Sources and confidence

Every claim in this manual carries one of three marks. The point of the marks is to let you argue with the right things: a documented price is checkable, a working method is a default to tune, and confusing the two wastes everybody's time.

Mark Means How to treat it
documented From a vendor's published documentation, read on a date Check it. Prices and limits change
established A named, published practice with an author and a year Standard. Read the source if you want depth
working method This manual's own construction A default to tune on your own traffic, not a standard

The documented figures were read in September 2026 and will change. The working-method thresholds are starting points, not findings.

This page is longer than a source list because a source list is not the hard part. The hard part is knowing what a number entitles you to say — in a gate, in a business case, in front of a regulator — and that is what the sections below are for.


How to read a confidence mark

A mark is not a quality rating. It says where a claim came from, and that decides what you may do with it and what you owe before you act on it.

documented — what it means operationally

A vendor published it and somebody here read it on a stated date. That is the whole claim. It does not say the figure is correct, that it applies to your region, your model or your contract, or that it is still true this morning.

You are entitled to quote it with its date attached, build the arithmetic of a business case on it, and put it into a cost model. Its value is that it is settleable: anyone who disagrees can open the same page and the argument ends in a minute.

You must not quote it without the date, carry it across models or regions without re-reading, or read it as a promise about behaviour. A published price is a price. Latency, availability and quality are not documented here at all, and a vendor's documentation is not a contract — your agreement is.

established — what it means operationally

A named, published practice with an author and a year, in the literature long enough to have known failure modes. Some of it is mathematics — Wilson (1927), Little (1961) — and some of it is method with a published description and worked examples, such as ATAM or EARS.

You are entitled to use it without re-deriving it, cite the lineage in a decision record, and expect a reviewer to accept the method without an argument about its validity. The live question is applicability, never correctness.

You must not treat a method as an outcome: ATAM tells you how to find sensitivity points, not which ones you have. And the mathematics assumes what it assumes — Wilson assumes independent samples, Little's law assumes a stable queue and interchangeable servers, pⁿ assumes steps that do not correlate. A formula used outside its assumptions is wrong with a citation attached, which is harder to catch than being wrong plainly.

working method — what it means operationally

This manual's own construction. It has worked somewhere, and it exists so that a team has something to run on Monday instead of a blank field.

You are entitled to adopt it as a default and change it the moment your own traffic says otherwise. That is the intended lifecycle, not a failure of the default.

You must not present it to a governance forum as evidence, defend it on authority, or leave it untouched for a year and call that confirmation. A default you have measured and changed is worth more than a default you inherited; a default nobody has examined is a number with a plausible shape.

Mark What to argue about What settles it Owed before you act on it
documented Whether it still says that Opening the vendor's page The date, and a re-read on it
established Whether it applies here The assumptions behind it Naming the assumption you are relying on
working method What the number should be Your own traffic A measurement, and a review date

Where each mark may be used

The tables above say what a mark means. This says where you may spend it. Read down your own column: the entitlement changes with the room you are standing in, and only one cell on this page says no.

In a business case At a gate In front of a regulator or an auditor
documented Yes, with the date beside it Yes Yes, with the date and the page that said it
established Yes Yes, naming the assumption you are relying on Yes, with the lineage cited
working method Yes, if it is labelled as a default Only if you have measured it on your own traffic No. Your measurement may go. The default may not

The bottom-right cell is the one that gets crossed, and it rarely looks like a lie when it happens. A working method quoted to a governance forum is this manual's number wearing your evidence's clothes: it has a plausible shape, a decimal point and no traffic behind it. The fix is not to stop using working methods — it is to measure one before it has to stand up.

The lifecycle of a working method

Changing a default is not the default failing. It is the default doing the only job it was built for, which is to give a team something to run on Monday instead of a blank field.

Adopt a default, measure it on your own traffic, then keep it or change it; either way it becomes evidence

▸ Open the picture full size

Both paths out of Measure end in the same place. That is the part worth saying out loud: a default you kept after measuring it is worth exactly as much as one you changed, and neither is worth anything until somebody has looked.


Check a documented figure yourself

A documented figure is the only kind you can verify without running an experiment, and verifying one takes about ten minutes. Do it before a business case rests on it, and again on the date you wrote down.

