-
Notifications
You must be signed in to change notification settings - Fork 1
Helena Project Update 3
This week was focused on developing the requirements document for Hephaestus and revising the Project Description document. The revision of the Project Description document was turned in on Wednesday after adding more of a focus on the software side of the project. The first draft of the requirements document will be turned in by the end of the day today. I focused on creating the outline of the document and writing the introduction. The introduction establishes a purpose and description of the document, an overview of the mission description, the mission success criteria, and the priorities for the requirements. The rest of the document describes the functional and non functional requirements that we have established for the software that controls the Hephaestus payload.
The next week will focus on creating a solid final draft of the Requirements Document and presenting PDR. That will require meeting as a group to practice presenting PDR and meeting as a group to present PDR.
Availability has been a problem this week. It has been a challenge to fit all of the large group meetings into my schedule and still have time to catch up on homework after Grace Hopper and work.