PLAT-069 — nothing measures whether a workflow is getting cheaper, faster, or more accurate over time

Coordination Value
Assigned agent unassigned
Ticket state open — design below; data sources verified present
Last synchronized 2026-08-10
  • Priority: P1 — this is the measurement that tells you whether Pulse is working at all
  • Owner: Pulse trend measurement + Pulse popup
  • Requested: 2026-08-10, directly by the operator

The gap

Every accounting surface built to date answers "what did this run cost?". Nothing answers "is this workflow improving?" — the question that decides whether the whole self-improvement loop is earning its keep.

Concretely, none of these can be answered today without hand-querying files:

  • Is cost per run trending down?
  • Is wall-clock per run trending down?
  • Is the evaluation score trending up?
  • Did a specific Pulse fix actually move any of them?

Without this, Pulse can run indefinitely, close findings, report healthy — and nobody can tell improvement from churn. It also makes every efficiency finding unfalsifiable: a tier downgrade "for cost" has no before/after it is ever checked against.

The data already exists — this is a join, not new collection

Verified present, per workflow, going back to 2026-04:

source provides
costs/execution/<group>/<date>.json per-execution, per-step, per-model USD + full token breakdown
costs/evaluation/<group>/<date>.json evaluation-pass cost
costs/phase/daily/<date>.json per-day, per-phase, per-model USD
scores/evaluation/<group>/<date>.json per-evaluation step_scores[] with score / max_score
runs/<run>/logs/<step>/execution/*-timing.json per-step wall/LLM/tool duration (now incl. reflection-timing.json)
pulse_goal_observations recorded goal-criterion observations
pulse_interventions, pulse_impact_assessments what Pulse changed and when

Nothing new needs collecting. What is missing is a per-run series joining date → cost → duration → eval score %, and a place to see it.

Design

1. A durable per-run trend row. On run completion, write one record keyed by run: date, group, run id, total USD, total wall duration, eval score achieved/possible, and the run's terminal status. Derived entirely from the sources above, so it is reproducible and backfillable rather than a new source of truth. Backfill from April so the series is useful on day one instead of in three weeks.

2. Normalisation is the hard part — get it right or the trend lies. Runs are not comparable by default:

  • a propose_new route run and an execution route run do different work; compare like-for-like by route, never pool them;
  • a run that legitimately did more (bid on 3 jobs vs 0) costs more without being worse — normalise per unit of work where a unit exists, and where it does not, say so rather than implying a clean comparison;
  • eval score is only comparable while the rubric is unchanged; evaluation_plan.json changes must break the series visibly, not silently shift the baseline. Record the rubric version alongside the score.

3. Surface it in the Pulse popup as a trend, not a number: cost/run, duration/run, and score% over time, with Pulse interventions marked on the timeline so a change and its effect are visually adjacent. The operator's stated ask is exactly this — "if cost/time is going down over time and accuracy towards goal is going up".

4. Make it Gate-visible. Once the series exists, a sustained adverse trend is itself evidence a module is due — which is what turns this from a dashboard into part of the loop.

Deliberate non-goals

  • Do not auto-act on the trend initially. Report it, let it be judged. A metric that immediately drives automated change cannot be validated against reality first — and the existing project_metrics_and_scoring_removed decision is precedent for being wary of scoring that acquires authority before it has earned it.
  • No new cost/score collection. If the trend disagrees with the ledgers, the ledgers win; this is a view over them.

Acceptance

  • A per-run series exists per workflow, backfilled from existing files, reproducible from them.
  • The Pulse popup shows cost/run, duration/run and score% over time with interventions marked.
  • Route and rubric-version boundaries are explicit in the series; pooled or cross-rubric comparisons are never presented as clean.
  • A stated improvement claim from a Pulse finding can be checked against the series.