Skip to content

Linear AVM Specification

mister-mayflower edited this page Nov 15, 2026 · 4 revisions

The linear AVM uses $g(x)=mx$ in the general specification, with fixed main slope $m\gt 0$ and ramp multiplier $k\gt 1$. Write $a=km$ for the ramp slope, so $a\gt m$. The formulas here assume exact continuous joins; numerical acceptance follows the general specification.

State and schedule

Symbol Meaning
$F$ Floor price
$b$ Main intercept
$E$ Ramp end
$W$ Ramp width
$A=E-W$ Ramp start
$P$ Pricing progress, with $P\ge E$
$T$ Circulating AVA quantity
$J=T-P+A$ Physical floor-tail quantity, with $J\ge0$
$c=b-(a-m)E$ Derived ramp intercept

The schedule consists of

$$\text{floor}:F,\qquad R(x)=ax+c,\qquad M(x)=mx+b.$$

Floor applies for $x\le A$ below $E$, ramp for $A\lt x\lt E$, and main for $x\ge E$. At a zero-width ramp, main takes precedence at the common endpoint. Exact continuity at the floor requires

$$F=aA+c.$$

The joins can equivalently be recovered from the intercepts:

$$A=\frac{F-c}{a},\qquad E=\frac{b-c}{a-m}.$$

The relation for $E$ follows from the ramp and main intersection. The relation for $A$ assumes a continuous floor join. With a permitted numerical upward gap, the stored start $A=E-W$ gives the boundary, subject to the explicit floor-join check.

Launch has $P=T=E=A=0$ and $b=F_0$. Subsequent floor raises preserve $b$; ordinary redemption into the ramp or floor can change it. Floor issuance changes neither intercept nor either boundary.

Required backing

Let $y_E=mE+b$ and $y_P=mP+b$. The floor, ramp, and main contributions are

$$B=FJ+\frac{F+y_E}{2}(E-A)+\frac{y_E+y_P}{2}(P-E).$$

An equivalent expression convenient for floor-raise calculations is

$$B=\frac{mP^2}{2}+bP+(T-P)F +\frac{aA^2-(a-m)E^2}{2}.$$

These formulas include circulation that differs from progress. Held reserve $H$ and outstanding collateralized advances $D$ must cover $B$; liquid payouts also require sufficient $H$ after combined settlement. The reserve need not equal $B$ when surplus exists.

Example

Choose $m=8$, $k=25/16$, so $a=25/2$, with $b=1$. After issuing six AVA from launch, $P=T=6$ and required backing is

$$B=\frac{8\cdot6^2}{2}+1\cdot6=150.$$

A floor raise to $F=16$, $A=3$, $E=5$ preserves that backing. The ramp intercept is $c=1-(9/2)5=-43/2$. Its price runs from 16 to 41; main ends at 49:

$$B=16\cdot3+\frac{16+41}{2}\cdot2 +\frac{41+49}{2}\cdot1=48+57+45=150.$$

Ordinary issuance

An issuance of $n\gt 0$ begins on main and costs

$$C=n\left(mP+b+\frac{mn}{2}\right).$$

It sets $P'=P+n$, $T'=T+n$, without changing geometry. The gross average fill price is $mP+b+mn/2$, and the new spot price is $m(P+n)+b$. Fees are additional.

Ordinary redemption

For $0\lt n\le T$, let $Q=\max(P-n,0)$. Split $[Q,P]$ at $A$ and $E$ and sum the areas on the old schedule. For a linear segment $sx+t$ over $[u,v]$:

$$\int_u^v(sx+t)\,dx=(v-u)\frac{(su+t)+(sv+t)}2.$$

Use $s=0,t=F$ for floor, $s=a,t=c$ for ramp, and $s=m,t=b$ for main. Add $F\max(n-P,0)$ for any quantity beyond progress. This gives gross proceeds; fees and numerical backing deductions affect the actual payout.

Then set $P'=Q$ and $T'=T-n$ and apply contraction:

Remaining progress New boundaries New main intercept
$Q\ge E$ Unchanged $b'=b$
$A\lt Q\lt E$ $A'=A$, $E'=Q$ $b'=b+(a-m)(Q-E)$
$Q\lt E$ and $Q\le A$ $A'=E'=Q$ $b'=F-mQ$

Inside the ramp, its intercept $c$ stays fixed. On floor collapse, the derived ramp intercept becomes $c'=F-aQ$, but the ramp has zero width. The next purchase starts on main. See Linear AVM Evolution.

Floor operations

Floor issuance of $n$ AVA adds $Fn$ backing and changes $T$ to $T+n$. Special floor redemption of $n\le J$ removes $Fn$ backing and changes $T$ to $T-n$. Both preserve $P,F,A,E,b,c$.

A floor raise increases $F$, preserves $P,T,b$, and supplies $A',E'$ with $A'\ge A$, $E'\ge E$, and $A'\le E'\le P$. The new ramp intercept is $c'=b-(a-m)E'$. Its exact floor join requires $F'=aA'+c'$.

Linear AVM Floor Raising solves the constant-backing case. Linear AVM Floor Investment calculates the surplus-funded increase.

Price sensitivity and exposure

The slopes are sensitivities to progress, in reserve-per-AVA per AVA. They are not statistical measures of volatility. Ordinary buys use slope $m$; a sale can cross the steeper ramp before reaching floor-priced units.

The backing decomposes as $B=FT+(B-FT)$. The first term is gross floor backing; the second is value above the floor. Neither the current spot quote nor a rising floor establishes an individual holder's realized return. Cost basis, trade size, fees, reserve denomination, and advances all affect that outcome.

Clone this wiki locally