To ensure all work on the project match the overall project vison and planning has been done to considerate changes in the code. Some tickets may introduce a breaking change and will need to be reviewed and passed on to teams that are affected by the breaking change. This serves to save time and make sure issues are productive and meaningful.
- The issue must be related to approved design relating to the Yumble project.
- The issue must follow the Issue Schema.
- Someone other than the creator ensures that all Issue Criteria has been met.
- Leave A comment informing the creator whether the criteria has been met.
- If it has not been met then proper feedback will be given to the creator in the comments.
- If the criteria has been meet the reviewer will leave a positive comment and move the issue into the "TO DO" column on the project board.