PLAT-117 — a dropped UI progress event can permanently prevent a turn from completing

Coordination Value
Assigned agent unassigned
Ticket state implemented — liveness fix shipped and fail-before/pass-after verified; one further decoupling designed but deliberately not built (see last section)
Last synchronized 2026-08-17

2026-08-20 follow-up — unified execution tracker remained busy

The Social Media run in session schedule-manual--5227790a_1787203229327335000 exposed one more copy of the same lifecycle record. At 15:53:43 IST, parent workflow-full-mt12p13b01 reconciled orphan progress child workflow-full-mt12p13b01-step-0-mt17a9lh09. Its background-agent record and terminal became terminal, and the provider turn, finalizer, schedule run, and foreground session all later settled. Global Monitor nevertheless continued to show [Execute] Run Today's Actions as running.

The authoritative runtime snapshot made the split explicit:

  • raw_session_status=completed
  • foreground_turn.busy=false
  • terminal_busy=false
  • runtime phase running only because tracked child execution is active

workshopExecutionBgNotifier.OnExecutionComplete called ReconcileOrphanedProgressChildren and emitted the durable completion, but it did not call completeTrackedExecution for each reconciled orphan. The unified tracker therefore retained a second, independently-running copy that powers /api/workflow/running and Global Monitor.

Repair: orphan reconciliation now settles the background-agent record, the unified tracked execution, and the durable completion together. A product-path regression test starts the real parent/orphan pair, completes the parent through workshopExecutionBgNotifier, and proves the Global Monitor list becomes empty. Keeping the retained tmux session alive is intentionally unrelated to this busy signal.

  • Priority: P0 — this is the mechanism behind the social-media false-failure emails. It makes terminal() unreachable, so an affected turn is guaranteed to end in an idle-wait timeout no matter how well the underlying work went, and the operator is then told the workflow never ran.
  • Owner: background-agent registry (background_agents.go), conversation turn lifecycle (conversation_turn_lifecycle.go), workflow progress bridge (planning_exports.go), workshop execution notifier (delegation.go)
  • Related: PLAT-116 (the false-failure symptom this explains), PLAT-071) (regressed separately, see below), PLAT-091) (ReconcileOrphanedProgressChildren, the compensator this makes unnecessary for liveness), PLAT-114 (durable log rows left permanently running by the same omission), PLAT-112) (turned off the only individual consumer of these records)

The category error

workflowProgressBridge (planning_exports.go:1756-1793) turns each workflow step's start/end progress events into a background-agent record, so the UI can show per-step progress. workshopExecutionBgNotifier registers them, and its own doc comment states the intent plainly:

registering workshop step/background executions in bgAgentRegistry so that HasRunningAgents() returns true and the frontend keeps polling for events

That intent is a display concern. The problem is that bgAgentRegistry answers two very different questions from one data structure:

Question Read by Needs
"Is background work happening?" (display, polling) HasRunningAgents() — 9 call sites best-effort is fine
"May this turn finish?" (lifecycle) conversationTurnTreeSnapshot → RunningChildren → terminal() must be exact

Progress mirrors are produced by best-effort event pairing: a start mints an ID cached under agentType:stepIndex:agentName, and only a matching end closes it. Any dropped, mismatched, or never-emitted end leaves a record open forever. That is tolerable for a spinner. It is not tolerable for turn completion — and today it feeds both.

So a dropped UI progress event can permanently prevent a real turn from completing. The work itself is meanwhile recorded in two more reliable places: the run's own durable per-step files on disk (runs/<iteration>/<group>/execution/<step>/session.json — what Pulse Gate actually reads), and the parent workflow-full-<id> agent, which is registered for the entire run and already supplies the aggregate display signal.

Live evidence (social-media, 2026-08-16)

Session schedule-manual--5227790a_1786893680879441000, schedule 5227790a ("Daily Execution x3").

