Repository navigation
POC Findings Report Template
Ulrond edited this page Aug 5, 2025
·
1 revision
- Title:
- Date Range:
- Owner / Team:
- POC Objective: (Restate the goal as originally defined)
- Summary: (One-paragraph overview of what was tested and why)
- Hardware Platform: (e.g., Broadcom 7252S, Amlogic S905D3)
- Middleware Version: (e.g., Metrological Lightning SDK v1.7)
- Broadcast Input: (DVB-T/C/S stream parameters, modulator setup, etc.)
- OTT/Hybrid Components: (HbbTV version, DASH stream profile, etc.)
- Test Tools Used: (Oscilloscopes, logging tools, test apps, Wireshark, etc.)
- Test Cases Executed: (List or reference a test case document)
- Key Integration Points: (Middleware APIs, DVB stack hooks, HLS manifest parsing, etc.)
- Configuration Files / Scripts: (Attach or reference Git repos, if version-controlled)
-
Technical Findings:
- Feature performance (e.g., EPG rendering time, zap time)
- Error conditions observed (e.g., AIT parsing failures, buffer underruns)
- Interoperability outcomes (e.g., issues with CA modules, HDMI CEC failures)
-
Metrics vs. Targets:
Metric Target Actual Result Status Boot time (cold) < 10s HbbTV app load time < 2s DRM license acquisition < 1s
- Known Issues / Bugs: (e.g., memory leak in middleware, unresolved jitter)
- Unsupported Scenarios: (e.g., only validated on 720p, no DRM stress tests)
- Assumptions Broken: (e.g., CDN had unexpected latency spikes)
- Summary of Success / Failure Points:
- Technical Risks Identified:
- Learnings: (Architecture mismatches, unexpected middleware behaviors, etc.)
- Proceed to next phase / pilot?
- Suggested modifications or redesigns
- Vendor feedback needed?
- Middleware updates required?
- Test logs
- Screenshots
- Diagrams
- Code snippets
- Configuration diffs