  1. Open the vendor's own page, not a summary. Blog posts, conference slides and this wiki are all downstream. The pricing page and the specification are the source.
  2. Read the unit before you read the number. A cache write at 1.25× is 1.25× the input price for that model, not 1.25× a blended rate and not 1.25× the output price. Most misquoted figures are correct numbers attached to the wrong unit.
  3. Collect the qualifiers. Minimums, model families, regions, expiry windows. The ~1,024-token minimum and the model scoping are not footnotes — they are the difference between a saving and a surcharge.
  4. Write what you read in your own words, with the URL and the date. A figure with no date is a rumour with a decimal point.
  5. Check one arithmetic consequence against your own bill. Model one day of real traffic and compare it with the invoice for that day. Agreement within a few percent means you read it correctly; a gap means either your reading is wrong or something structural changed, and both are worth knowing before the figure goes into a slide.
  6. Set the next check date. Monthly for prices, quarterly for protocol and product behaviour, and immediately after any vendor announcement that touches the area.
  7. Record where the figure is used, not only what it says. A price that moved is only useful if the change reaches the cost model, the decision record and the business case that quoted it.
Template · Figure verification log
# Figure verification log · <team> · owner: <name>

One row per figure this team relies on. A figure with no row is a figure nobody owns.

## The figures
| Figure | Source (URL or document) | Date read | Value as read | Unit and qualifiers | Next check due | Read by |
|--------|--------------------------|-----------|---------------|---------------------|----------------|---------|
| Five-minute cache write | <vendor pricing page> | <2026-09-xx> | 1.25x | x INPUT price, per model; ~1,024-token minimum | <2026-10-xx> | <name> |
| One-hour cache write | <vendor pricing page> | <2026-09-xx> | 2x | x input price | <2026-10-xx> | |
| Cache read | <vendor pricing page> | <2026-09-xx> | 0.1x (0.025x on <model>) | model-scoped; refresh free on hit (5 min) | <2026-10-xx> | |
| Batch rate | <vendor batch page> | <2026-09-xx> | ~50% of on-demand | results within a day | <2026-12-xx> | |
| <our negotiated rate> | <contract section> | | | | | |

## Where each figure is used — so a change has somewhere to land
| Figure | Cost model | ADR | Wiki / doc page | Business case or slide |
|--------|-----------|-----|-----------------|------------------------|
| <cache read> | <file> | ADR-<n> | <page> | <deck, slide n> |

## The arithmetic check
Date: <date>. One day of real traffic: modelled $<n>, invoiced $<n>, ratio <n>.
Outside 0.95-1.05 the reading is wrong OR something structural changed. Which: <answer>.

## Changes since the last check
| Date | Figure | Was | Now | What it changed downstream | Who was told |
|------|--------|-----|-----|---------------------------|--------------|
| | | | | | |

## Figures we rely on and CANNOT verify
| Figure | Why not | What we do instead |
|--------|---------|--------------------|
| <a partner's throughput claim> | <no published source> | <measure it ourselves, monthly> |

Documented

Claim Source Last read
Cache write 1.25× input for five minutes, 2× for one hour; read 0.1× (Fable and Mythos 5.1 at 0.025×); ~1,024-token minimum; model-scoped; five-minute cache refreshes free on hit Anthropic and Amazon Bedrock prompt-caching documentation September 2026
Batch processing at about half the on-demand rate, results within a day Anthropic and Amazon Bedrock batch documentation September 2026
MCP: a server exposes tools, resources and prompts; stdio locally, Streamable HTTP in production; consequential calls designed for human review Model Context Protocol specification September 2026
Context files: CLAUDE.md, .github/copilot-instructions.md (plus scoped *.instructions.md), AGENTS.md, .cursor/rules/*.mdc. Copilot's steers inline suggestions; Claude Code's drives autonomous actions Anthropic, GitHub, OpenAI and Cursor documentation September 2026
A model gateway giving routing, budgets, fallbacks and a per-call log LiteLLM, as the named example September 2026

The cache row carries five separate figures and the fifth is the one that gets dropped in retelling: the cache is model-scoped, so a team that switches model mid-task pays every write again. Quote the row, not the headline.


