0.1.0-beta.10
Pre-release
Pre-release
TaskNotes Gantt 0.1.0-beta.10
Added
- A full documentation website — tngantt.com. (#248, #251)
- The canonical, feature-by-feature reference for the plugin: getting started, core concepts, a chapter for each feature (with images), and every view option grouped exactly as the plugin groups them. The README is now just a short overview and points here.
- It also documents how to drive the chart: a new "Chart controls" page covers the floating zoom/focus buttons, full screen, and collapse/expand, and every feature now spells out step by step where to find each control and how to trigger it — by click, right-click, or the command palette.
- Documentation and source links inside the plugin. (#250)
- The settings tab and the in-app "What's New" view now link straight to the documentation website and the GitHub repository, so help is one click away.
Changed
- The Bases view is now called "TaskNotes Gantt". (#251)
- It previously showed as "Gantt (OG)" in the view-type picker; the label now matches the plugin. Existing views keep working — only the display name changed.
- The Day scale opens at its most compact day columns. (#252)
- Choosing Day as the default scale used to open with wide day columns, so you had to zoom out by hand every time to reach a workable width. Day now opens at its narrowest day size — the same view you'd otherwise reach by zooming out, and identical on every device. You can still zoom back in with the timeline's + button.
Removed
- The "Gantt Task List" Bases view has been removed. (#249)
- The plugin used to offer a second, list-style view that added little over the timeline and made setup more confusing. The timeline view — now "TaskNotes Gantt" — is the single view going forward. If a base still uses the old list view, switch its view type to TaskNotes Gantt.