-
Notifications
You must be signed in to change notification settings - Fork 0
Roadmap
Current status — October 2, 2026: V2 is live from main after John’s explicit production authorization. Search, launch article, AI disclosure, social metadata, and dual-configuration CI are delivered. V2 launch is the current release record. Earlier milestones and production holds below are historical. Next: share the launch, deeper implementation post, physical Fold6 review, and prioritize remaining operations/toolbar/appearance/dependency work from the backlog.
Last updated: October 1, 2026. This is a sequence of work, not a committed delivery schedule. No target dates have been agreed. Issue status is authoritative for individual tasks.
Home, professional Work, Writing/Blog, About, Coding/Projects, and Talks/Media are integrated into v2. The approved résumé storytelling enhancement is now also integrated through PR #40, merge 7b04338ababbfae33ed22cf80f223b7f4fa0811f. Staging follows v2 again. Education is a dedicated section with equivalent heading weight, an official UCF stacked black mark, University of Central Florida, Class of 2008, Bachelor of Arts in English and Technical Writing Track; committed at 4bd9d60ebe07493902e3ac1b5e01faca1f9bfbc3 following John’s request to give the degree appropriate prominence. Earlier revision/deployment records below are historical. Résumé review · Current requirements and evidence.
Résumé enhancement is complete for the approved scope: stronger sourced accomplishments, work/tool badges, industry/team cues, expandable earlier experience and details, three views, and four URL-persistent filter facets. Feature CI/deployment and deployed desktop interaction checks passed. Mobile implementation is present; physical Fold6 visual confirmation remains a release check.
About #36 remains completed after John's final sports and comedy revisions. Recent page branch histories and the approved README are reconciled.
Coding/Projects and the recovered Talks/Media archive are complete in PR #42, merge 149dc742e3b3868f5b02e8b7cb48b0975b6d39b2. The archive contains 16 speaking/slide records and seven media records; sources, unavailable recordings, provenance, and validation are documented in Coding Projects and Speaking Archive. Integrated staging publication is verified in run 36960257238; live build-info.json matches v2 commit 149dc742e3b3868f5b02e8b7cb48b0975b6d39b2.
- Proper site-wide search (#26).
- Toolbar design dive (#38), preserving existing functionality while refining hierarchy and responsive fit.
- Final content, links, accessibility, mobile/Fold6, metadata, operations and release/rollback checks, then separately approved production promotion.
No launch date is committed. Older dated queue recommendations below are history; this sequence is current.
| When / phase | Outcome | Dependency / exit criteria |
|---|---|---|
| September 30, 2026 — direction recorded | Initial homepage direction and v2 requirements documented | See V2 requirements; broader design decisions remain open |
| Before v2 implementation — delivery foundation | Isolated staging and review workflow | #25 validated; coordinate CI/release strategy in #21 |
| October 1, 2026 — page integration | Home, Work, Writing/Blog and About live on staging | Recent branches integrated; safe builds and live revision verified; further device/content review remains |
| After prototype review — remaining v2 scope | Writing, Work, About, supporting pages, and content migration | John reviews prototype; resolve platform, visual system, content selection, and remaining layouts |
| Before launch — verification | Release-ready site and recovery instructions | Accessibility, links, responsive behavior, metadata, redirects, analytics, monitoring, deployment and rollback checked |
| After launch — ongoing development | Maintain the site and publish useful resources and project lessons | Prioritize from the live backlog and record outcomes in the journal |
First implementation milestone: V2 — Responsive homepage prototype. This is distinct from the full v2 launch. See V2 requirements for scope; no deadline is specified.
Design exploration can continue while staging is established. The staging prerequisite applies to implementation, not further design discussion.
- #22 — Version 2 delivery: overall delivery scope.
- #23 — Design exploration: broader visual and interaction decisions.
- #21 — Deployment, release, and CI: delivery process, coordinated with #20 — branch rename.
- #25 — Staging: prerequisite for implementation.
- #19 — Link validation and #24 — analytics and monitoring: quality and operational readiness.
- #26 — Search and #27 — resume downloads: supporting v2 capabilities.
Use the live backlog for current task status. Update this roadmap when sequence, dependencies, scope, or agreed dates change.
The professional work history prototype is implemented, reviewed and approved by John, and committed on professional-overview-preview at fc60f9beea5de8281e632151eb57d5536e2d0ae9. #35 now tracks integration and validation rather than initial development. Preserve newer homepage/featured-content changes from PR #33 when integrating this older-base branch. Canonical CI, full browser/Fold6 checks and staging verification remain pending; production publication is separate.
Recommended next page: Writing index + simple article reading template, followed by About and then dedicated project/talk pages. Search #26 remains deferred, Dark/Darker #34 remains separate, and operations #24/#29–#32 retain their existing sequence. No new deadlines are committed. See the approved professional page requirements.