Project BackLog to complete the QA Plan

Pendings tasks

ID Chapter of the QAP Description Responsible for implementation Status of implementation Deadline for Implementation Contributors/ Reviewers Priority
2 All Propose Technologies/tools to be used for: Change/Problem Management process, Configuration Management process, Implement Traceability Matrix SQS, IT In process - All
3 Chapter 1.2 Include the scope and goals of the project as agreed in the meeting in Paris Bernd Hekele In process 31.07.2013 SQS High
9 Chapters 3.2.1 and 3.2.2 OpenETCS Software and Tool Chain life-cycle Jan Welte. Addressed 11/06/2013 Accepted In process 31.07.2013 Open Medium
10 Chapters 3.3 QA Management SQS ToDo - Open Medium
12 Annex A (to Chapter 4.1) Roles: Elaborate Required Competence Matrix (RCM) Open ETCS project Roles Bernd Hekele ToDo - Open Medium
13 Annex B (to Chapter 4.1) Roles: Elaborate Required SCRUM Roles and Competence Matrix (RCM) Merlin Polkam. Addressed 11/06/2013 In process 31.07.2013 Open Medium
14 Annexes C and D (to Chapters 4.2 and 4.3) Roles: Elaborate RCM Software and Tool Chain, according to CENELEC Jan Welte. Addressed 11/06/2013 In progress (RCM Software done, Tool chain in progress) 31.07.2013 Open Medium
16 Annex E (to Chapter 5) Methods and Tools: Requirements & Architecture (Preliminary and Maintain) Marielle Petit-Doche. Addressed 11/06/2013 Accepted In Progress 21.06.2013 First Contributions 11.07.2013 Update Open Medium
17 Annex E (to Chapter 5) Methods and Tools: Testing, Verification and Validation (Preliminary and Maintain) Merlin Polkam. Addressed 11/06/2013 Medium
18 Annex E (to Chapter 5) Methods and Tools: Safety, Maintainability (Preliminary and Maintain) Jan Welte. Addressed 11/06/2013 Accepted Medium
20 Chapter 6.2 & 6.3 Documentation Structure (tool chain) - Quality Control and Monitoring SQS, IT - Jan Welte In process - Bernd Hekele - Jan Welte Medium
21 Chapter 7 Documentation Control, including the Review Process SQS, IT In process 31.07.2013 High
22 Chapter 8.1 Prepare Traceability Matrix. Identify traceability requirements. First draft (SQS), ?? Medium
23 Chapter 8.2 and 8.5 Prepare SCMP Jürgen Weiss In progress 31.07.2013 Open High
26 Chapter 9 Supplier control First draft (SQS, IT), ?? First draft done (to be discussed) 22.07.2013 Medium
27 Chapter 10 Publishing guidelines Stefan Rieger In progress Medium
28 All, Chapter 1 Abbreviations and Naming Conventions Bernd Hekele, Jan Welte 08.08.2013 Medium
29 Procedures Code Review Process Bernd Hekele Medium
30 Procedures Training Process SQS Medium
31 Procedure How to make a dissemination Stefan Rieger Medium
32 Template Competence Matrix Template Jan Welte Medium
33 Template Expert Database Template ?? Medium
34 Guidelines Expert Selection Guidelines SQS Medium
35 Procedure Nomenclature definition SQS, IT First version done (to be discussed) 12.07.2013 All Medium

Done tasks

ID Chapter of the QAP Description Responsible for implementation Deadline for Implementation Contributors/ Reviewers
0 All Include the updated version of the FPP in Github under Governance Bernd Hekele 16.05.2013 None
1 All Agree on the technologies/tools to be used for: Review Process Bernd Hekele 17.05.2013 SQS, IT, All
4 Chapters 1.3, 1.4 and 1.5 Complete and implement comments made by reviewers SQS, IT 16.05.2013 Bern Hekele
5 Chapters 2.1 and 2.2 Project organisation Chapter: review and complete SQS, IT 17.05.2013 Bernd Hakele
6 Chapter 2.3 Project QA Management: complete SQS, IT 17.05.2013 Bernd Hekele
7 Chapter 3 Life Cycle: Prepare short Introduction SQS, IT 10.07.2013 Bernd Hekele
8 Chapter 3.1 and 3.2 Project and Product Life-cycle SQS 01.07.2013
11 Chapter 4 Roles: include overview and explanations for each sub-chapter SQS, IT 17.05.2013 Bernd Hekele
15 Chapter 4.4 Elaborate Monitoring and Control Activities to be performed SQS, IT 17.05.2013
16 Chapter 5 Methods and Tools: Overview chapter and explanations for each subchapter SQS, IT 22.05.2013
19 Chapter 6 & 6.1 Introduction to the section and 6.1 SQS, IT 12.07.2013 Bernd Hekele - Jan Welte
24 Chapter 8.3 Fault Management Process: review, complete and prepare. SQS, IT 19.06.2013 Bernd Hekele
25 Chapter 8.4 Prepare a grieving handling process Bernd Hekele 18.07.2013

QA Plan Deliveries

Nr

Date

Back log IDs Implemented

Responsible

Contributors/Reviewerws

1

20.05.2013

4, 5, 6, 11, 15 y 16

SQS, IT

Bernd Hekele

2

28.06.2013

7, 19 y 24

SQS, IT

Bernd Hekele

3

31.07.2013

16

Marielle Petit-Doche; SQS, IT

Bernd Hekele

4

31.07.2013

3, 21, 23, 25

SQS, IT, Bernd Hekele, Jürgen Weiss