Skip to content

Electrical

Stubb edited this page May 5, 2026 · 9 revisions

House Bank

image

LiFePO₄ across 10 × 12V WattCycle 100Ah bluetooth (internal BMS) batteries. 9 are in the main house bank, one is dedicated to the Electroscan macerator ("electropooper").

Three different capacity numbers are all valid for different things:

  • House bank nominal: ~10.8 kWh (9 × 100Ah × 12V)

  • Total system nominal: ~12 kWh (includes the 10th battery dedicated to the Electroscan)

  • Actual realized: ~11.5 kWh per BMSes when fully charged — not all batteries reach a true 100Ah. This is the right figure for power-budget math (see Jimmy-Shower).

  • Main house bank is in starboard salon (relocated from lazarette — see Interior for rationale & layout)

  • Main house battery box is King StarBoard

Engine Electrical

A single AGM starter battery in a battery box under the engine bed (Interstate 27M-XHD, 100Ah).

Charging System

Alternator

  • Balmar 120A with MC-614 external regulator (still installed)
  • Serpentine belt conversion on the Yanmar 4JH2E
  • Currently only feeds the starter battery (oversized for a single AGM)

Planned upgrade

Reset the Balmar regulator and add a Victron DC-DC charger to feed the house bank.

Inverter/Charger

Clone this wiki locally