Established

Practice Source What it gives us here
Utility trees, sensitivity points, trade-off points ATAM — Kazman, Klein and Clements, SEI, 2000 priority = value × (4 − complexity), and the ADR trigger
Six-part quality attribute scenarios Bass, Clements and Kazman Source · stimulus · artefact · environment · response · measure
EARS acceptance syntax Mavin, Wilkinson, Harwood and Novak, Rolls-Royce, 2009 The acceptance format a spec-driven tool can read
Architecture decision records Nygard, 2011; MADR One record per sensitivity point, and nowhere else
Walking skeleton Cockburn, Crystal Clear, 2004 Day one of every bolt plan
Risk-first ordering Boehm, 1988 Cut by dependency and unknown, not by priority
One-way and two-way doors Bezos, 2015 letter to shareholders How much evidence a decision owes before it is taken
Least privilege Saltzer and Schroeder, 1975 Read separated from write in the authority budget
Layered defences Reason, 1990; BMJ, 2000 The layer table in a missing-control postmortem
Blameless postmortems Beyer and colleagues, Site Reliability Engineering, 2016 The question is the missing control, not the person
Strangler Fig Fowler, 2004 Route a slice, grow the new, retire the old
Little's law Little, 1961 Queue time = slots needed ÷ slots per day
Confidence bounds for a proportion Wilson, 1927 The lower bound that proves — or fails to prove — a bar
Stratified sampling Neyman, 1934 A sample per slice, rather than one pooled sample
Concept selection by weighted matrix Pugh, 1981 The build/buy/borrow score, and the flip test
Total cost of ownership Gartner, 1987 The three-year cost with the people counted
Stage-gate systems Cooper, 1990 The five gates, and what evidence each needs
Paired indicators Grove, 1983 Every measure reported beside its side effect
Goodhart's law 1975 Why a single number gets pushed
Conway's law Conway, 1968 Why the integration seam follows the team boundary
Shadow deployment, canary release, LLM-as-a-judge General practice The evidence ladder before a cut-over
The bolt as a work cycle of hours or days AWS AI-Driven Development Lifecycle (AI-DLC) The unit that replaces the sprint story

Two of these are cited more loosely than the rest, and it is worth saying so. "General practice" means exactly that — shadow deployment and LLM-as-a-judge are widely used and have no single canonical paper, so treat the technique as established and any threshold attached to it as a working method. And Goodhart's law is a remark about economic policy that the software industry has adopted; it is an established idea, not an established measurement.


The working methods, and how to tune each

These have no external source. They are offered as defaults because they have worked, and they are the parts you should expect to change as you measure.

The structural constructions — argue with their shape, not with a number:

  • The P0–P3 phase names and the eight-loop ring
  • The hard and soft gate split, and the four classification questions
  • The minimum artefact set at each hand-off
  • The eight-field spec and its reading test
  • The acceptance bar formula, and the hold as a documented lever
  • The exact / best-guess / consequential map and its proof column
  • The R1–R5 risk ladder and routing review by band
  • The four bill signatures and the (factor − 1) ÷ days fix order
  • The two-number report and its net line
  • The maturity ladder of six controls

The numeric defaults get an entry each below: what the number is a default for, what evidence would move it, which way it moves in practice, and what breaks at each extreme. Every one of them should have moved at least once by the end of your first year.

5% drift alert

A default for — how far a watched output mix may move, week on week, before the alert fires and re-opens the release gate.

What would move it — the measured natural variation of that mix across a period when nothing changed. Two months of weekly figures gives you the noise band, and the threshold belongs just outside it.

Which way it moves in practice — up, to seven or ten percent, after a first month of alerts on ordinary seasonal traffic. Down only on a mix that has proven itself stable.

Too low — the alert fires weekly on noise, the gate re-opens so often that re-opening stops meaning anything, and somebody mutes the alert rather than investigating the traffic.

Too high — the mix moves for six weeks before anyone looks, which is precisely the failure the alert exists to catch: no deploy, no error, and a slow change of behaviour.

95% shadow agreement over 14 days

A default for — the evidence that ends a shadow run and permits a first cut-over.

What would move it — the desk's agreement with itself. Give two experienced people the same forty cases and measure how often they choose the same answer; a bar above human self-consistency cannot be reached by anything, including another human.

