Help dock cost_reports
Cost Reports is the permission-gated labor-cost view of Work Reports. It converts accessible work hours and configured wage data into project cost totals.
A meaningful result needs all of the following:
- work-hour records in the selected date range;
- tasks, processes and users visible to the current account;
- configured wage or cost data for those users;
- permission to read labor-cost reporting data.
The UI never substitutes a guessed wage or currency.
Choose date range, scope and grouping, then Refresh. Available views can break totals down by user, task or process using the same underlying report owner as Work Reports.
An empty report can mean no hours, missing cost configuration, or insufficient access. Read the permission or data message above the report before treating zero as a real financial total.
- Cost values are shown only when the server authorizes the current account.
- Hiding this dock does not change permissions or source data.
- Project labels and currency come from server configuration.
- Refresh is read-only and preserves the selected range after a temporary failure.
Cost Reports has its own dock and uses the existing authorized Labor Cost report. Its project/week state is independent of Work Reports and Weekly Timesheet. Server financial permissions still apply.
Cost Reports reuse the shared Work Reports composition. Wage/cost data remains protected by the existing server and controller permissions; a shared layout does not grant finance access. Browser report choices come from the authorized server response.
TACTIC-Stream · Releases · Issues · English · Русский
English
- Home
- Installation
- Feature tour
- User guide
- Assistant
- Dashboards
- Knowledge Base
- Synology DSM
- Demo projects
Русский
- Главная
- Установка
- Обзор возможностей
- Руководство пользователя
- Помощник
- Дашборды
- База знаний
- Synology DSM
- Демо-проекты
Development / Разработка