  1. 15:22:25Z parent workflow-full-msvyee8q01 starts. Two step-0 progress mirrors open at 15:25:39Z and 17:46:32Z (same step index, different agentType/agentName keys) and never receive an end event.
  2. 18:57:13Z the parent completes — the real work is done.
  3. 00:27:13 IST ReconcileOrphanedProgressChildren (PLAT-091) settles both orphans via agent.SetError(...). That sets Status=Failed and CompletedAt, but does not mark them notified and never calls emitBackgroundAgentCompleted.
  4. conversation_turn_lifecycle.go:209-211 deliberately counts a completed/failed-but-unnotified child as running (an anti-race measure for real children). Both orphans therefore stay "running" permanently.
  5. terminal() requires RunningChildren == 0. With two permanent phantoms the tree can never be terminal — the turn was structurally guaranteed to time out regardless of what the provider did.
  6. Worse, RunningChildren > 0 also triggers the three-hour schedulerWorkshopLiveChildCeiling grace, so the run burned 4h09m instead of failing fast.
  7. The turn's real answer arrived 00:50:43 IST — "Done — the pinned execution route ran exclusively... One original post landed and was verified" — with a real post live on X. Ten minutes of no further progress later, the wait timed out at 01:00:43 reporting running_children=2, and the operator was emailed "Workflow did not start. No results were produced."

Corroboration from PLAT-114's durable log: those exact two agent ids (workflow-full-msvyee8q01-step-0-msvyijui03, -step-0-msw3jq3i0f) are still stored status='running', completed_at=NULL, because step 3's omission also skips the durable-log completion hook. Same omission, two visible symptoms.

Why the existing compensator did not save it

ReconcileOrphanedProgressChildren exists precisely to settle orphans left by missing end events ("a finished parent cannot still have live progress children"). It is a compensator for unreliable event pairing, and it has its own gap: it settles the record's status but not its notified flag, and the liveness snapshot treats settled-but-unnotified as running anyway. Making the compensator more correct is not the fix — the fix is that a progress mirror should not be able to hold a turn open in the first place.

Required repair

1. Make the distinction first-class, not an inline filter. One authoritative predicate for "this record is a progress mirror, not work", derived from the declared Kind (workflow_step) with the legacy execution_type metadata fallback, mirroring the existing isWorkflowStepTrackingExecution classification. Not re-sniffed per call site.

2. Split the two registry questions explicitly so a future consumer must choose rather than inherit the wrong one by default:

  • HasRunningAgents() — unchanged, the display question. Progress mirrors still count, so no UI/polling regression at any of its 9 call sites.
  • a new work predicate — excludes progress mirrors — documented as the question lifecycle code must ask.

3. conversationTurnTreeSnapshot counts only real work in RunningChildren. Progress mirrors still contribute LastProgressAt: an advancing step is real evidence the turn is alive, it just cannot hold the turn open by itself. Excluding them cannot end a turn early, because a step record is minted from its parent's id (fmt.Sprintf("%s-step-%d-%s", b.parentID, ...)) and so can never outlive a parent that is not itself registered.

4. Fix ReconcileOrphanedProgressChildren to settle completely — mark notified and emit the completion — so PLAT-114's durable log stops accumulating permanently-running rows. Still required after (3), because the log is wrong today independently of liveness.

5. Restore PLAT-071 (separate regression, found while investigating this). Its fix shipped 2026-08-10, was extended by PLAT-084 on the 11th, and was dropped whole on 2026-08-13 by d18e071e1 ("Unify scheduled turn lifecycle and runtime tab routing") when waitForWorkshopIdle was replaced by waitForConversationTurnTree. workshopRunStartedDuringInvocation has had zero callers since, and ProducedRunEvidence is once again only computed on the success path — so any failed turn reports "the workflow did not run" without anything having looked. Both its unit tests still pass, because they call the helper directly instead of driving executeWorkshopJob.

Not fixed here

  • Whether these registry records need to exist at all. They exist to keep the frontend polling, but the parent already supplies that aggregate, the per-step events reach the UI independently of the registry, and PLAT-112 (2026-08-16) turned off the diagnostic rail that was their only individual consumer. Deleting the mirror — and ReconcileOrphanedProgressChildren with it — is likely correct and strictly simpler, but requires proving the runtime tab's live progress is event-driven rather than registry-driven. Deliberately not assumed.
  • PLAT-116's own root cause is narrowed but not closed by this. This explains the running_children=2 incident completely; the earlier running_children=0 incident (2026-08-16 19:08) has a different shape and still needs its own trace.

Acceptance

  • A turn whose only outstanding children are progress mirrors reaches terminal() and completes normally.
  • HasRunningAgents() behaviour is unchanged at all 9 call sites.
  • An orphaned progress mirror settles completely: not counted as running, and written to the durable log as terminal.
  • A failed turn that produced real run evidence never reports "the workflow did not run".
  • Every one of the above is proven by a test that reaches the state through the product path, not by constructing it — the specific gap that let PLAT-071 be deleted with its tests still green.

Correction (2026-08-17): the first predicate missed the actual records

The first version of IsProgressMirror matched Kind == "workflow_step" (plus the legacy execution_type metadata). Checked against the live durable log while investigating a later run, the two orphans that caused this incident are stored kind=orchestrator — so the predicate did not match them, and the fix did not fix the reported bug.

The cause is a rule stated in OnExecutionStart itself: "a declared kind always wins". The workflow_step override is applied only when the creator declared nothing, and these records declare orchestrator. Their identity is in their ids (workflow-full-<parent>-step-<n>-<token>), which is exactly what isWorkflowStepTrackingExecution already recognises — so the predicate now delegates to that canonical classifier instead of re-deciding from Kind.

Why the tests did not catch it, which is the more important part. The reproduction constructed its orphans with Kind: "workflow_step" — the value the fix expected, not the value production stores. It therefore passed against a record shape that never occurs. This is the third time in this register that a test certified a fix by building the state it wanted instead of the state the product produces (PLAT-105's IC-11, PLAT-071's deleted call site, now this). Verified after correcting: reverting the predicate makes the reproduction fail with RunningChildren = 2, the exact live symptom.

Real kinds observed in production, for anyone extending this later: full_run (the parent), orchestrator (per-step progress records), message_sequence_item and sub_agent (real work — must keep holding a turn open), and workflow_step (rare, only where nothing was declared).

Simplification pass (2026-08-17): what was done, and what was rejected

After the fix landed, the surrounding machinery was reviewed for whether it is essential or accidental. background_agents.go is 2,642 lines with 36 notification-related functions, so the question was worth asking properly rather than assuming.

Done — the four notification booleans are now three concerns, not four flags. notified and notificationInFlight encoded a single lifecycle (none → in flight → delivered) as two independent booleans, making illegal combinations representable and forcing every reader to consult both. They are now one completionNotificationState. startNotified and terminalNotified were deliberately left alone: they are separate axes, not stages of the same machine, and merging them would have been a worse model, not a simpler one.

Done — deleted BackgroundAgentsStatusBar. It rendered a pill per background agent with a live elapsed timer, built purely by folding background_agent_started/completed events. It was exported from the events barrel and imported by nothing. Genuinely dead.

Rejected — deleting the progress mirrors outright. Investigated seriously, because no UI justification survives: the status bar above was dead, PLAT-112 turned off the diagnostic rail, and Global Monitor works entirely off session-level status and aggregate booleans (statusTone → headerStatusLabel), never per-step records. But two things make deletion the wrong move:

  1. They are registered in two stores, not one. OnExecutionStart calls both bgAgentRegistry.Register and trackWorkshopExecutionStart, and conversationTurnTreeSnapshot walks both. Removing the registry half leaves them in trackedWorkflowExecutions, still counted as running children, still orphanable — the same bug through the other door.
  2. PLAT-084 depends on them. scheduledWorkflowStepProducedEvidence reads exactly these records to tell Pulse that an execute_step-driven schedule did real work. Deleting them silently removes that evidence signal — the same class of failure this ticket is about.

So they are not legacy code; they are dual-purpose infrastructure of which exactly one use (vetoing turn completion) was wrong. Classification plus exclusion from liveness is the correct shape, not removal. Recorded here so this is not re-opened later as easy cleanup.

Rejected — merging the two pending queues. pendingCompletions and pendingStartNotifications have near-identical queue/drain/dedup helpers, which looks like an obvious dedup. It is not: pendingMu guards both the queue map and its completionRetryScheduled guard map, and the two are read together atomically in three files (e.g. server.go:8090). Extracting a queue type with its own mutex would split that lock, trading ~30 lines of trivial map code for a concurrency change in the delivery path that just caused a P0. Not worth it.

Built: the notification hold is now bounded

The design sketched here first was to close the completion race by ordering — register the owed continuation as a real tracked execution at completion time, so liveness never needs to read notification state. Investigating the delivery path before building it showed a simpler answer that is strictly better, so that design was dropped in favour of this one.

What the delivery path actually does: a queued completion is retried every 5s by a self-re-arming timer, and is explicitly discarded if the session becomes unreachable. So the legitimate hand-off window is seconds, and — this is the part that decides it — the hold only has any effect once nothing else in the tree is running, because a busy session keeps the tree alive on its own.

So the hold is now bounded rather than replaced. A finished-but-unnotified child still holds its turn open, but only for continuationHandoffGrace (2 minutes) after it completed. That is orders of magnitude more than any real hand-off needs, and it converts every stuck-notification path from a permanent hang into a bounded delay — including two beyond this ticket's own bug: the deliberate discard when a session goes unreachable with completions pending, and any future path that marks a child terminal without settling its notification.

Why this is better than the placeholder design. The placeholder had to be registered on every path that owes a continuation and resolved on every path that stops owing one — including the queue-fallback retry, where nothing is registered yet. A placeholder that leaks is the same permanent hang in a new place, so it would have traded a known bug for an unknown one. The bound needs no new state, cannot leak, and fails in the safe direction: worst case a turn completes two minutes later than ideal, never earlier than correct.

Verified by simulating the old unbounded behaviour (forcing the grace check to always pass): TestUnnotifiedChildHoldsTurnOnlyBriefly fails on the finished-long-ago case with RunningChildren = 1, and passes once restored, while the just-finished and inside-grace cases keep holding the turn open in both — so the race protection is demonstrably intact, not merely asserted.

Original design, superseded by the bound above

The remaining coupling is that conversationTurnTreeSnapshot reads notification state at all:

if (Completed || Failed) && !suppressNotification && !CompletionNotified {
    status = trackedExecutionStatusRunning
}

This exists to close a real race: a finished child is about to produce a continuation (a synthetic turn, or a steered message into a live turn), and declaring the tree terminal in that gap would let the scheduler advance to Pulse while the agent is still working. Holding the child "running" until its notification is confirmed closes the window.

The cost is that turn completion now depends on notification bookkeeping, so any path that marks a child terminal without marking it notified hangs the turn permanently — which is exactly how this ticket's bug worked.

The fix is to close the race by ordering rather than by a flag: when a child completes and a continuation is owed, register that continuation in the tree as a real tracked execution at completion time, and resolve it when the continuation actually starts or is suppressed. The steered path already does this (trackSyntheticConversationTurnStart is called before the child's notification hold is released, precisely so "the exact conversation tree can never appear terminal in the hand-off gap") — it simply is not the general rule. With a placeholder always present, liveness reduces to the two conditions it should have: the model gave its final message, and no real work is still running.

Why it was not built here. The queue-fallback path is the hard part: when a steer fails, the completion returns to the pending queue with a retry owed and no continuation registered. Dropping the flag before that path registers a placeholder would reopen the race in the early-completion direction — ending turns before their work is done, which is worse than ending them late. This is turn-lifecycle code on every scheduled run and deserves its own change with its own tests, not a same-session addition to the fix that was already verified.

2026-09-17 — Notification delivery ownership integration

The PLAT-106 notification-ownership follow-up protects the same background-agent registry and completion paths: registration cannot re-home an owned execution, and foreign-session ownership or a known foreign tracked parent excludes a completion from the destination's notification batch/live steer.

Ownership checks must not be interpreted as a redesign of notification liveness. This follow-up does not implement the continuation-placeholder proposal or remove the completion-notified hold described later in this ticket. Legitimate same-session completion/retry and progress-mirror behavior must remain intact; the focused background/notification and conversation-turn tests passed. Live verification remains a separate requirement.

Follow-up status: implemented and tested locally; not deployed; runtime re-verification pending. PLAT-106 remains the canonical implementation/test record. This note does not close the original ticket or change its assigned agent.