| Coordination | Value |
|---|---|
| Assigned agent | Unassigned |
| Ticket state | schema-v2 + reviewer prompt/tool cutover complete locally; deployment rollout pending |
| Last synchronized | 2026-09-18 |
| Priority | P2 simplification / migration |
Pulse currently spreads one product lifecycle across roughly twenty-five workflow-local SQLite tables: module state and audits, review notes and focus history, recovery, finding details and events, fix attempts and verifications, impact records, command state, telemetry and Activity projections. Much of this is bookkeeping for intermediate states rather than user-facing product truth. It increases tool count, prompt complexity, synchronization risk and the chance that Pulse spends more effort maintaining its own records than improving the workflow.
The intended product lifecycle is deliberately smaller:
review concludes -> issue reported/open -> action taken -> issue closed
There is no separate verification lifecycle. If Pulse cannot complete the fix, the issue remains open. A later review may add current evidence, but should not create a second semantic issue.
id
pulse_run_id
reviewer_type
status
summary
evidence
created_at
One row records the user-readable result of Plan Drift, Technical, Architecture or Strategic Review. Activity is derived directly from these rows; Pulse must not maintain a second notification-authored copy of the result.
id
review_id
description
evidence
status -- open | closed
action_taken -- empty while open; actual completed action when closed
created_at
updated_at
Do not add recommended_action, outcome, verification status, monitoring
status, fix attempts or a general issue-event ledger. When the same root cause
is encountered again, update the canonical issue's evidence and timestamp.
id
issue_id
question
options
status -- pending | answered
answer
created_at
answered_at
Every Pulse decision must belong to an open issue. Answering a decision does not itself claim that work was performed:
- approval leaves the issue open until the approved action is applied; then
action_takenis recorded and the issue closes; - rejection records the choice as
action_takenand closes the issue; - an unanswered decision remains pending and its issue remains open.
This replaces Pulse-specific use of the much broader
report_human_inputs/event/apply-contract lifecycle. General workflow
human_input steps remain outside this migration.
Implement only in a dedicated migration change, not opportunistically during other Pulse work.
- Back up every workflow database and introduce a new workflow contract/schema version.
- Create the three target tables alongside the existing tables.
- Backfill reviews from
pulse_module_audit:module -> reviewer_type,result -> status,reason -> summary, retained evidence ->evidence, andrecorded_at -> created_at. - Backfill one canonical issue by merging
run_concerns,pulse_finding_detailsand the latest useful lifecycle record. Collapse all unresolved intermediate states toopen; collapse resolved, rejected and successfully changed states toclosed. Copy the best truthful completed repair/resolution description toaction_taken; discard verification-only history. - Backfill Pulse-owned pending and answered rows from
report_human_inputsintopulse_decisions, preserving their link to the canonical issue. - Validate before cutover: every latest reviewer result is present, every
active public
PUL-*identity exists exactly once, every pending decision is visible, and every closed issue has a non-emptyaction_taken. - Switch
record_pulse_result, finding writes, decision writes, Gate reads, Pulse UI and Activity to the new model. Prefer one terminal review write that atomically stores its review and issue changes. - Stop legacy writes, retain old tables read-only for one release/rollback window, compare old and new UI results, then remove legacy tables and tools.
The migration should explicitly assess and normally remove or move out of the workflow Pulse model:
-
pulse_module_state,pulse_module_audit,pulse_review_notes,pulse_review_focus_state,pulse_review_focus_history,pulse_module_result_history,pulse_review_recovery,pulse_review_log; -
run_concerns,pulse_finding_details,pulse_finding_events,pulse_fix_attempts,pulse_fix_attempt_findings,pulse_fix_verifications; - Pulse-specific copies of human-decision event, claim and apply-contract state;
- Pulse command, context, shadow-signal and agent telemetry tables when their data belongs to the scheduler or platform telemetry instead;
- intervention/impact tables unless a separately approved product requirement demonstrates information that cannot be represented by the review, issue or action taken.
org_dashboard_notifications may remain for ordinary run notifications, but
Pulse Activity must read/project from pulse_reviews rather than storing a
second independently authored Pulse summary.
- A complete Pulse pass can be explained entirely from the three target tables.
- Reviewer results, open issues, closed actions and pending/answered decisions match the pre-migration UI on representative workflow databases.
- The runtime has no verification/monitoring/fix-attempt state machine for Pulse issues.
