Project BackLog to complete the QA Plan

Pendings tasks

ID

Chapter of the QAP

Description

Responsible for implementation

Status of implementation

Deadline for Implementation

Contributors/ Reviewers

Priority

2

All

Propose Technologies/tools to be used for:

· - Change/Problem Management process

· - Configuration Management process

  • - Implement Traceability Matrix

SQS, IT

In process

-

All

3

Chapter 1.2

Include the scope and goals of the project as agreed in the meeting in Paris

Bernd Hekele

In process

31.07.2013

SQS

High

8

Chapter 3.2

Product Life-cycle

SQS

In process

31.07.2013

All

Medium

9

Chapters 3.2.1 and 3.2.2

OpenETCS Software and Tool Chain life-cycle

Jan Welte. Addressed 11/06/2013 Accepted

In process

31.07.2013

Open

Medium

10

Chapters 3.3

QA Management

¿?

ToDo

-

Open

Medium

12

Annex A (to Chapter 4.1)

Roles: Elaborate Required Competence Matrix (RCM) Open ETCS project Roles

Bernd Hekele?? (to be discussed)

ToDo

-

Open

Medium

13

Annex B (to Chapter 4.1)

Roles: Elaborate Required Competence Matrix (RCM) Open ETCS project Roles

Merlin Polkam. Addressed 11/06/2013

In process

31.07.2013

Open

Medium

14

Annexes C and D (to Chapters 4.2 and 4.3)

Roles: Elaborate RCM Software and Tool Chain, according to CENELEC

Jan Welte. Addressed 11/06/2013

In progress (RCM Software done, Tool chain in progress)

31.07.2013

Open

Medium

16

Annex E (to Chapter 5)

Methods and Tools: Requirements & Architecture

(Preliminary and Maintain)

Marielle Petit-Doche. Addressed 11/06/2013 Accepted

In Progress

21.06.2013 First Contributions

11.07.2013

Update

Open

Medium

17

Annex E (to Chapter 5)

Methods and Tools: Testing, Verification and Validation

(Preliminary and Maintain)

Merlin Polkam. Addressed 11/06/2013

Medium

18

Annex E (to Chapter 5)

Methods and Tools: Safety, Maintainability

(Preliminary and Maintain)

Jan Welte. Addressed 11/06/2013 Accepted

Medium

20

Chapter 6.2 & 6.3

Documentation Structure (tool chain)

Quality Control and Monitoring

SQS, IT

Jan Welte

In process

-

Bernd Hekele

Jan Welte

Medium

21

Chapter 7

Documentation Control, including the Review Process

SQS, IT

In process

31.07.2013

High

22

Chapter 8.1

Prepare Traceability Matrix. Identify traceability requirements.

??

Medium

23

Chapter 8.2 and 8.5

Prepare SCMP

Jürgen Weiss

In progress

31.07.2013

Open

High

25

Chapter 8.4

Prepare a grieving handling process

Bernd Hekele

In progress

31.07.2013

Open

High

26

Chapter 9

Supplier control

??

Medium

27

All, Chapter 1

Abbreviations and Naming Conventions

Bernd Hekele

Medium

28

Procedures

Code Review Process

??

Medium

29

Procedures

Training Process

??

Medium

30

Procedure

How to make a dissemination

Stefan Rieger

Medium

31

Template

Competence Matrix Template

??

Medium

32

Template

Expert Database Template

??

Medium

33

Guidelines

Expert Selection Guidelines

??

Medium

34

Procedure

Nomenclature definition

SQS

In process

12.07.2013

All

Medium

Done tasks

ID

Chapter of the QAP

Description

Responsible for implementation

Deadline for Implementation

Contributors/Reviewers

0

All

Include the updated version of the FPP in Github under Governance

Bernd Hekele

16.05.2013

None

1

All

Agree on the technologies/tools to be used for:

  • Review Process

Bernd Hekele

17.05.2013

SQS, IT

All

4

Chapters 1.3, 1.4 and 1.5

Complete and implement comments made by reviewers

SQS, IT

16.05.2013

Bern Hekele

5

Chapters 2.1 and 2.2

Project organisation Chapter: review and complete

SQS, IT

17.05.2013

Bernd Hakele

6

Chapter 2.3

Project QA Management: complete

SQS, IT

17.05.2013

Bernd Hekele

7

Chapter 3

Life Cycle: Prepare short Introduction

SQS, IT

10.07.2013

Bernd Hekele

8

Chapter 3.1

Project Life-cycle

SQS

01.07.2013

11

Chapter 4

Roles: include overview and explanations for each sub-chapter

SQS, IT

17.05.2013

Bernd Hekele

15

Chapter 4.4

Elaborate Monitoring and Control Activities to be performed

SQS, IT

17.05.2013

16

Chapter 5

Methods and Tools: Overview chapter and explanations for each subchapter

SQS, IT

22.05.2013

19

Chapter 6 & 6.1

Introduction to the section and 6.1

SQS, IT

12.07.2013

Bernd Hekele

Jan Welte

24

Chapter 8.3

Fault Management Process: review, complete and prepare.

SQS, IT

19.06.2013

Bernd Hekele

QA Plan Deliveries

Nr

Date

Back log IDs Implemented

Responsible

Contributors/Reviewerws

1

20.05.2013

4, 5, 6, 11, 15 y 16

SQS, IT

Bernd Hekele

2

28.06.2013

7, 19 y 24

SQS, IT

Bernd Hekele

3

31.07.2013

16

Marielle Petit-Doche; SQS, IT

Bernd Hekele

4

31.07.2013

3, 21, 23, 25

SQS, IT, Bernd Hekele, Jürgen Weiss