Implementation Kickoff: Phase 0 Execution

Status: Phase 0 approved; global AC mock-oracle gate passed at 99/100; Phase 1A in progress
Requirements baseline: word_association_game_requirements.md v2.6
Execution date: 26 October 2026
Target: sharpninja/wordpairs

1. Current baseline

The user approved Phase 0 on 26 October 2026. Planning artifacts and the v2.6 baseline are approved. The global test-only AC/TR suite passes 316 tests: 67 primary AC scenarios, 27 supplemental scenarios, four separate TR-19 reaction contract cases, and 112 named AC semantic controls. The exact-commit hostile review at b9e7dee8b93a9639c56fe3348595bfa7e38f4d86 scored 99% accuracy and 100% completeness. Phase 1A adds five skeleton checks; the current combined suite passes 321 tests. Typecheck, lint, and local Next.js build pass. Only the app shell and empty DDD module roots exist; gameplay behavior remains unimplemented.

The requirements contain 22 functional requirements, 31 technical requirements, and 45 active acceptance criteria. The six retired IDs AC-34, AC-35, AC-36, AC-40, AC-48, and AC-49 remain reserved and are verified only through their mapped technical requirements. ac_test_inventory.md maps all 45 active ACs to 67 test oracles. The oracle suite proves assertion sensitivity, not product conformance. The user approved the v2.6 baseline, architecture, interface contracts, and Phase 0 exit. All product choices affecting active AC expected results are resolved.

2. Phase 0 gate status

Gate Current evidence Status Remaining work
Requirements baseline Requirements v2.6; 45 active ACs (51 numbered IDs including six retired TR-only IDs); all FR/TR IDs mapped in architecture_design.md Approved by user Record approval in the Phase 0 receipt; any later behavior change requires a formal requirements and test change.
DDD and concurrency direction Modular monolith, context split, ports/adapters, aggregate transactions, idempotency, outbox and SVG diagrams in architecture_patterns.md and architecture_design.md Approved for implementation ADR and interface contracts are recorded; evolve only through reviewed requirements/design changes.
Test traceability 45 active ACs map to 67 primary case IDs plus 27 supplemental scenarios; deployment-only IDs are TR-only Global mock-oracle gate passed exact-commit review at 99/100; 112 semantic controls are included Run the same reusable assertions against real behavior as each increment is implemented; keep product-conformance evidence distinct. TR and deployment checks never count as AC coverage.
Test-harness bootstrap Test tooling and licenses are documented in ATTRIBUTIONS.md; package-lock.json records installed dependencies 316 global mock-oracle tests and five Phase 1A tests pass; Next build, typecheck, and Biome lint pass locally Candidate includes full-schema/source/archive/notices validation, snapshotted driver requests, concrete supplemental AC scenarios, separate TR-19 tests, and module-boundary tests. Gameplay behavior remains unimplemented.
Deployment topology Vercel Hobby + Supabase Free, no GitHub Actions, manual provisioning, SWBOM/release gates documented Constraints accepted; deployment follows coding Do not provision or deploy during coding Phases 1–6. Finalize branch/project mapping and verify account capacity at Phase 7 entry. These TR checks do not change AC expectations.
Data/security design DDD ownership, projection boundaries, and candidate persistence/security contracts are documented Approved design baseline Implement and validate the schema/security contract through tests before the Phase 1 persistence adapter.
Public interfaces and data contracts Approved commands, queries, typed failures, event audiences, logical relations, RLS and transaction invariants are documented in phase0_interface_and_data_contracts.md Approved design baseline Translate the approved contracts into executable test names/paths; any technical change requires corresponding test updates.
Delivery order Coding Phases 1–6 and post-coding deployment Phase 7 are in implementation_plan.md Documented Confirm AC-to-increment allocation, test IDs/owners, and evidence tiers; perform deployment only after coding Phase 6 is complete.

3. Approved architecture decision

This is the selected v2.6 stack recorded in the approved architecture ADR. Requirements specify Vercel, Supabase, the Free/Hobby tiers, Git-based Vercel deployment, no GitHub Actions, and GPL-2.0-only; the draft resolves the framework and package manager as Next.js/TypeScript/npm.