- Reporting an issue creates/updates one
openrow. Completing the fix writesaction_takenand closes it. Failure to fix leaves it open. - Activity displays the stored review summary without a publish/update tool or duplicate prose record.
- Migration is reversible during the rollback window and never silently drops an active issue or pending human decision.
The reversible schema and data-migration phase is implemented locally:
- every server startup scans available workflow
db/db.sqlitefiles before schedules start, while each Pulse database open also performs the same idempotent version check for laptops or deployments that were offline; - schema version 1 creates
pulse_reviews,pulse_issuesandpulse_decisions, backfills their product truth, validates invariants and records the version only after the transaction commits; - databases with legacy Pulse data receive a consistent, integrity-checked,
read-only backup under
db/migrations/.backups/before mutation; - partial/old schemas do not abort the fleet-wide scan, and a failure is isolated to that database and retried on its next open;
- temporary compatibility projections keep the compact records current while legacy tables remain available for one rollback window.
This is phase 1, not permission to drop legacy data. Gate/UI/Activity cutover, legacy tool removal, and final table deletion remain the next rollout phase after representative databases have been compared successfully.
The first single-workflow canary completed on 2026-09-18. No other workflow database was migrated.
- schema version 1 is recorded and a second targeted run is a no-op;
- both the current database and its read-only pre-migration backup pass
PRAGMA integrity_check; - the schema-v1 canary exposed a filtering defect: eight retired
health/reviewer module identities were initially copied into
pulse_reviewsalongsidetechnical_reviewandstrategic_review; - schema v2 now admits only the four current review identities and maps the supported Technical and Strategic legacy aliases to their current names;
- the corrected testing canary contains only
technical_reviewandstrategic_review; its currently available legacy data also produced one canonical issue and one linked decision.
The corrected migration was then applied to the broader local workspace:
- 14 real database paths were scanned;
- 11 additional workflow databases migrated,
Workflow/testingwas already current, and two unrelated databases were skipped; - all 12 migrated workflow databases are at schema version 2, pass
PRAGMA integrity_check, contain zero retired reviewer identities, and pass a second idempotency run with no additional migrations; - 29 temporary test databases under
workspace-docs/varand three duplicated absolute-path artifacts underworkspace-docs/Usersare now excluded from deployment scans.
This completes the local data rollout. RTS, other laptops and deployments such as Confida will migrate through the same startup and lazy-open guards only after this code is deployed there; they have not been changed by the local run.
The reviewer-facing contract is also updated locally:
- Plan Drift, Technical, Architecture and Strategic skills now persist one concise terminal review result and canonical issues; they do not ask for separate focus, recommendation, verification, impact, assessment or publication records;
- Strategic Review keeps optional strategic focus areas as reasoning lenses, not a focus-history ledger. Technical and Architecture select scope from the evidence in front of them;
- Gate writes only its small platform scheduling receipt. Workflow/evaluation steps and collectors own metric observations;
-
record_pulse_resultis the user-visible Activity summary, removing the need for a second publish/update action; -
record_pulse_impactis no longer registered in the reviewer or Workshop tool surface. Its implementation remains temporarily as rollback-window code while legacy tables still exist; - the old
focusesresult field andfocus_agendaread remain accepted only as compatibility data for this rollback window and are explicitly excluded from new reviewer instructions.
The repair executor still translates changed files, immediate checks and the canonical issue outcome through legacy lifecycle fields behind the compact contract. Removing that compatibility translation, switching every UI/read path to the three compact tables, and dropping the retired tables remain the post-deployment cutover.
The compact schema is an enabler, not the complete reviewer improvement. It reduces bookkeeping only after Gate, reviewer prompts, tools, Activity and the Pulse UI stop asking reviewers to maintain the legacy focus, disposition, verification, impact and publication records.
After that cutover, a reviewer should have only three persistence actions:
- record one concise review result;
- open or update a canonical issue when action is needed;
- record a human decision only when work genuinely requires one.
This should leave more model context and tool turns for inspecting run evidence, reasoning about goals and making or validating changes. Strategic Review should benefit most, because it can spend its run comparing outcomes with goals rather than maintaining lifecycle receipts. The skill/tool cutover should reduce that bookkeeping immediately, but its effect on review quality must still be measured after deployment. Compatibility writes remain behind the compact contract until the rollback window closes.