Skip to content

docs enterprise backlog ep06 trips

AlexandreZanata edited this page Nov 21, 2026 · 1 revision

EP06 — Operations, trips and logbook

Task IDs, titles, phase, cut, type, effort, priority and dependencies follow the existing generated index. Task descriptions were reconstructed from trip requirements, state model, offline sync and validation.

Local F1 requires M0 closure and protected integration of the current ADR-019 construction batch. See the sequencing decision.

Recovered scope follows the surviving requirements and acceptance scenarios. Detailed trip rules are in the recovered trip design.

EMP-TRIP-006 — Panel: trips list, timeline detail and review

  • Meta: module TRIP · phase F2 · cut C1 · priority P0 · type WEB · size M · state TODO
  • Objective: Show authorized trip detail, timeline and review in the company panel.
  • Rules and use cases: REQ-07.3, BR-AUTH-013, BR-REV-007, EDR-028
  • Depends on: EMP-TRIP-004, EMP-PLAT-008
  • Read first: trip requirements, state model, offline sync and validation
  • Scope: in: scoped list, timeline and permitted decisions · out: computed work hours and client authority
  • Areas: existing: organization scope, fleet, sync and review conventions · proposed: owning trip domain, adapters and consumers
  • Steps: Pin the stated acceptance and denial cases before changing the owning entry point. Verify the affected consumers.
  • Deliverable: The panel exposes only scoped facts and distinct operational, sync and review states.
  • Acceptance: The panel exposes only scoped facts and distinct operational, sync and review states.
  • Negative cases: Foreign result, missing reason, stale decision or report shown as a time record.
  • Validation: V-WEB, V-AUTHZ, V-ISO · migration: rehearse additive upgrade and recovery if persistent state changes · rollback: close the new entry and preserve accepted evidence
  • Risks and assumptions: The trip design supplies the transition and policy boundaries. C1 remains driver-initiated and the logbook remains operational.
  • Done when: The stated result and denials pass the listed validation profiles.

Fuel prices wiki

Source: AlexandreZanata/Abastevo @ e4a67580fc368a59bc1c0f1e0466fc011313f330

Clone this wiki locally