Repository navigation
AVM Floor Raising
A floor raise increases the minimum reserve-denominated redemption value of AVA while preserving the live price. The AVM specification defines the schedule and backing; this page specifies the proposal and acceptance conditions. A surplus-funded variant is described in Floor Investment.
Let the old floor, ramp start, ramp end, progress, and circulation be
The characteristic
The new ramp is anchored to unchanged main:
For exact continuity,
The old and proposed backing are
An exact area-preserving raise requires
The second term is essential after floor issuance or special floor redemption. Integrating only from zero to progress is insufficient when circulation differs from progress.
Both held reserve
Within a nonempty ramp,
Moving the ramp end forward replaces part of the old main tail with a lower ramp. This can offset the extra backing required by the higher floor. A valid proposal balances the complete backing expression, including the physical floor tail. The operation redistributes existing backing from price-sensitive value into floor value.
The available raise depends on the current geometry, characteristic,
circulation, and progress. Every proposal must satisfy the complete geometry and
backing checks above. The condition
Let
| Allowance | Units | Required interval for the entire calculated enclosure |
|---|---|---|
| Reserve per AVA | ||
| Reserve |
An upward floor-join step may be allowed; a downward step is rejected. The
backing allowance permits only a bounded decrease, never an increase. The upper
bound for
The two allowances are independent. Neither permits the main offset to change. They are absolute quantities in the stated units, not percentages. Exact preservation sets them both to zero; a coarse numeric grid may require a small conservative allowance to admit a candidate.
A proposer can solve for geometry off-chain and submit the resulting floor increment, ramp end, and width. Acceptance checks the supplied candidate against all constraints; it does not rely on the proposer's claimed precision or reserve calculation. A candidate that cannot be certified within the allowances is rejected.
Linear AVM Floor Raising gives closed-form equations and a complete example for the linear characteristic. A shared numerical search can also find candidates using characteristic values and integrals. The grid and the precision of the engine's bounds affect which candidates it can certify.
AVM
AVM features
Linear AVM
Referral network
- Overview
- Rationale
- Specification
- Parameters and authority
- Family marketing
- Choosing a parent
- Diagrams
Credits
- Mayflower Credits
- Earning credits
- Channel weighting
- Credits and revenue clearing
- Long-term economics
Credit emissions
- Overview
- Emission rate and cumulative budget
- Lane allocation
- Participation and referral rewards
- Accrual, collection, and conservation
Revenue clearing