Every work product of the assurance record with its current version, status and the date it last changed. Versions here: the change ledger, row 18291 (c4e00163, 2026-11-16).
Nobody types these numbers. Each version is computed by the change ledger from the merged changes, in the form X.Y.Z:
| Part | Goes up when | Resets |
|---|---|---|
| X | A gate approves the work product (recorded in gate-approvals.yaml). 0 means not yet approved | Y and Z |
| Y | A merged change alters its content | Z |
| Z | A merged change only fixes wording, links or layout (label editorial) |
The ledger started from the version each header carried at the time (0.68 became 0.68.0), so a work product with
X above 0 that no gate has approved kept that number from before the ledger. A version shown as 0.68.0+1 has one
change the ledger has not recorded yet; it catches up at the next ledger run.
The same version is printed on every exported copy of a work product, with a footer on each page and its revision history (how to export). The status is the one in the work product's own header.
| Work product | Version | Status | Last changed |
|---|---|---|---|
| WP-A-01 ASIL Decomposition Rationale | 0.7.0 | Draft | 2026-10-19 |
| WP-A-02 Coexistence of Elements and Freedom from Interference | 0.14.0 | Draft | 2026-10-27 |
| WP-A-03 Dependent Failure Analysis | 0.24.0 | Draft | 2026-10-27 |
| WP-A-04 System-Level Safety Analyses (FTA, FMEA) | 1.21.0 | Draft | 2026-10-29 |
| WP-A-05 System-Theoretic Process Analysis (STPA) | 0.15.0 | Draft | 2026-10-26 |
| WP-C-01 Item Definition | 0.24.0 | Draft | 2026-10-26 |
| WP-C-02 ODD and Intended Functionality Specification | 0.12.0 | Draft | 2026-10-25 |
| WP-C-03 Hazard Analysis and Risk Assessment (HARA) | 0.12.1 | Draft — ratings are proposals for review. They are not approved and must not be used to argue safety until the confirmation review | 2026-10-30 |
| WP-C-04 Functional Safety Concept | 0.32.0 | Draft | 2026-11-01 |
| WP-C-05 SOTIF Hazard Identification and Risk Evaluation | 0.11.1 | Draft | 2026-10-30 |
| WP-C-06 Functional Insufficiencies and Triggering Conditions | 0.7.0 | Draft | 2026-10-30 |
| WP-C-07 Functional Modifications Addressing SOTIF Risk | 0.6.0 | Draft | 2026-10-30 |
| WP-C-08 Driver Interaction, HMI and Foreseeable Misuse Analysis | 0.8.0 | Draft | 2026-10-23 |
| WP-C-09 Threat Analysis and Risk Assessment (TARA) | 0.10.0 | Draft — ratings are engineering proposals for review, not approved. They must not be used to argue cybersecurity until the preliminary assessment | 2026-10-26 |
| WP-C-10 Cybersecurity Goals, Claims and Concept | 0.8.0 | Draft — goals and CAL proposals are for review; not approved until the preliminary cybersecurity assessment passes | 2026-10-26 |
| WP-C-11 AI System Definition and AI Safety Requirements | 0.9.0 | Draft | 2026-11-02 |
| WP-C-12 Item and Environment Models | 0.1.0 | Draft. AI-drafted | 2026-10-24 |
| WP-H-01 Hardware safety requirements specification | 0.11.0 | Draft | 2026-11-02 |
| WP-H-02 Hardware architectural and detailed design | 0.15.0 | Draft | 2026-11-13 |
| WP-H-03 Hardware safety analysis (FMEA / FMEDA) | 0.12.0 | Draft | 2026-11-13 |
| WP-H-04 Hardware architectural metrics (SPFM, LFM) | 0.13.0 | Draft | 2026-11-02 |
| WP-H-05 Evaluation of safety goal violations due to random hardware failures (PMHF) | 0.8.0 | Draft | 2026-11-01 |
| WP-H-06 Hardware integration and verification specification and report | 0.13.0 | Draft | 2026-10-27 |
| WP-H-07 Qualification of hardware components | 0.5.0 | Draft | 2026-11-01 |
