Roadmap and status

Four phases. Status is taken from what exists in the repository: "draft" means the work product is written but not reviewed, and nothing is called complete before its review. This table mirrors the roadmap in the README; a status changes here only when the owning work product changes its document-control header.

Roadmap. Phase 1 Foundation and Phase 2 Safety Engineering active; Phase 3 Implementation and Verification and Phase 4 Expanded Assurance planned.

Phase State
1 · Foundation Active
2 · Safety engineering Active
3 · Implementation and verification Planned
4 · Expanded assurance Planned

Where each phase stands

Phase Work Status
1 · Foundation Project governance and safety plan Draft
Upstream baseline gap assessment Draft
Assurance data model and traceability data Draft; hazards, goals, assumptions and safety case recorded, requirements not yet
2 · Safety engineering Hazard analysis and functional safety concept Draft
SOTIF analysis, cybersecurity analysis, AI safety requirements Draft
Architecture analysis: technical safety concept, FTA and FMEA, dependent failure analysis, STPA Draft
Field monitoring, safety anomaly and root cause process; first case FI-2026-001 (NHTSA PE26007) Draft
3 · Implementation and verification Safety mechanisms from the technical safety requirements Planned
ISO 26262-6 software lifecycle (Clauses 5 to 11) Specified; starts after the Part 2 to 4 work products and supporting processes are approved
Automated verification of the inherited safety code: unit tests, coverage gate, MISRA, mutation Running in CI; not yet reviewed as evidence
Regression testing, simulation, fault injection, evidence generation Specified, not executed
4 · Expanded assurance More evaluated configurations, independent review, living safety-case maturity, continuous assurance, community contributions Planned

What the next gate needs

Gate roadmap from the project plan: gates G0 to G6 and the work products each one needs.

Figure 5-1 of WP-M-03 project plan, generated by fig_m_management.py and checked by CI.

Phase 3 starts when the Part 2 to 4 work products and the supporting processes have passed confirmation review (WP-P-05). Until then every claim in the safety case stays at zero accepted evidence by design: evidence is recorded first and accepted only after independent review. The gates themselves are defined in the project plan, and the questions that still wait on the project lead are in the decision register.