Alternator Shadow commissioning flow
github-actions[bot] edited this page Sep 26, 2026
·
1 revision
Home › ESPHome devices › Alternator Port
The order to bring a new alternator board into service: flash, Shadow ON, verify current/voltage/temperature against reference, then Shadow OFF.
INSTALLATION.md §6.4 — follow on board with a clamp meter
Each step uses the Shadow, setpoints and fault-clear controls above.
On the boat's Sisu Wi-Fi/LAN (the router forwards to Sisu-IoT); device powered; a person aboard with meters; engine running for the last steps
Readings match the meters within tolerance before Shadow goes OFF; any fault latches the field off.