| WP-K-01 Safety Case | 0.9.1 | Draft — living document. At this baseline the argument structure is defined; almost all evidence is missing or partial. This safety case does not support any release or public-road claim | 2026-10-30 |
| WP-K-02 SOTIF Achievement Evaluation and Release Argument | 0.3.1 | Skeleton — structure, criteria and evidence checklist only. The evaluation has not been performed. Results sections are templates marked "Not yet executed" | 2026-10-30 |
| WP-K-03 Cybersecurity Case | 0.3.0 | Draft — argument structure written; almost all evidence is Missing or Partial. This case does not support a release at this version | 2026-10-28 |
| WP-K-04 Functional Safety Assessment (Plan and Report) | 0.2.0 | Skeleton — plan and report template. No assessment has been performed and no assessor has been engaged | 2026-10-12 |
| WP-K-05 Cybersecurity Assessment (Plan and Report) | 0.1.0 | Skeleton — plan and report template. No assessment has been performed and no assessor has been engaged | 2026-10-09 |
| WP-K-06 Release Record | 0.4.0 | Skeleton — template. No LionDriver release has been made. One copy of §2–§8 is filled per release | 2026-11-11 |
| WP-M-00 Work Product Register | 0.5.0 | Draft | 2026-10-24 |
| WP-M-01 Assurance Strategy and Lifecycle Tailoring | 0.11.0 | Draft | 2026-10-23 |
| WP-M-02 Functional Safety Plan | 0.7.0 | Draft | 2026-10-23 |
| WP-M-03 Project Plan | 0.11.0 | Draft | 2026-10-23 |
| WP-M-04 Organization-Specific Rules, Safety Culture and Competence Management | 0.4.0 | Draft | 2026-10-19 |
| WP-M-05 Quality Management and Quality Assurance Plan | 0.4.0 | Draft | 2026-11-11 |
| WP-M-06 Confirmation Measures Plan | 0.5.0 | Draft | 2026-10-23 |
| WP-M-07 Project Risk Management Plan and Register | 0.11.0 | Draft | 2026-11-11 |
| WP-M-08 SOTIF Plan | 0.10.0 | Draft | 2026-11-02 |
| WP-M-09 Cybersecurity Plan | 0.10.0 | Draft | 2026-11-11 |
| WP-M-10 AI Safety Management Plan | 0.4.0 | Draft | 2026-11-02 |
| WP-M-11 Upstream and Supplier Management | 0.3.10 | Draft | 2026-11-11 |
| WP-M-12 Impact Analysis of the openpilot-Derived Baseline | 0.4.0 | Draft | 2026-10-20 |
| WP-M-13 ASPICE Capability Baseline (Self-Assessment) | 0.5.0 | Draft | 2026-10-23 |
| WP-M-14 ISO 26262-6 Software Lifecycle Implementation Specification | 0.6.0 | Draft. Phase A | 2026-11-11 |
| WP-O-01 Installation, Provisioning and Production Control | 0.6.0 | Draft | 2026-11-11 |
| WP-O-02 Operation, Service and Decommissioning | 0.3.0 | Draft | 2026-10-26 |
| WP-O-03 User Information and Safety Warnings | 0.4.0 | Draft | 2026-10-23 |
| WP-O-04 Field Monitoring and Crash Reporting | 0.5.0 | Draft | 2026-11-11 |
| WP-O-05 Cybersecurity Incident Response, Vulnerability Management and Software Updates | 0.7.0 | Draft — process defined; not running. No monitoring, intake or incident record exists yet | 2026-11-11 |
| WP-P-01 Configuration Management Plan | 0.6.0 | Draft | 2026-10-22 |
| WP-P-02 Change Management Plan | 0.5.0 | Draft | 2026-11-12 |
| WP-P-03 Problem Resolution Management | 0.3.0 | Draft | 2026-10-14 |
| WP-P-04 Documentation Management | 0.8.0 | Draft | 2026-11-12 |
| WP-P-05 Verification and Review Procedure | 0.1.0 | Draft | 2026-10-11 |
| WP-P-06 Requirements Management and Traceability Procedure | 0.3.0 | Draft | 2026-10-22 |
| WP-P-07 Software Tool Classification and Qualification | 0.9.36 | Draft | 2026-11-12 |
| WP-P-08 Qualification of Software Components | 0.4.0 | Draft | 2026-10-23 |
| WP-P-09 Proven-in-Use Argument Evaluation | 0.1.0 | Draft | 2026-10-09 |
| WP-P-10 Release Management and Baseline Procedure | 0.7.0 | Draft | 2026-11-11 |
| WP-S-01 System Requirements Specification (Functional, Non-Safety) | 0.8.0 | Draft | 2026-10-26 |
