Skip to content

PathPlanning

Timothy Yong edited this page Jul 19, 2026 · 1 revision

Path Planning

Status: Draft

Goal

Generate a feasible path from current pose to target pose.

Prerequisites

  • Robot pose estimate
  • Map or obstacle model

Steps

  1. TODO
  2. TODO
  3. TODO

Expected Output

  • Planned path (waypoints/trajectory)

Troubleshooting

  • TODO

Clone this wiki locally