You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
nnaufel edited this page Aug 28, 2026
·
1 revision
The AXE5-GoldenEagle Development Kit comes with shown components in the box.
AXE5-GoldenEagle Board Passive Heatsink with clip 2x Micro-USB Cables AC to 12VDC Power Adapter CRUVI mounting screws
The AXE5-GoldenEagle development board is shipped with a default power-on "Blinky LED" demonstration. Follow the instructions listed below to view the demonstration.
Configure the Board
The following components are required for the demo:
AXE5-Eagle (TEI0185) development board,
12VDC 40W power supply
Depending on the kit revision, additional components may need to be obtained. Please click on this link to review.
Configure the MSEL DIP Switches
The MSEL2 and MSEL1 DIP switches need to be set to the ON position (left) for Boot from QSPI configuration.
Run the demonstration.
Apply power to the board. There are four RGB LEDs placed in the four corners of the board. When power is applied they will begin flashing.