| WP-S-02 Technical Safety Requirements Specification | 0.69.0 | Draft | 2026-11-16 |
| WP-S-03 Technical Safety Concept and System Architectural Design | 0.25.0 | Draft | 2026-11-01 |
| WP-S-04 Timing Analysis: FTTI, Fault Detection and Reaction Budget | 0.31.0 | Draft — kinematic estimates and code-derived times, cross-checked in simulation | 2026-11-02 |
| WP-S-05 Hardware-Software Interface (HSI) Specification | 0.25.0 | Draft | 2026-11-16 |
| WP-S-06 Requirements for Production, Operation, Service and Decommissioning | 0.5.0 | Draft | 2026-11-02 |
| WP-S-07 Cybersecurity Requirements and Architectural Design | 0.12.0 | Draft — requirements are proposals derived from code review and the concept; not verified, not approved | 2026-11-03 |
| WP-S-08 System Integration and Test | 0.9.0 | Draft | 2026-11-02 |
| WP-S-09 System Verification (Qualification) | 0.7.0 | Draft | 2026-10-26 |
| WP-V-01 Safety Validation | 0.12.0 | Draft | 2026-11-02 |
| WP-V-02 SOTIF Verification and Validation Strategy | 0.16.2 | Draft | 2026-11-02 |
| WP-V-03 Evaluation of Known Hazardous Scenarios | 0.13.0 | Draft | 2026-11-02 |
| WP-V-04 Evaluation of Unknown Hazardous Scenarios | 0.10.0 | Draft | 2026-10-26 |
| WP-V-05 Fault Injection | 0.14.0 | Draft | 2026-11-01 |
| WP-V-06 Cybersecurity Validation and Penetration Testing | 0.4.0 | Draft — plan and specification written; no validation or penetration test has been executed and no tester is engaged | 2026-10-23 |
| WP-V-07 Vehicle Test Operations and Safety-Driver Procedures | 0.4.0 | Draft | 2026-11-02 |
| WP-W-01 Software Development Environment, Languages and Coding Guidelines | 0.8.0 | Draft | 2026-11-02 |
| WP-W-02 Software Safety Requirements Specification | 0.55.0 | Draft | 2026-11-11 |
| WP-W-03 Software Architectural Design | 0.22.0 | Draft | 2026-11-02 |
| WP-W-04 Software Safety Analysis and Software-Level Dependent Failure Analysis | 1.8.0 | Draft | 2026-11-02 |
| WP-W-05 Software Unit Design and Implementation | 0.9.8 | Draft | 2026-11-03 |
| WP-W-06 Software Unit Verification Specification and Report | 0.6.8 | Draft | 2026-11-02 |
| WP-W-07 Software Integration and Verification Specification and Report | 0.3.0 | Draft | 2026-10-13 |
| WP-W-08 Testing of the Embedded Software | 0.4.3 | Draft | 2026-11-11 |
| WP-W-09 Safety-Related Configuration and Calibration Data | 0.7.0 | Draft | 2026-10-27 |
| WP-W-10 ML Engineering | 0.5.0 | Draft | 2026-11-11 |
| WP-W-11 Cybersecurity Implementation and Verification | 0.8.0 | Draft — rules and plan proposed; no verification activity of this plan | 2026-11-11 |
Built at c4e0016, 2026-11-17.
Mirrored from wiki/ on liondriver-dev at c4e0016, 2026-11-17. Pages are reviewed by pull request; the wiki is not edited in place. This wiki explains and links; safety claims and evidence live in the assurance record. Work-product versions: the change ledger, row 18291 (c4e00163, 2026-11-16) (all versions).
LionDriver wiki
- Home
- Roadmap and status
- How LionDriver works
- How the repository is organized
- How decisions are made
- Glossary
- What is a safety case?
- Reading the Living Safety Case
- Standards at a glance
- From hazard to test
- Deriving and writing safety requirements
- ASIL decomposition
- Building a fault tree
- Hardware safety and interference
- After release (ISO 26262 Part 7)
- SOTIF and ISO 26262
- Cybersecurity and ISO/SAE 21434
- AI safety and ISO/PAS 8800
- ASPICE: is the process capable?
- Integrated standards: one system, not five
- For the assessor
- Work product versions
- Reference vehicle
- CAN, CAN FD and end-to-end protection
- Contributor guide
- Reporting a safety concern
- Session log
- FAQ
Repository