Decision Proposal Reason / constraint
Application Next.js with TypeScript, deployed as one modular monolith on Vercel Matches Vercel target; supports server-owned use cases and public/server projections without splitting the domain into services.
Package manager npm with committed package-lock.json TR-27 and SWBOM workflow already specify the exact npm lockfile as inventory input.
Test stack Vitest for domain/use-case tests; MSW and explicit fakes for network/port boundaries; Testing Library for UI behavior; Playwright for browser acceptance Keeps domain tests independent of production services while permitting component and multi-client acceptance tests. No dependency may be installed until the compatible version/license review is recorded.
Persistence Supabase Postgres with versioned SQL migrations and server-only privileged adapter Required by TR-22; Postgres transactions are the room serialization boundary.
Realtime Supabase Realtime transports committed, audience-filtered outbox events; clients refetch authorized projections after reconnect Keeps Postgres authoritative and delivery retry-safe.
Environments Proposed post-coding layout: local Development; isolated Supabase Staging project targeted by a protected staging Vercel Preview branch; Production on main and a separate Supabase project The proposal fits the stated free-tier limit and keeps Preview away from Production. It is not a Phase 0 approval gate; confirm account availability and finalize branch/project mapping at Phase 7 entry after coding.
Runtime behavior Domain/app modules use ports for DB, identity, clock, random source, scheduler, quota and event delivery Enables mock-first tests and prevents framework/services from owning game rules.

ADR approval is complete: the selected Next.js/TypeScript/npm stack, DDD boundaries, dependency/license baseline, application interfaces, schema/RLS, transaction model, and deadline scheduler contract are approved for test authoring. If test design reveals a semantic gap, revise the relevant requirement/contract and traceability before implementation. Deployment tooling remains post-coding Phase 7 work.

4. Phase 0 approvals and closure

All product decisions affecting active AC expected results are resolved in Requirements v2.6. Phase 0 was closed by the user approval recorded in phase0_approval_receipt.jsonl. The approved requirements, ADR, technical interfaces and schema/security contracts are the baseline for the global test gate. Any later change must update affected expected results and traceability before implementation.

Accountable roles and approval order

The user approved the Phase 0 baseline and exit on 26 October 2026. The implementation owner records test/mock evidence, implementation increments and review receipts. Any change affecting requirements or expected results returns through requirements and test review before code changes.

Phase 0 approval is complete; the global mock-oracle gate is awaiting independent re-review after correction. The candidate contains 67 primary AC scenarios plus 27 supplemental scenarios, checked against independent expectations and semantic controls. Four additional TR-19 reaction cases remain separate from AC coverage. This is mock assertion sensitivity evidence, not product conformance. The next steps are:

  1. Record the exact gate evidence: keep test IDs, commands, results, hashes, and boundary limits in test_execution_receipt.jsonl.
  2. Hostile review: independently review the exact remote commit and iterate until accuracy and completeness both score at least 98%.
  3. Phase 1A entry: after that review passes, begin production implementation with BDP v4 Red/Green/Refactor. Run the unchanged oracles against real behavior incrementally and record product conformance separately.

The v2.6 decision register resolves all product outcomes. Phase 0 approval and the global mock-oracle gate are complete; Phase 1A is in progress. Deployment topology and account eligibility remain post-coding Phase 7 work.

The v2.6 requirements decision register records resolved defaults. Future changes that affect expected behavior require a baseline update and corresponding test-specification revision before implementation.

Phase 7 entry decision — deployment topology (after coding; not a Phase 0 gate)

After coding Phases 1–6 and before deployment execution for TR-20–TR-29, finalize the protected staging branch and Vercel Preview mapping, separate Staging/Production Supabase project allocation, account capacity, and Preview/Production variable scopes. This operational mapping does not change active AC contract expectations and is not required for Phase 0 exit. Mockable TR tests can validate branch/environment separation and fail-closed behavior using abstract identifiers; actual account eligibility and deployed settings are TR-only integration/operational evidence, never AC coverage.

