Skip to content

Long Baseline progress

Sean Andrews edited this page Oct 6, 2017 · 5 revisions

This is a real-time tracking of our program's progress in long-baseline observations. For each target, we requested 2 execution blocks (EB). These were nominally going to be done in one of two configurations (with half the targets done in one, and the other half in another), but the late arrival in the long-baseline configurations means its more haphazard. The C40-8 and C40-9 configurations were done in September at the end of Cycle 4. The C43-10 configuration is ongoing in Cycle 5; it will shift back to C43-9 around October 21, then to C43-8 in November.

{|

!Source !! EB1 !! EB2 !! Prelim Image !! Delivery
IM Lup
-
AS 205
-
HT Lup
-
RU Lup
-
Elias 27
-
Elias 24
-
HD 142666
-
Wa Oph 6
-
DoAr 25
-
AS 209
-
WSB 52
-
HD 143006
-
Elias 20
-
MY Lup
-
HD 163296
-
GW Lup
-
Sz 129
}

Clone this wiki locally