Skip to content

Specs M4 Risks Risk Assessment

Claude edited this page Aug 28, 2026 · 1 revision

RiskAssessment

risks.models.risk_assessment.RiskAssessment

Risk assessment campaign conducted following one or the other methodology (ISO 27005 or EBIOS RM). Root entity that groups together all analysis elements.

2.1 Entity: RiskAssessment (Risk assessment)

Represents a risk assessment campaign, conducted following one or the other methodology. It is the root entity that groups together all analysis elements.

Field Type Constraints Description
id UUID PK, auto-generated Unique identifier
scope_id relation FK → Scope, required Attached scope
reference string required, unique Reference code (e.g. RA-2026-001)
name string required, max 255 Assessment title
description text optional Description and context
methodology enum required iso27005, ebios_rm
assessment_date date required Date carried out
assessor_id relation FK → User, required Assessment owner
team_members relation M2M → User Members of the assessment team
risk_criteria_id relation FK → RiskCriteria, required Applied risk criteria
status enum required draft, in_progress, completed, validated, archived
validated_by relation FK → User, optional Validator
validated_at datetime optional Validation date
next_review_date date optional Next review date
summary text optional Summary of results
created_by relation FK → User Creator
created_at datetime auto Creation date
updated_at datetime auto Last modification date

Clone this wiki locally