Physical Design
Richard Huang edited this page Jul 29, 2026
·
2 revisions
The Physical Design team is responsible for transforming the verified RTL into a manufacturable GDSII while meeting performance, power, area (PPA), and signoff requirements.
- Achieve timing closure at the target frequency
- Minimize area and power
- Meet all DRC/LVS requirements
- Produce tapeout-ready GDSII
RTL
↓
Synthesis (Genus)
↓
Floorplanning
↓
Power Planning
↓
Placement
↓
Clock Tree Synthesis (CTS)
↓
Routing
↓
Post-Route Optimization
↓
Static Timing Analysis
↓
Physical Verification
↓
Tapeout (GDSII)
- RTL freeze
- SDC constraints
- UPF (if applicable)
- Library and LEF files
- Technology mapping
- Timing optimization
- Area optimization
- Power optimization
Deliverables:
- Netlist
- Reports
- Constraints
- Core sizing
- Macro placement
- IO placement
- Blockages
- Pin assignment
Deliverables:
- Initial DEF
- Floorplan reports
- Power rings
- Power stripes
- Standard cell rails
- IR-drop planning
Deliverables:
- Power grid
- IR analysis
- Global placement
- Detailed placement
- Congestion optimization
- Buffer insertion
Deliverables:
- Placed DEF
- Congestion reports
- Clock buffering
- Skew optimization
- Latency balancing
- Hold fixing
Deliverables:
- CTS database
- Clock reports
- Global routing
- Detailed routing
- Antenna fixes
- DRC cleanup
Deliverables:
- Routed DEF
- DRC reports
- Static Timing Analysis (STA)
- IR Drop
- EM Analysis
- DRC
- LVS
- Power analysis
Deliverables:
- Signoff reports
- GDSII
| Stage | Tool |
|---|---|
| Synthesis | Cadence Genus |
| Floorplan / P&R | Cadence Innovus |
| Timing | Cadence Tempus |
| Power | Cadence Voltus |
| DRC/LVS | Siemens Calibre |