count N, card signal ☷ N, and proof that all N active rows are checked.