Multirate Simulation

Multirate integration lets named subsystems advance on a step different from the system step. It is useful when one part of a connected model is much faster or slower than the rest and a single global step would waste evaluations.

Multirate schedules currently require the fixed-step solver.

Step definition

simulation.solver.dt is the maximum system step. Entries under simulation.solver.subsystems are ratios relative to dt:

  • 0.1 means dt / 10: ten subsystem steps per system step;
  • 1 means the normal system step;
  • 10 means 10 * dt: one subsystem update over a ten-step window.

A ratio below one must be 1/N; a ratio above one must be an integer N. The mapping key is the assembled subsystem name, such as pcc, grid.branch or vsc.dclink.

simulation:
  solver:
    type: fixed
    method: rk4
    dt: 25e-6
    subsystems:
      pcc: 0.1
      vsc.dclink: 10
    sweeps: 2

Here the bus is treated as the fast group and the DC link as the slow, windowed group. Unlisted subsystems remain on the system step.

Fast subsystems

A subsystem with ratio 1/N is sub-stepped inside each system interval. It shares the system's fixed integration method. sweeps controls coupling sweeps between the fast group and the rest of the system; increasing it can reduce split error but increases RHS evaluations.

Fast sub-stepping helps only when it replaces an otherwise smaller global dt. Assigning many strongly coupled subsystems to the fast group may cost more than a single-rate run.

Slow subsystems and windows

A subsystem with ratio N advances over a window of N * dt. During that window, the rest of the system sees extrapolated slow states, while the slow subsystem receives window-averaged interface inputs. All windowed subsystems share one window method; an entry may specify it explicitly:

subsystems:
  vsc.dclink: {step: 10, method: rk4}

Windowing is most effective for storage dynamics whose state changes little over one window. Large windows across strong coupling can reduce accuracy or erase dynamics that matter to the study.

Events and exact boundaries

Every event time is still an exact integration boundary. If an event interrupts a slow window, PESLite closes the pending work using the actual shortened interval, applies the event, and starts the updated model without moving the original future time grid. Parameter-changing events also refresh the affected storage declarations.

Output points and the requested end time likewise remain exact; they are not rounded to a multirate, controller or PWM grid.

Complete example

This case puts the DC link on a ten-system-step window while the remaining system uses RK4 with a maximum step of 25 microseconds:

base: {s_base: 2.0e6, v_ll_rms: 690.0, f0: 50.0}

buses:
  pcc: {c_pu: 0.02, r_d_pu: 0.5}

sources:
  grid:
    bus: pcc
    x_pu: 0.4
    r_pu: 0.04

units:
  vsc:
    bus: pcc
    ac_filter: {l_f_pu: 0.2, r_f_pu: 0.01}
    dclink:
      vdc_ref: 1500.0
      source: {type: voltage}
    pwm: {f_sw: 20000.0, modulation_limit: 0.95}
    ctrl:
      type: gfm
      loops:
        power: {type: power}
        sync: {type: psc, k_p_pu: 6.2832, k_vi: 20.0}
        vi: {type: virtual_impedance}
        damp: {type: active_damping, r_a_pu: 0.2, alpha_d: 40.0}
      references: {p_ref_pu: 0.5}
    protection: {overcurrent: {enable: 1, limit_pu: 1.5}}

events:
  connect_vsc: {type: connect, target: vsc, t: 0.2, ramp: 0.2}
  p_step: {type: set, t: 0.6, set: {units.vsc.ctrl.references.p_ref_pu: 0.7}}

simulation:
  t_end: 1.0
  solver:
    type: fixed
    method: rk4
    dt: 25e-6
    subsystems:
      vsc.dclink: 10
    sweeps: 2
    linearisations: 3
  output:
    period: 0.5e-3
    record_every: 10

Save it as multirate.pes and run:

peslite multirate.pes

Do not add --averaging to this command unless the solver is deliberately overridden: that preset selects adaptive DP45, while subsystem schedules require a fixed solver.

Accuracy and speed workflow

Always compare a proposed split with a single-rate baseline:

  1. run with subsystems: {} at a converged dt;
  2. add one fast or slow group;
  3. compare important states at common output times and inspect the summary;
  4. reduce the ratio or increase sweeps if the split error is too large;
  5. measure wall time only after accuracy is acceptable.

linearisations controls points used for the post-run split-error bound; 0 disables that bound. The multirate solver also reports interface and window indicators in the run summary. Treat these as diagnostics, not as a replacement for convergence against a tighter reference run.

Limitations

  • Multirate schedules are supported only with simulation.solver.type: fixed.
  • Fast groups share the system fixed method.
  • Windowed groups share one method and window length.
  • The current C++ exporter supports single-rate fixed solvers and adaptive DP45, not multirate subsystem schedules.

For bridge-dependent time grids, see Converter and Bridge Models.