Skip to content

chore/RHIDP-16056: Adjust frequency and cluster size of RHDH CPT jobs - #83092

Merged
openshift-merge-bot[bot] merged 1 commit into
openshift:mainfrom
pmacik:chore/RHIDP-16056
Aug 11, 2026
Merged

chore/RHIDP-16056: Adjust frequency and cluster size of RHDH CPT jobs#83092
openshift-merge-bot[bot] merged 1 commit into
openshift:mainfrom
pmacik:chore/RHIDP-16056

Conversation

@pmacik

@pmacik pmacik commented Aug 7, 2026

Copy link
Copy Markdown
Contributor

Summary by CodeRabbit

  • Updated RHDH CPT jobs in the Backstage performance CI configuration.
  • Changed mvp-cpt-xs, mvp-cpt-s, and mvp-cpt-m from weekly to daily schedules.
  • Switched mvp-cpt-xs, mvp-cpt-s, mvp-cpt-m, and mvp-cpt-l to the standard Backstage performance workflow.
  • Kept the weekly schedule for mvp-cpt-l.

Signed-off-by: Pavel Macík <pavel.macik@gmail.com>
@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Aug 7, 2026
@openshift-ci-robot

openshift-ci-robot commented Aug 7, 2026

Copy link
Copy Markdown
Contributor

@pmacik: This pull request references RHIDP-16056 which is a valid jira issue.

Warning: The referenced jira issue has an invalid target version for the target branch this PR targets: expected the story to target the "5.0.0" version, but no target version was set.

Details

In response to this:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@coderabbitai

coderabbitai Bot commented Aug 7, 2026

Copy link
Copy Markdown
Contributor

No actionable comments were generated in the recent review. 🎉

ℹ️ Recent review info
⚙️ Run configuration

Configuration used: Repository YAML (base), Central YAML (inherited)

Review profile: CHILL

Plan: Pro Plus

Run ID: 4579302c-9f95-4541-bf92-c58a57a1a8c0

📥 Commits

Reviewing files that changed from the base of the PR and between 962630d and eeec120.

⛔ Files ignored due to path filters (1)
  • ci-operator/jobs/redhat-performance/backstage-performance/redhat-performance-backstage-performance-main-periodics.yaml is excluded by !ci-operator/jobs/**
📒 Files selected for processing (1)
  • ci-operator/config/redhat-performance/backstage-performance/redhat-performance-backstage-performance-main.yaml

Walkthrough

The Backstage performance configuration now runs the xs, s, and m jobs daily. The s, m, and l jobs use the standard performance workflow. The l job keeps its weekly schedule.

Changes

Backstage performance jobs

Layer / File(s) Summary
Update job schedules and workflows
ci-operator/config/redhat-performance/backstage-performance/backstage-performance-main.yaml
The xs, s, and m jobs now run daily. The s, m, and l jobs use the standard performance workflow. The l job keeps its weekly schedule.