Which way it moves in practice — the percentage usually comes down, towards the desk's own measured figure, and the window usually lengthens instead. Fourteen days sees a normal fortnight and no month-end.

Too low — you cut over on a system that disagrees with the desk once in ten cases, and the disagreements are not randomly distributed; they cluster in the slice you were least sure about.

Too high — 99% agreement is unreachable, the shadow run never ends, and the team concludes that measurement is the obstacle rather than the design.

5% first cut-over

A default for — the share of live traffic the agent handles on the first day it acts.

What would move it — the arithmetic of days of live evidence, days = cases needed ÷ (share × cases per day), set against how long the programme can wait, and the cost of a first-day failure reaching a customer.

Which way it moves in practice — up, in deliberate steps — 5%, then 25%, then all of it — as each slice holds. Down only where the action is irreversible.

Too low — at 1% of 240 cases a day you see two cases a day, so five hundred cases takes most of a year. The evidence never arrives and the pilot dies of slowness rather than of quality.

Too high — at 50%, half your customers meet the first-day failure, and the first day is when the unknown conditions arrive.

MAX_LOOPS = 5

A default for — the number of reasoning loops before a hard stop and a hand-off to a person.

What would move it — the distribution of loop counts across cases that ended correctly. Put the cap above the 99th percentile of successful runs; anything beyond that is not working, it is circling.

Which way it moves in practice — up, to eight or twelve, for research-shaped work with genuine search in it, and down to two or three for narrow tool-calling where a third loop has never once produced a better answer.

Too low — legitimate work is cut off mid-task and handed to a person who has to start again. The cap becomes a cost rather than a guard, and teams route around it.

Too high — a loop that cannot converge burns the budget and hands you an invoice instead of an answer. The cap is what makes that failure cheap, and a cap of fifty is not a cap.

3× cost alert

A default for — when cost per case, measured against the ratified figure, should wake somebody.

What would move it — the observed day-to-day spread of cost per case in steady state, once caching and routing are in place. Three times is a wide net chosen for a system nobody has measured yet.

Which way it moves in practice — down, to 1.5× or 2×, as soon as the number is stable enough to have a distribution.

Too low — the alert fires on ordinary variation, such as a long case or one partner's retry storm, and the team mutes it. A muted alert is worse than no alert, because it is on the maturity checklist as present.

Too high — a 10× threshold catches only a catastrophe. The bills that actually hurt are the 4.4× ones that run quietly for a month.

0.9 rule-extraction confidence

A default for — the score below which a rule extracted from legacy code gets a human check before it enters a spec.

What would move it — a calibration sample. Take fifty extracted rules spread across the confidence range, have someone verify each against the source line, and put the threshold where the error rate crosses what the downstream use can tolerate.

Which way it moves in practice — up, to 0.95, for rules that decide money or eligibility. The calibration usually also shows that the scores themselves are optimistic, which matters more than where the line sits.

Too low — at 0.6 unchecked rules enter the spec, and a wrong rule is invisible until it is enforced on a customer, by which time it has a test defending it.

Too high — at 0.99 everything goes to a human, which is the manual reading of the legacy system you were trying to avoid.

50-then-500 golden cases

A default for — the size of the golden set: fifty real, tagged cases to cross the P1 → P2 gate, five hundred before a bar is called proven.

What would move it — n = z² × p(1 − p) ÷ (p − bar)², computed per slice against that slice's own bar. That number replaces the default, and it is the only honest answer to "how many do we need".

Which way it moves in practice — up, sharply, for any slice whose score sits close to its bar: a 2.4-point gap needs about 968 cases. Down for a slice with a comfortable margin.

Too low — fifty cases cannot prove anything tighter than a very wide bound, so a harness built on them is a smoke test wearing the word evidence.

Too high — a golden set larger than the team can curate goes stale, and a stale set is more dangerous than a small one because it is trusted.

One unknown per bolt

A default for — how much uncertainty a single day's work may carry.

What would move it — what actually happened on the days that failed. Count the bolts that ran over and how many unknowns each was carrying; the answer is usually two.

Which way it moves in practice — it holds. The pressure is always to carry two, and the discipline is to split the bolt rather than to raise the number.

