Skip to content

Linear AVM Evolution

mister-mayflower edited this page Nov 9, 2026 · 3 revisions

This page specializes AVM Evolution to the linear characteristic. Use floor $F$, main slope $m\gt 0$, ramp slope $a\gt m$, main intercept $b$, ramp intercept $c=b-(a-m)E$, joins $A,E$, progress $P$, circulation $T$, and floor tail $J=T-P+A$.

Purchase

An ordinary purchase of $n$ AVA pays

$$C=n\left(mP+b+\frac{mn}{2}\right)$$

before fees and sets $P'=P+n$, $T'=T+n$. Geometry and both intercepts stay fixed. The purchase starts on main because $P\ge E$.

Sale ending on main

Let $Q=\max(P-n,0)$. If $n\le P$ and $Q\ge E$, the gross sale proceeds are

$$V=n\left(mP+b-\frac{mn}{2}\right).$$

The sale lies entirely on main. Set $P'=Q$, $T'=T-n$ and leave geometry unchanged.

Sale ending inside the ramp

If $A\lt Q\lt E$, quote the sale over the old ramp and main intervals, then set

$$A'=A,\quad E'=Q,\quad W'=Q-A,\quad b'=b+(a-m)(Q-E).$$

The new main connects at the sale endpoint:

$$mQ+b'=aQ+c.$$

Its intercept decreases, while the retained ramp intercept remains $c$. Progress becomes $Q$ and circulation becomes $T-n$. The next purchase follows the new main from $Q$.

Sale ending in the floor

If $Q\lt E$ and $Q\le A$, quote the sale on the old schedule and then collapse the ramp:

$$A'=E'=Q,\quad W'=0,\quad b'=F-mQ,\quad c'=F-aQ.$$

The new live price is $mQ+b'=F$. The floor is unchanged. The intercept $b'$ can be higher or lower than the old intercept; the defining rule is attachment at $(Q,F)$, not a universal downward shift of the entire main line.

With circulation different from progress, a complete redemption can leave $T'=0$ but positive $P'=Q$.

Sale exceeding progress

When floor issuance has made $T\gt P$, an ordinary sale can have $P\lt n\le T$. It pays

$$V=\int_0^P y(x)\,dx+F(n-P)$$

before fees, sets $P'=0$ and $T'=T-n$, and applies the same contraction rules. If $E\gt 0$, the ramp collapses at zero. If $E=0$, geometry is unchanged; the sale still needs the separate $F(n-P)$ term rather than the main-only formula.

Ordinary floor raise

A raise preserves $m,a,b,P,T$, increases $F$, and selects $A',E'$ with $A'\ge A$, $E'\ge E$, and $A'\le E'\le P$. Exact continuity gives

$$c'=b-(a-m)E',\qquad F'=aA'+c'.$$

Required backing stays fixed in the exact area-preserving model. The new ramp width may increase or decrease. Linear AVM Floor Raising gives the constant-backing solution, including the case $T\ne P$.

Floor investment

The same boundary and join rules apply, with main intercept $b$ still unchanged. The difference is the backing policy: a nonnegative increase must fit the permitted budget and available surplus. A fixed-end investment can narrow the ramp to zero width. See Linear AVM Floor Investment.

Floor issuance and special floor redemption

Authorized issuance of $n$ AVA at the floor sets

$$T'=T+n,\quad J'=J+n,\quad B'=B+Fn.$$

Special floor redemption of $n\le J$ sets

$$T'=T-n,\quad J'=J-n,\quad B'=B-Fn.$$

Both leave $P,F,A,E,b,c$ unchanged. No line translates and no boundary moves. The corresponding reserve payment, fees, authorization, and collateral checks must settle with the state change.

Example of contraction

Start from $m=8$, $a=25/2$, $b=1$, $F=16$, $A=3$, $E=5$, $P=T=6$. Sell two AVA, leaving $Q=4$ inside the ramp. Gross proceeds on the old schedule are 45 from $[5,6]$ plus $(57/2+41)/2=139/4$ from $[4,5]$, totaling $319/4$.

The new main intercept is

$$b'=1+\frac92(4-5)=-\frac72,$$

so its price at progress four is $8\cdot4-7/2=57/2$, equal to the old ramp price there. Required backing becomes $150-319/4=281/4$. The floor stays 16. These amounts exclude fees and fixed-point rounding.

Clone this wiki locally