Phase 7 deployment-entry checklist:

  • Confirm current Vercel Hobby eligibility and Supabase Free account capacity after coding is complete.
  • Approve the branch-to-environment mapping and separate Staging/Production project allocation.
  • Verify Preview and Production variable scopes before provisioning or deployment.

5. Phase 1 test and implementation package: core application foundation

This is the Phase 1 test-authoring and implementation plan. Its planned cases must be replaced with executable test names/paths, exact expected outcomes, mock behavior, and separate non-mock evidence. All active-AC tests must be executable and mock-validated before the first project implementation code.

ACs Planned cases Mock-backed test responsibilities before implementation
TR-22–23 TR-23-T01–TR-23-T03 Mock persistence/use-case contracts and migration fixtures support application coding. Provisioning CLI behavior is specified for Phase 7 and implemented only after coding. Disposable database checks remain TR-only integration evidence.

| AC-37, AC-39 | AC-37-T01, AC-39-T01 | Mock quota port and fixture manifest/lockfile validate recoverable service limits and attribution records without any deployment dependency. | | AC-51 | AC-51-T01–AC-51-T04 plus separate TR-30-T01–TR-30-T02 and TR-31-T01–TR-31-T06 checks | Active-AC mock contracts cover domain boundaries/conflict policy/idempotency/outbox intent; distinct later local/disposable DB integration tests verify actual capacity, uniqueness and atomic durability. |

Post-coding deployment TR contracts

Specify these now, but implement/run them only after coding Phases 1–6 are complete. Validate each mockable TR contract before its Phase 7 tooling is written. None contributes to AC coverage.

TR Planned cases Mock-backed contract
TR-20, TR-24 TR-20-T01, TR-24-T01 Fake Vercel metadata/config verifies repository and branch mapping and no GitHub Actions dependency.
TR-21 TR-21-T01 Fake configuration evaluator rejects paid tiers/add-ons; account eligibility is checked in Phase 7.
TR-23 provisioning TR-23-T02–TR-23-T03 Fake CLI/temp filesystem verifies safe reruns, secret redaction and environment separation.
TR-26–27 TR-26-T01, TR-27-T01 Fake test runner/build metadata and temporary output verify fail-closed ordering and fixture SWBOM generation.
TR-28–29 TR-28-T01, TR-29-T01 Temporary source archive and fixture SWBOM/license verify required paths/notices without deployment.

The 67 active-AC IDs have reusable scenario assertions. The exact-commit 99/100 hostile review confirmed archive, driver, AC-38 and evidence fixes. The 316-test mock suite passes. The global gate has passed; during Phase 1A, retain the reusable assertions and begin recording real product conformance separately. During implementation, run those unchanged assertions against the real system and record actual product conformance separately.

6. Phase 0 exit checklist

  • Approve the ADR recording the selected stack and architecture.
  • Assign every active AC (45 total) to an increment, test IDs, expected outcome, evidence type, owner and blocked decision; keep retired deployment IDs in TR-only verification records.
  • Approve Phase 0 application interfaces, schema, RLS, transaction/idempotency/outbox, quota and deadline contracts. Provisioning, build-gate, and artifact-verification interfaces belong to the post-coding Phase 7 deployment plan.
  • Approve phase0_interface_and_data_contracts.md, including logical schema, idempotency, transaction/locking, outbox, RLS and secret boundaries for the foundation slice.
  • Review current direct dependency versions/licenses and update ATTRIBUTIONS.md; test tooling and the Phase 1A Next.js/React runtime dependencies are locked and attributed. Other planned runtime integrations remain for later increments.
  • Complete all planning/design/decision work; keep this checklist free of executable test or implementation tasks.

Current gate: Phase 0 was approved by the user on 26 October 2026; see phase0_approval_receipt.jsonl. The global AC mock-oracle gate passed exact-commit review at b9e7dee8b93a9639c56fe3348595bfa7e38f4d86 with 99% accuracy and 100% completeness; see repo_review_receipt.jsonl. Phase 1A is authorized. The passing suite validates mock assertions only and does not establish product behavior. Deployment remains Phase 7 after coding Phases 1–6; database/platform checks remain TR evidence separate from AC coverage.

Clone this wiki locally