Release Plan

Flavio Giacchetti edited this page Oct 4, 2026 · 3 revisions

Recovery Horizon release plan

The maintainer selected immutable existing work IDs and separation by release.

Release Scope
1.9.0 Disk and bootable recovery foundation
1.9.1 Clone Explorer; legacy CLI discovery, help and completion
1.9.2 Portable recovery
1.9.3 Offsite protection
1.9.4 Unified recovery experience
1.9.5 Continuous recovery assurance; preserved resource CLI rework
1.9.6 Binary source control foundation
1.9.7 Binary collaboration and scale
1.9.8 Stability and LTS baseline

1.9.0 keeps its March 26, 2027 planning target. Later releases remain unscheduled; September 24, 2027 is the existing family horizon, not a per-release commitment. All branches preserve prior work and require predecessor integration and native qualification before promotion. The supplied BSC VS-1970–1982 aliases map to canonical VS-1981–1993, issues #703–715; existing CLI IDs are not reused.

Canonical family contract and detailed crosswalk contains complete stable gates and branch workflow. Development status separates implemented slices from pending engines and release evidence.

One draft PR per release

Release Sole PR Work present
1.9.0 #736 Foundation contracts, safety/maintenance, dependency cleanup and tracking
1.9.1 #746 Explorer contract; legacy CLI discovery, bundled guides/completion and console fix
1.9.2 #752 Portable metadata/contract scaffold
1.9.3 #753 Offsite metadata/contract scaffold
1.9.4 #754 Unified recovery metadata/contract scaffold
1.9.5 #747 Assurance contract and preserved resource CLI/fixes
1.9.6 #755 BSC foundation scaffold
1.9.7 #756 Collaboration/scale scaffold
1.9.8 #757 Stability/LTS scaffold

All remain draft. Preparation heads preserve protected release history; no release has been promoted. Original duplicate PRs are superseded and retained.