Estimated code review effort: 2 (Simple) | ~10 minutes

Suggested reviewers: shashankkestwal

🚥 Pre-merge checks | ✅ 15
✅ Passed checks (15 passed)
Check name Status Explanation
Description Check ✅ Passed Check skipped - CodeRabbit’s high-level summary is enabled.
Title check ✅ Passed The title clearly summarizes the main changes to the frequency and cluster size of the RHDH CPT jobs.
Docstring Coverage ✅ Passed No functions found in the changed files to evaluate docstring coverage. Skipping docstring coverage check.
Linked Issues check ✅ Passed Check skipped because no linked issues were found for this pull request.
Out of Scope Changes check ✅ Passed Check skipped because no linked issues were found for this pull request.
Stable And Deterministic Test Names ✅ Passed The commit changes only static YAML cron/workflow fields and generated periodic cron fields; no Ginkgo title constructs or dynamic test-title expressions were added.
Test Structure And Quality ✅ Passed The pull request changes only two YAML CI configuration files; no Ginkgo tests or test constructs were added or modified, so the check is not applicable.
Microshift Test Compatibility ✅ Passed The commit changes only two YAML job-configuration files; it adds no Ginkgo tests or test declarations, so the MicroShift compatibility check is not applicable.
Single Node Openshift (Sno) Test Compatibility ✅ Passed The commit changes only two YAML CI configuration files; it adds no Ginkgo e2e tests or multi-node test assumptions.
Topology-Aware Scheduling Compatibility ✅ Passed The commit changes only CI config and generated periodic-job YAML; its hunks update cron schedules and workflow names, with no deployment, controller, or topology scheduling constraints.
Ote Binary Stdout Contract ✅ Passed The commit changes only two YAML configuration files for cron and workflow values; it adds no OTE binary code or process-level stdout writes.
Ipv6 And Disconnected Network Test Compatibility ✅ Passed The patch changes only two YAML scheduling/workflow files. It adds no Ginkgo tests, IPv4 literals, or external connectivity requirements.
No-Weak-Crypto ✅ Passed The PR changes only cron schedules and workflow names in two YAML files; searches found no MD5, SHA1, DES, RC4, Blowfish, ECB, crypto, or secret-comparison logic.
Container-Privileges ✅ Passed The PR changes only cron schedules and workflow names; no added line sets privileged, hostPID, hostNetwork, hostIPC, SYS_ADMIN, allowPrivilegeEscalation, or root/securityContext options.
No-Sensitive-Data-In-Logs ✅ Passed The patch changes only cron schedules and workflow names; it adds no logging or sensitive values, and reporter templates expose only job status and a log URL.
✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands.

@openshift-ci openshift-ci Bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Aug 7, 2026
@openshift-merge-bot

Copy link
Copy Markdown
Contributor

[REHEARSALNOTIFIER]
@pmacik: the pj-rehearse plugin accommodates running rehearsal tests for the changes in this PR. Expand 'Interacting with pj-rehearse' for usage details. The following rehearsable tests have been affected by this change:

Test name Repo Type Reason
periodic-ci-redhat-performance-backstage-performance-main-mvp-cpt-xs N/A periodic Ci-operator config changed
periodic-ci-redhat-performance-backstage-performance-main-mvp-cpt-m N/A periodic Ci-operator config changed
periodic-ci-redhat-performance-backstage-performance-main-mvp-cpt-s N/A periodic Ci-operator config changed

Prior to this PR being merged, you will need to either run and acknowledge or opt to skip these rehearsals.

Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@openshift-ci openshift-ci Bot added the lgtm Indicates that a PR is ready to be merged. label Aug 7, 2026
@pmacik

pmacik commented Aug 7, 2026

Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-redhat-performance-backstage-performance-main-mvp-cpt-xs
/pj-rehearse periodic-ci-redhat-performance-backstage-performance-main-mvp-cpt-s
/pj-rehearse periodic-ci-redhat-performance-backstage-performance-main-mvp-cpt-m

@openshift-merge-bot

Copy link
Copy Markdown
Contributor

@pmacik: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-merge-bot

Copy link
Copy Markdown
Contributor

@pmacik: requesting more than one rehearsal in one comment is not supported. If you would like to rehearse multiple specific jobs, please separate the job names by a space in a single command.

1 similar comment
@openshift-merge-bot

Copy link
Copy Markdown
Contributor

@pmacik: requesting more than one rehearsal in one comment is not supported. If you would like to rehearse multiple specific jobs, please separate the job names by a space in a single command.

@openshift-ci

openshift-ci Bot commented Aug 7, 2026

Copy link
Copy Markdown
Contributor

@pmacik: all tests passed!

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@pmacik

pmacik commented Aug 11, 2026

Copy link
Copy Markdown
Contributor Author

/pj-rehearse ack

@openshift-ci

openshift-ci Bot commented Aug 11, 2026

Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: pmacik, shashankkestwal

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-merge-bot

Copy link
Copy Markdown
Contributor

@pmacik: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-merge-bot openshift-merge-bot Bot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Aug 11, 2026
@openshift-merge-bot
openshift-merge-bot Bot merged commit 56f37ca into openshift:main Aug 11, 2026
17 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants