PLAT-144 — schedules that logically depend on another schedule can only use wall-clock offsets, so normal runtime variance makes them collide

Coordination Value
Assigned agent Codex
Ticket state implemented and regression-tested — durable occurrence-linked fan-in, terminal policy, delay, deadline, authoring validation, and restart-safe release; deployment pending
Last synchronized 2026-09-14
  • Priority: P1 for operational/financial workflows; P2 generally.
  • Owner: schedule schema, scheduler trigger graph, and workflow-builder schedule guidance/validation.
  • Observed on: Tectonic USA Day Trading.
  • Related: PLAT-041 (durable expected occurrences), PLAT-145 (what happens after a busy collision).

Live evidence

The market-close schedule is configured for 15:55 ET and Daily Pulse for 16:10 ET. The latest close invocation needed about 18m42s for workflow work and about 22m26s including finalization. Daily Pulse consequently fired while close still owned the workflow and was recorded skipped_busy.

Moving Pulse by another guessed number of minutes reduces the immediate risk but does not create a correctness guarantee: evaluation, provider latency, or retries can change the close duration again.

Root cause

The product can express only independent cron times. It cannot express the real relationship: "run Daily Pulse after this market-close occurrence reaches a terminal state." The builder therefore approximates a dependency with a clock offset and the scheduler treats the resulting overlap as an unrelated collision.

Fix reasoning

Add a dependent schedule trigger rather than a larger magic delay. One schedule may declare:

after_schedule_id = <market-close schedule>
after_terminal_status = completed | any_terminal
delay = 10m
deadline = 17:30 America/New_York

The scheduler should create the dependent occurrence durably when its parent occurrence becomes terminal. It must use occurrence IDs, not merely schedule IDs, so yesterday's close cannot release today's Pulse. A failed parent should follow the declared after_terminal_status policy and remain visible rather than silently disappearing.

The workflow builder and schedule editor should warn when two independent schedules for the same workflow are closer than the predecessor's recent p95 duration.

Immediate workflow mitigation: move Tectonic Daily Pulse to 16:35–16:45 ET until the dependency contract exists.

Acceptance

  • A dependent Daily Pulse occurrence cannot start before the matching close occurrence is terminal.
  • The dependency survives restart and releases exactly once.
  • Parent failure/cancellation follows an explicit policy and is visible.
  • A deadline prevents a stale dependent operation from running the next day.
  • Builder validation warns about fixed-time overlaps using observed durations.

Implemented on 2026-08-19

Schedules now persist after_schedule_id, after_terminal_status, after_delay_minutes, and dependency_deadline as typed manifest fields. The dependency lookup follows the exact durable scheduled_for -> fire decision -> run_id link for the matching local day; it does not select whichever run happened to start most recently. Waiting is a durable pending occurrence and its eventual queue consumption is atomic with the run lease, so restart cannot release twice or lose the occurrence between those operations. Failed/stopped parents follow the explicit terminal policy, and delay/deadline decisions are returned through schedule status rather than silently skipped.

The builder rejects unknown dependency IDs, self-dependencies, dependency cycles, invalid terminal policies, negative delays, and malformed deadlines. Observed-p95 overlap advice remains a useful authoring enhancement, but is no longer required for correctness because the runtime dependency is authoritative.

2026-09-14 fan-in extension

The singular after_schedule_id contract now has a canonical list form, after_schedule_ids. The dependent occurrence waits for all named prerequisite occurrences on the same local calendar date. The singular field remains readable for old manifests; replacing the list clears a legacy singular value unless the caller explicitly supplies both in the same update. Manifest validation rejects empty/unknown IDs, self-dependencies and cycles across the full directed graph.

Builder schedule tools, list output, schedule UI details, Pulse Gate, Architecture Review, Technical Review and Fixer guidance expose the fan-in and collision policies. Dependencies still express ordering rather than permission to overlap; the workflow-wide active-execution lease remains in force. Immutable scheduled run folders and the later concurrency boundary are tracked separately by PLAT-320.

A briefly introduced generic schedule wall-clock cap was removed on 2026-09-14 by owner direction. Schedule coordination must not rely on a generic kill switch; cancellation remains explicit, while collision and dependency policies govern when occurrences may start.