Skip to content

POC Definition Template

Ulrond edited this page Aug 5, 2025 · 1 revision

1. General Information

  • POC Title:
  • Date Range:
  • Requestor / Stakeholders:
  • POC Owner / Team:

2. Objective

  • Purpose: (What specific feature, capability, or integration are you validating?)
  • Context / Problem Statement: (Why is this POC necessary? What risks or assumptions does it address?)

3. Scope

  • In Scope: (List the systems, components, interfaces, or modules to be covered)
  • Out of Scope: (Explicitly note what's excluded to avoid scope creep)

4. Technical Architecture

  • Hardware: (STB SoC, tuners, demodulators, etc.)
  • Software Stack: (Bootloader, OS, middleware, UI framework, etc.)
  • Interfaces / Protocols: (DVB, HDMI CEC, IP streaming protocols, etc.)
  • Testbed / Emulators: (Reference streams, signal generators, mock services, etc.)

5. Success Criteria

  • Key Evaluation Metrics:

    • (Performance KPIs like zap time, boot time, sync accuracy, etc.)
    • (Compliance outcomes like HbbTV conformance or DRM license flow success)
  • Decision Points: (What decisions will be informed by this POC? E.g., go/no-go, vendor selection, architecture change)

6. Assumptions & Constraints

  • Assumptions: (e.g., test streams available, hardware available, fixed delivery window)
  • Constraints: (e.g., limited access to vendor SDKs, partial test content)

7. Timeline & Milestones

  • Start Date:
  • End Date:
  • Milestones: (Key internal checkpoints – setup, integration, testing, reporting)

8. Risks

  • Known Risks: (Hardware delays, middleware bugs, test instability, etc.)
  • Mitigation Plan: (Contingencies, parallel workstreams, support escalation paths)

Clone this wiki locally