You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Marcel1853 edited this page Oct 27, 2026
·
1 revision
Relay
Let trains run only part of the way and hand the wagons over.
Give a wagon yard a relay number (station window), e.g. 1.
Wire the signal Relay with value 1 to the train stop of a requester (or provider).
Deliveries to it then stop at that wagon yard after loading: the train leaves its wagons there and its locomotives
return to their depot. The delivery stays with the wagons.
The next train that picks up the wagons at a wagon yard takes the delivery on to the requester.