Too low — zero unknowns is not a bolt, it is a task. A plan made only of tasks has pushed all of its risk to the end, which is the shape this practice exists to break.

Too high — with two unknowns in a day, a failed day cannot tell you which one failed, and daily evidence loses the property that made it worth the ceremony change.


When a figure goes stale

Staleness is normal and it is not a scandal. What matters is that it is found rather than discovered by a customer or an auditor.

How you find out What it usually means First move
The next-check date in the verification log Nothing yet — this is the healthy case Re-read the source and record the date
Your modelled cost and the invoice disagree A price, a rate or a discount moved Re-read the pricing page before blaming the code
A vendor announcement or changelog entry A window, a minimum or a model family changed Re-read, then check which qualifiers moved
A reader reports it The figure was wrong or has been wrong for a while Thank them, fix it, credit them in the row
Nobody can say where a slide's number came from It has no source and never had one Strike it, or find the source and date it

What to do, in order.

  1. Re-read the source and record the new value beside the old one. A change with no "was" is a rewrite rather than a correction, and it destroys the reader's ability to tell whether their own copy is out of date.
  2. Re-run the arithmetic that used it. A moved price changes a break-even, and a break-even is usually quoted in three places.
  3. Fix this page, then the pages that quoted it. The verification log's "where each figure is used" table exists for this ten minutes.
  4. Say what changed and when, in the corrections section. A wiki whose corrections are invisible reads as a wiki that has never been wrong, which nobody believes.

This wiki can be corrected without a pull request. Anyone with repository access clicks Edit — no branch, no review queue, no waiting for a maintainer. That is deliberate: a wrong figure that takes a week to fix is worse than a wrong figure that takes four minutes, and every edit is a git commit that can be read and reverted. Run python3 wiki/check.py if you have touched links, tables or fenced blocks; it is the only gate this wiki has, and it is a fast one.

The counterpart of that speed is the test in Contributing to this Wiki: would being slightly wrong for a week be acceptable? Figures that fail that test — anything a contract, a regulator or a release decision rests on — belong behind review in the repository, with this page linking to them rather than copying them.


Industry measurements quoted

Treat these as dated observations about a fast-moving field, not as constants.

Figure Source
90% of developers use AI at work DORA 2025, ~5,000 respondents
80% report a productivity gain DORA 2025
30% place little or no trust in AI-generated code DORA 2025
16% of organisations deploy on demand; most deploy less than monthly DORA 2025
42% of committed code is AI-assisted, by developers' own estimate Sonar 2025 survey
Median time a pull request sits in review rose sharply in 2026 Faros AI, 22,000 developers, 2026
31% more pull requests merging with no review at all Faros AI, 2026
98% more pull requests merged per developer, while org-level delivery stayed flat Faros AI, 2025, 10,000 developers
66% more epics completed per developer once organisations adapted Faros AI Engineering Report, 2026
Multi-agent delegation paid off on routine work, not on the hardest problems Anthropic, on its own multi-agent research system

The two Faros lines that matter most are the last two taken together: more changes are produced; the same number of people read them. That is the argument for review by risk band, stated in data.

A survey is not a measurement

Half of the table is self-report and half is system data, and they support entirely different sentences. DORA's 80% is the share of people who say they are more productive; it is evidence about belief, and the same survey's 30% who place little or no trust in AI-generated code is the same population reporting the opposite feeling. Both are real findings about what developers think. Neither is a measurement of output. Sonar's 42% is an estimate developers made about their own code — a plausible one, and still an estimate.

Kind Example here What it can support What it cannot
Self-report "80% report a productivity gain" That a belief is widespread, and worth taking seriously That the gain exists, or how large it is
System measurement "31% more pull requests merging with no review" That a behaviour changed, at that population Why it changed, or whether the change was worth it
A vendor's own account Anthropic's multi-agent research system A hypothesis worth testing on your own work A generalisation to your workload

Three more cautions on this table. The respondent counts — ~5,000, 22,000, 10,000 — are population sizes, not error bars: none of these figures is published here with an interval, so a few points of difference between one year and the next is not a trend. The populations differ, so DORA and Faros are not comparable to each other. And a vendor reporting on its own system has an interest in the result, which does not make Anthropic's finding wrong — it makes it a hypothesis for your workload, and its shape is worth keeping: delegation paid on routine work and not on the hardest problems.

The honest use of this whole section is as an argument for a measurement, never as a substitute for one. Your own two-number report on your own traffic outranks every row above it.


Where a model helps

Tool Use it for
Chat LLM Turning a vendor's pricing page into a verification-log row: figure, unit, qualifiers, next check. Ask for the source sentence quoted beside each number, so you are checking the reading rather than the summary
Claude Code Finding every place a figure appears — cost models, decision records, slides, this wiki — so a changed number arrives with a complete list of what to update. This is the step that is skipped by hand
Chat LLM Reading a claim back and asking which of the three marks it deserves, with the reason. It is good at catching a working method presented as a finding, which is the failure this page exists to prevent
Do not delegate Reading the vendor's page. A model's recollection of a price is not a source, and a summary of a documentation page is not a reading of it — the date beside the figure is your name on it

Corrections

Prices drift, documentation moves, and measurements are superseded. If a figure here is wrong or out of date, that is worth reporting and it will be fixed with credit:

Useful reports carry three things: what the page says, what the source says now, and a link to the source. A report with those three is a four-minute fix. Without them it is an afternoon of someone re-reading documentation to work out which of you is right.

A source and a date beat an opinion.


Next: Glossary · Formulas and Calculators · The Agentic PDLC · Contributing to this Wiki

🗺️ Navigate

🏠 Wiki Home

▶ Start

▶ Start here · 55 lessons, on the site ↗

  1. Getting started · 2
  2. Agentic PDLC fundamentals · 9
  3. Methods decoded · 7
  4. Running delivery · 13
  5. By role · 9
  6. Teams and organisation · 4
  7. Practice · 4
  8. Interviews and careers · 7

📗 Method and reference

The method
The Agentic PDLC
The Eight Loops
Gates & Governance
The Evidence Pack

The journey · end to end
Product manager
Solution architect
Engineering lead
QA lead
DevOps & platform

The method · by role
Product manager
Solution architect
Engineering lead
QA lead
DevOps and platform
Sponsor

How to
Run an NFR workshop
Design an agent on paper
Build, buy or borrow
Cut sprints into bolts
Review by risk band
Prove the bar
Control the token bill
Hold the security boundary
Run a missing-control postmortem

Reference
Mental Models
Glossary
Formulas & Calculators
Decision Trees
Scenario Library
Exercises & Answers
Anti-Patterns
Sources & Confidence
Where do I find…?


📚 Course and labs

The course companion · Labs

The 16 modules
  1. Agentic Foundations
  2. LLM Intuition and the AWS Bridge
  3. Amazon Bedrock Essentials
  4. Amazon Bedrock Agents
  5. Agent Builder, Knowledge Bases and Guardrails
  6. The Agent Loop: No Framework to Strands
  7. Strands Foundations: Tools, Memory and MCP
  8. Multi-Agent Patterns with Strands
  9. LangChain and LangGraph
  10. LLM Memory Mechanics
  11. RAG, OpenSearch and LiteLLM
  12. Amazon Bedrock AgentCore
  13. A2A and A2UI: Agent Interoperability
  14. Agentic QA and Evaluation
  15. End-to-End Production Pipeline
  16. Agentic Product Lifecycle

Learning paths · Field guide
Study Plans


🎓 Cohort kit

Cohort Kit · Session template

Eight sessions
  1. Kick-off
  2. Frame and spec
  3. Build, run and the loops
  4. Methods decoded
  5. Plan and review
  6. Prove and ship
  7. Govern and scale
  8. Practice and roles

💬 Community and maintenance

Living notes
Error Index
Community Answers
Field Notes
Model & Region Notes
Cost Log
Scoreboard 🧪

The project
Roadmap
Editing this wiki
Maintainer Runbook


📦 Elsewhere

📘 The manual · live
🛫 Ninety Days, the simulator
🧰 The workbench
👔 For leadership
🧠 Mental models
Templates · Prompts
Frameworks & acronyms
The repository · Setup

Pinned discussions
Discussion map — where to post what
Exercise & lab index
Simulator Arena — get a lab graded
Pitch an idea
All discussions →

Clone this wiki locally